This is a supplemental specifications document for the City of Wichita, Kansas, issued by WSP USA for the Aquifer Storage and Recovery (ASR) Phase III, Recharge Basins Project (Owner's Project Number 448-2023-040460). The project manual, designed by WSP USA Environment and Infrastructure and dated July 17, 2026, provides comprehensive technical specifications for construction services required by the Public Works & Utilities Department. The document establishes detailed requirements for concrete work, including cast-in-place concrete, precast structural concrete, reinforcement materials, formwork, finishes, and related construction methods. Specifications cover multiple divisions including concrete (Divisions 3-4), metals (Division 5), thermal and moisture protection (Division 7), openings (Division 8), finishes (Division 9), plumbing (Division 22), HVAC (Division 23), electrical (Division 26), earthwork (Division 31), utilities (Division 33), and process interconnections (Divisions 40 and 43). The document includes detailed technical requirements for concrete mixtures (Class A and B), surface finishes, curing procedures, quality control testing, and installation tolerances in accordance with ACI standards and PCI guidelines.
The specifications establish minimum compressive strength requirements of 4,000 psi at 28 days for both Class A and Class B concrete, with maximum water-cement ratios of 0.45 and specific exposure class designations per ACI 318. Precast structural concrete units include thin-brick-faced panels manufactured to specified dimensions and quality standards, with fabrication tolerances and finishing requirements per PCI MNL 116. The document mandates preconstruction testing, field quality control inspections, and special inspections for welds and bolted connections. Material certifications, shop drawings prepared by qualified professional engineers, and compliance with standards from ACI, ASTM, AWS, and other governing bodies are required throughout the project. Testing agencies must be engaged to verify concrete strength, consolidation, air content, slump, and other parameters, with detailed reporting requirements and acceptance criteria for all concrete mixtures and structural components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-260221 Bid Table.pdf | ||
| 3-BP 448-2023-040460.pdf | ||
| 6-Add01 448-2023-040460.pdf | ||
| 7-448-2023-040460 Add 1 Exhibit A.pdf | ||
| 4-260221 Bid Table Add01 Rev.pdf | ||
| 5-448-2023-040460 KS20260162.pdf | ||
| 8-Add02 448-2023-040460.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL SPECIFICATIONS
CITY OF WICHITA
WICHITA, KANSAS
AQUIFER STORAGE AND RECOVERY (ASR)
PHASE III, RECHARGE BASINS
PROJECT MANUAL
DESIGNED BY: WSP USA, Environment and
Infrastructure
245 North Waco Avenue
Suite 100
Wichita, Kansas 67202
DATE ISSUED: July 17, 2026
PROJECT NO.: WSP: US-EI-8275000508
WSP USA, Environment and Infrastructure
AQUIFER STORAGE AND RECOVERY (ASR) PHASE III, RECHARGE BASINS 07/17/2026
City of Wichita, Kansas
SEALS PAGE 000107 - 1
DOCUMENT 000107 - SEALS PAGE
1.1 OWNER’S PROJECT NUMBER: 448-2023-040460
1.2 PROJECT TITLE: AQUIFER STORAGE AND RECOVERY (ASR) PHASE III, RECHARGE
BASINS
1.3 THE SEALS THAT FOLLOW APPLY TO THE PROJECT MANUAL IN WHICH THIS
SEALS PAGE IS BOUND FOR THE PROJECT IDENTIVIED ABOVE.
END OF DOCUMENT 000107
7/15/202617
This seal applies only to the Structural Specification Sections.
DIV. 22 AND 23 ONLY
7/14/2026 tdomann Rectangle Sketch to Scale
0.03 sf
City of Wichita, Kansas
TABLE OF CONTENTS 000110 - 1
DOCUMENT 000110 – TABLE OF CONTENTS
INTRODUCTORY INFORMATION
Document 000101 Project Title Page ................................................................................................... 01 Pages
Document 000107 Seals Page ............................................................................................................... 02 Pages
Document 000110 Table of Contents ................................................................................................... 04 Pages
FACILITY SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS
Not Used.
DIVISION 2 – EXISTING CONDITIONS
DIVISION 3 – CONCRETE
Section 031000 Concrete Forming and Accessories ........................................................................ 05 Pages
Section 032000 Concrete Reinforcing ............................................................................................ 03 Pages
Section 033000 Cast-In-Place Concrete ........................................................................................... 15 Pages
Section 034100 Precast Structural Concrete .................................................................................... 17 Pages
Section 034816 Precast Concrete Splash Block ............................................................................... 02 Pages
DIVISION 4 – MASONRY
DIVISION 5 – METALS
Section 052100 Steel Joist Framing ................................................................................................. 03 Pages
Section 053100 Steel Decking ......................................................................................................... 05 Pages
Section 055000 Metal Fabrications .................................................................................................. 07 Pages
Section 055015 Access Ladders ....................................................................................................... 05 Pages
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES
Section 061000 Rough Carpentry .................................................................................................... 04 Pages
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
Section 071900 Water Repellents .................................................................................................... 03 Pages
Section 072100 Thermal Insulation ................................................................................................. 03 Pages
Section 072715 Nonbituminous Self-Adhering Sheet Air Barriers ................................................. 04 Pages
Section 075419 Polyvinyl-Chloride (PVC) Roofing ........................................................................ 10 Pages
Section 076200 Sheet Metal Flashing and Trim .............................................................................. 10 Pages
Section 079200 Joint Sealants .......................................................................................................... 06 Pages
DIVISION 8 – OPENINGS
Section 081113 Hollow Metal Doors and Frames ........................................................................... 05 Pages
Section 083323 Overhead Coiling Doors ......................................................................................... 05 Pages
Section 087100 Door Hardware ....................................................................................................... 08 Pages
Section 089119 Fixed Louvers ......................................................................................................... 04 Pages
City of Wichita, Kansas
TABLE OF CONTENTS 000110 - 2
DIVISION 9 – FINISHES
Section 099124 Interior Painting ...................................................................................................... 04 Pages
Section 099600 High-Performance Coatings ................................................................................... 03 Pages
DIVISION 10 – SPECIALTIES
Section 104416 Fire Extinguishers .................................................................................................. 02 Pages
Section 107313 Metal Awnings and Canopies ................................................................................. 04 Pages
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 14 – CONVEYING EQUIPMENT
DIVISION 21 – FIRE SUPPRESSION
DIVISION 22 – PLUMBING
Section 220523 Ball Valves for Plumbing Piping ............................................................................ 03 Pages
Section 220529 Hangers and Supports for Plumbing Piping ........................................................... 07 Pages
Section 221116 Non-Potable Domestic Water Piping ..................................................................... 06 Pages
Section 221119 Non-Potable Domestic Water Piping Specialties ................................................... 02 Pages
Section 221316 Sanitary Waste and Vent Piping ............................................................................. 08 Pages
Section 221319 Sanitary Drains ....................................................................................................... 02 Pages
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
Section 230500 Common Work Results for HAVC ........................................................................ 07 Pages
Section 230529 Hangers and Supports for HVAC Equipment ........................................................ 04 Pages
Section 230553 Identification for HVAC Equipment ...................................................................... 02 Pages
Section 233300 Air Duct Accessories .............................................................................................. 05 Pages
Section 233423 HVAC Power Ventilators ....................................................................................... 04 Pages
Section 238239 Wall and Ceiling Unit Heaters ............................................................................... 02 Pages
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
Section 260519 Low-Voltage Electrical Power Conductors and Cables ......................................... Pages
Section 260523 Control-Voltage Electrical Power Cables .............................................................. Pages
Section 260526 Grounding and Bonding for Electrical Systems ..................................................... Pages
Section 260529 Hangers and Supports for Electrical Systems ........................................................ Pages
Section 260533.13 Conduits for Electrical Systems ............................................................................. Pages
City of Wichita, Kansas
TABLE OF CONTENTS 000110 - 3
Section 260533.16 Boxes and Covers for Electrical Systems ............................................................... Pages
Section 260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling ............................ Pages
Section 260553 Identification for Electrical Systems ...................................................................... Pages
Section 260573.13 Short-Circuit Studies .............................................................................................. Pages
Section 260573.19 Arc-Flash Hazard Analysis .................................................................................... Pages
Section 262213 Low-Voltage Distribution Transformers ................................................................ Pages
Section 262416 Panelboards ............................................................................................................ Pages
Section 262726 Wiring Devices ....................................................................................................... Pages
Section 262816 Enclosed Switches and Circuit Breakers ................................................................ Pages
Section 262923 Variable-Frequency Motor Controllers .................................................................. Pages
Section 263213.13 Diesel-Engine-Driven Generator Sets .................................................................... Pages
Section 263600 Transfer Switches ................................................................................................... Pages
Section 264113 Lightning Protection for Structures ........................................................................ Pages
Section 264313 Surge Protective Devices for Low-Voltage Electrical Power Circuits ................... Pages
Section 265000 Lighting .................................................................................................................. Pages
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 31 – EARTHWORK
Per City of Wichita
Section 313200 Soil Stabilization System........................................................................................ 08 Pages
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
Section 331216 Valve and Appurtenances ....................................................................................... 08 Pages
DIVISION 40 – PROCESS INTERCONNECTIONS
Section 400523 Flanged Process Piping .......................................................................................... 04 Pages
Section 400555 Supports and Anchors ............................................................................................ 07 Pages
Section 400556 Dismantling Joints .................................................................................................. 03 Pages
Section 400570 Pipe Penetration Seals ............................................................................................ 03 Pages
Section 400580 Valve Actuators ...................................................................................................... 03 Pages
Section 400585 Pressure Gauges ..................................................................................................... 03 Pages
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
Section 432131 Pressure Elements .................................................................................................. 03 Pages
City of Wichita, Kansas
TABLE OF CONTENTS 000110 - 4
APPENDICIES
APPENDIX A – BUREAU OF RECLAMATION CONTRACT ASSURANCES
APPENDIX B – GEOTECHNICAL INFORMATION
END OF DOCUMENT
City of Wichita, Kansas
CONCRETE FORMING AND ACCESSORIES 031000 - 1
SECTION 031000 - CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Form-facing material for cast-in-place concrete.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For each of the following:
1. Concealed surface form-facing material.
2. Form ties.
3. Form-release agent.
B. Sustainable Design Submittals:
C. Shop Drawings: Prepared by, and signed and sealed by, a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms.
1.4 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.
B. Minutes of preinstallation conference.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301 (ACI 301M), to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
City of Wichita, Kansas
CONCRETE FORMING AND ACCESSORIES 031000 - 2
1. Design wood panel forms in accordance with APA's "Concrete Forming Design/ Construction Guide."
2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.
2.2 FORM-FACING MATERIALS
A. As-Cast Surface Form-Facing Material:
1. Provide continuous, true, and smooth concrete surfaces.
2. Furnish in largest practicable sizes to minimize number of joints.
3. Acceptable Materials: As required to comply with Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete, and as follows:
a. Plywood, metal, or other approved panel materials.
b. Exterior-grade plywood panels, suitable for concrete forms, complying with
DOC PS 1, and as follows:
1) APA HDO (high-density overlay).
2) APA MDO (medium-density overlay); mill-release agent treated and edge sealed.
3) APA Structural 1 Plyform, B-B or better; mill oiled and edge sealed.
4) APA Plyform Class I, B-B or better; mill oiled and edge sealed.
B. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.
1. Provide lumber dressed on at least two edges and one side for tight fit.
2.3 RELATED MATERIALS
A. Reglets: Fabricate reglets of not less than 0.022-inch- (0.55-mm-) thick, galvanized-steel sheet.
Temporarily fill or cover face opening of reglet to prevent intrusion of concrete or debris.
B. Dovetail Anchor Slots: Hot-dip galvanized-steel sheet, not less than 0.034 inch (0.85 mm) thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.
C. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch (19 by 19 mm), minimum.
D. Rustication Strips: Wood, metal, PVC, or rubber strips, kerfed for ease of form removal.
E. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
2. Form release agent for form liners shall be acceptable to form liner manufacturer.
City of Wichita, Kansas
CONCRETE FORMING AND ACCESSORIES 031000 - 3
F. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish ties that, when removed, leave holes no larger than 1 inch (25 mm) in diameter in concrete surface.
PART 3 - EXECUTION
3.1 INSTALLATION OF FORMWORK
A. Comply with ACI 301 (ACI 301M).
B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 (ACI 117M) and to comply with the Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete" for as-cast finishes
C. Limit concrete surface irregularities as follows:
1. Surface Finish-2.0: ACI 117 Class B, 1/4 inch (6 mm).
D. Construct forms tight enough to prevent loss of concrete mortar.
1. Minimize joints.
2. Exposed Concrete: Symmetrically align joints in forms.
E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.
1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.
2. Install keyways, reglets, recesses, and other accessories, for easy removal.
F. Do not use rust-stained, steel, form-facing material.
G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.
1. Provide and secure units to support screed strips.
2. Use strike-off templates or compacting-type screeds.
H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.
1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.
2. Locate temporary openings in forms at inconspicuous locations.
City of Wichita, Kansas
CONCRETE FORMING AND ACCESSORIES 031000 - 4
I. Chamfer exterior corners and edges of permanently exposed concrete.
J. At construction joints, overlap forms onto previously placed concrete not less than 12 inches (305 mm).
K. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.
1. Determine sizes and locations from trades providing such items.
2. Obtain written approval of Architect prior to forming openings not indicated on
Drawings.
L. Construction and Movement Joints:
1. Construct joints true to line with faces perpendicular to surface plane of concrete.
2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.
3. Place joints perpendicular to main reinforcement.
M. Locate horizontal joints at the top of footings. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection.
1. Locate ports and openings in bottom of vertical forms, in inconspicuous location, to allow flushing water to drain.
2. Close temporary ports and openings with tight-fitting panels, flush with inside face of form, and neatly fitted, so joints will not be apparent in exposed concrete surfaces.
N. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
O. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
P. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.2 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.
City of Wichita, Kansas
CONCRETE FORMING AND ACCESSORIES 031000 - 5
3.3 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
B. Inspections:
1. Inspect formwork for shape, location, and dimensions of the concrete member being formed.
END OF SECTION 031000
City of Wichita, Kansas
CONCRETE REINFORCING 032000 - 1
SECTION 032000 - CONCRETE REINFORCING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Steel reinforcement bars.
2. Welded-wire reinforcement.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Each type of steel reinforcement.
2. Bar supports.
3. Mechanical splice couplers.
B. Shop Drawings: Comply with ACI SP-066:
1. Include placing drawings that detail fabrication, bending, and placement.
2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.
C. Construction Joint Layout: Indicate proposed construction joints required to build the structure.
1.4 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.
B. Minutes of preinstallation conference.
City of Wichita, Kansas
CONCRETE REINFORCING 032000 - 2
PART 2 - PRODUCTS
2.1 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A615/A615M, Grade 60 (Grade 420), deformed.
B. Plain-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, plain, fabricated from as-drawn steel wire into flat sheets.
2.2 REINFORCEMENT ACCESSORIES
A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.
1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with CRSI's "Manual of Standard Practice," of greater compressive strength than concrete.
B. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch (1.2908 mm) in diameter.
1. Finish: Plain.
2.3 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
PART 3 - EXECUTION
3.1 PREPARATION
A. Protection of In-Place Conditions:
1. Do not cut or puncture vapor retarder.
2. Repair damage and reseal vapor retarder before placing concrete.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
3.2 INSTALLATION OF STEEL REINFORCEMENT
A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.
B. Accurately position, support, and secure reinforcement against displacement.
City of Wichita, Kansas
CONCRETE REINFORCING 032000 - 3
1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.
2. Do not tack weld crossing reinforcing bars.
C. Preserve clearance between bars of not less than 1 inch (25 mm), not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.
D. Provide concrete coverage in accordance with ACI 318 (ACI 318M).
E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
F. Splices: Lap splices as indicated on Drawings.
1. Bars indicated to be continuous to be lapped not less than 36 bar diameters at splices, or 24 inches (610 mm), whichever is greater.
2. Stagger splices in accordance with ACI 318 (ACI 318M).
G. Install welded-wire reinforcement in longest practicable lengths.
1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard Practice."
a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed 12 inches (305 mm).
2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches (50 mm) for plain wire and 8 inches (200 mm) for deformed wire.
3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.
4. Lace overlaps with wire.
3.3 JOINTS
A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.
1. Place joints perpendicular to main reinforcement.
2. Continue reinforcement across construction joints unless otherwise indicated.
3.4 INSTALLATION TOLERANCES
A. Comply with ACI 117 (ACI 117M).
3.5 FIELD QUALITY CONTROL
A. Inspections: Steel-reinforcement placement.
END OF SECTION 032000
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 1
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1. Section 031000 "Concrete Forming and Accessories" for form-facing materials, form liners, insulating concrete forms, and waterstops.
2. Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.
3. Section 034100 “Precast structural Concrete” for precast wall panels.
4. Section 312000 "Earth Moving" for drainage fill under slabs-on-ground.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, and other pozzolans materials subject to compliance with requirements.
B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.
1.3 ACTION SUBMITTALS
A. Product Data: For each of the following.
1. Portland cement.
2. Fly ash.
3. Slag cement.
4. Aggregates.
5. Admixtures:
a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.
6. Vapor retarders.
7. Liquid floor treatments.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 2
8. Curing materials.
9. Joint fillers.
B. Design Mixtures: For each concrete mixture, include the following:
1. Mixture identification.
2. Minimum 28-day compressive strength.
3. Durability exposure class.
4. Maximum w/cm.
5. Slump limit.
6. Air content.
7. Nominal maximum aggregate size.
8. Indicate amounts of mixing water to be withheld for later addition at Project site if permitted.
9. Intended placement method.
10. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
C. Shop Drawings:
1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.
a. Location of construction joints is subject to approval of the Architect.
D. Concrete Schedule: For each location of each Class of concrete indicated in "Concrete Mixtures" Article, including the following:
1. Concrete Class designation.
2. Location within Project.
3. Exposure Class designation.
4. Formed Surface Finish designation and final finish.
5. Final finish for floors.
6. Curing process.
1.4 INFORMATIONAL SUBMITTALS
A. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Curing compounds.
4. Vapor retarders.
5. Joint-filler strips.
B. Material Test Reports: For the following, from a qualified testing agency:
1. Portland cement.
2. Fly ash.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 3
3. Slag cement.
4. Aggregates.
5. Admixtures:
C. Research Reports: For concrete admixtures in accordance with ICC's Acceptance Criteria
AC198.
D. Preconstruction Test Reports: For each mix design.
E. Field quality-control reports.
1.5 QUALITY ASSURANCE
A. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.
1. Manufacturer certified in accordance with NRMCA's "Certification of Ready Mixed Concrete Production Facilities."
1.6 PRECONSTRUCTION TESTING
A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on each concrete mixture.
1. Include the following information in each test report:
a. Admixture dosage rates.
b. Slump.
c. Air content.
d. Seven-day compressive strength.
e. 28-day compressive strength.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301 (ACI 301M).
1.8 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 (ACI 301M) and ACI 306.1.
B. Hot-Weather Placement: Comply with ACI 301 (ACI 301M) and ACI 305.1 (ACI 305.1M).
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 4
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 (ACI 301M) unless modified by requirements in the Contract Documents.
2.2 CONCRETE MATERIALS
A. Cementitious Materials:
1. Portland Cement: ASTM C150/C150M, Type I/II, gray.
2. Fly Ash: ASTM C618, Class C or F.
3. Slag Cement: ASTM C989/C989M, Grade 100 or 120.
B. Normal-Weight Aggregates: ASTM C33/C33M, Class 3S coarse aggregate or better, graded.
Provide aggregates from a single source.
1. Alkali-Silica Reaction: Comply with one of the following:
a. Expansion Result of Aggregate: Not more than 0.04 percent at one-year when tested in accordance with ASTM C1293.
b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with
ASTM C1567.
c. Alkali Content in Concrete: Not more than 4 lb./cu. yd. (2.37 kg/cu. m) for moderately reactive aggregate or 3 lb./cu. yd. (1.78 kg/cu. m) for highly reactive aggregate, when tested in accordance with ASTM C1293 and categorized in accordance with ASTM C1778, based on alkali content being calculated in accordance with ACI 301 (ACI 301M).
2. Maximum Coarse-Aggregate Size: 1 inch (25 mm) nominal.
3. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
C. Air-Entraining Admixture: ASTM C260/C260M.
D. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete.
Do not use calcium chloride or admixtures containing calcium chloride.
1. Water-Reducing Admixture: ASTM C494/C494M, Type A.
2. Retarding Admixture: ASTM C494/C494M, Type B.
3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.
4. High-Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.
5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type G.
E. Water and Water Used to Make Ice: ASTM C94/C94M, potable .
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 5
2.3 VAPOR RETARDERS
A. Sheet Vapor Retarder, Class A: ASTM E1745, Class A; not less than 10 mils (0.25 mm) thick.
Include manufacturer's recommended adhesive or pressure-sensitive tape.
2.4 CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. (305 g/sq. m) when dry.
B. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.
1. Color:
a. Ambient Temperature Below 50 deg F (10 deg C): Black.
b. Ambient Temperature between 50 deg F (10 deg C) and 85 deg F (29 deg C): Any color.
c. Ambient Temperature Above 85 deg F (29 deg C): White.
C. Curing Paper: 8-feet- (2438-mm-) wide paper, consisting of two layers of fibered kraft paper laminated with double coating of asphalt.
D. Water: Potable or complying with ASTM C1602/C1602M.
E. Clear, Waterborne, Membrane-Forming, Dissipating Curing Compound: ASTM C309, Type 1, Class B.
2.5 RELATED MATERIALS
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber.
B. Floor Slab Protective Covering: 8-feet- (2438-mm-) wide cellulose fabric.
2.6 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301 (ACI 301M).
1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1. Fly Ash or Other Pozzolans: 25 percent by mass.
2. Slag Cement: 50 percent by mass.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 6
3. Total of Fly Ash or Other Pozzolans, Slag Cement: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass.
4. Total of Fly Ash or Other Pozzolans: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass.
C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.
1. Use high-range water-reducing or plasticizing admixture in concrete, as required, for placement and workability.
2. Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
2.7 CONCRETE MIXTURES
A. Class A: Normal-weight concrete used for footings, grade beams, and tie beams.
1. Exposure Class: ACI 318 (ACI 318M) F1
2. Minimum Compressive Strength: 4000 psi (27.6 MPa) at 28 days.
3. Maximum w/cm: 0.45.
4. 8 inches (200 mm), plus or minus 1 inch (25 mm) for concrete with verified slump of 3 inches (75 mm) plus or minus 1 inch (25 mm)before adding high-range water-reducing admixture or plasticizing admixture at Project site.
5. Air Content:
a. Exposure Class F1: 4.5 percent, plus or minus 1.5 percent at point of delivery for concrete containing 1-inch (25-mm) nominal maximum aggregate size.
6. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.
B. Class B: Normal-weight concrete used for interior slabs-on-ground.
1. Exposure Class: ACI 318 (ACI 318M) F0.
2. Minimum Compressive Strength: 4000 psi (27.6 MPa) at 28 days.
3. Maximum w/cm: 0.45.
4. Minimum Cementitious Materials Content: 520 lb/cu. yd. (309 kg/cu. m).
5. Slump Limit: 8 inches (200 mm), plus or minus 1 inch (25 mm) for concrete with verified slump of 3 inches (75 mm) plus or minus 1 inch (25 mm)before adding high-range water-reducing admixture or plasticizing admixture.
6. Air Content:
a. Do not use an air-entraining admixture or allow total air content to exceed 3 percent for concrete used in trowel-finished floors.
7. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 7
2.8 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M, and furnish batch ticket information.
PART 3 - EXECUTION
3.1 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of ANSI/AISC 303.
3. Install reglets to receive waterproofing and to receive through-wall flashings at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.
3.2 INSTALLATION OF VAPOR RETARDER
A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder in accordance with ASTM E1643 and manufacturer's written instructions.
1. Install vapor retarder with longest dimension parallel with direction of concrete pour.
2. Face laps away from exposed direction of concrete pour.
3. Lap vapor retarder over footings and grade beams not less than 6 inches (150 mm), sealing vapor retarder to concrete.
4. Lap joints 6 inches (150 mm) and seal with manufacturer's recommended tape.
5. Terminate vapor retarder at the top of floor slabs, sealing entire perimeter to floor slabsand foundation walls.
6. Seal penetrations in accordance with vapor retarder manufacturer's instructions.
7. Protect vapor retarder during placement of reinforcement and concrete.
a. Repair damaged areas by patching with vapor retarder material, overlapping damages area by 6 inches (150 mm) on all sides, and sealing to vapor retarder.
3.3 JOINTS
A. Construct joints true to line, with faces perpendicular to surface plane of concrete.
B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.
1. Install so strength and appearance of concrete are not impaired, at locations indicated on Drawings or as approved by Architect.
2. Place joints perpendicular to main reinforcement.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 8
a. Continue reinforcement across construction joints unless otherwise indicated.
3. Form keyed joints as indicated. Embed keys at least 1-1/2 inches (38 mm) into concrete.
4. Locate horizontal joints at the top of footings .
C. Control Joints in Slabs-on-Ground: Form weakened-plane control joints, sectioning concrete into areas as indicated. Construct control joints for a depth equal to at least one-fourth of concrete thickness as follows:
1. Grooved Joints: Form control joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch (3.2 mm). Repeat grooving of control joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.
2. Sawed Joints: Form control joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch- (3.2-mm-) wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random cracks.
D. Isolation Joints in Slabs-on-Ground: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as foundation walls and other locations, as indicated.
1. Terminate full-width joint-filler strips not less than 1/2 inch (13 mm) or more than 1 inch (25 mm) below finished concrete surface, where joint sealants, specified in Section 079200 "Joint Sealants," are indicated.
2. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.
3.4 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.
1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.
2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.
B. Notify Architect and testing and inspection agencies 24 hours prior to commencement of concrete placement.
C. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Architect in writing, but not to exceed the amount indicated on the concrete delivery ticket.
1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.
D. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301 (ACI 301M), but not to exceed the amount indicated on the concrete delivery ticket.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 9
1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.
E. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.
1. If a section cannot be placed continuously, provide construction joints as indicated.
2. Deposit concrete to avoid segregation.
3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.
4. Consolidate placed concrete with mechanical vibrating equipment in accordance with
ACI 301 (ACI 301M).
a. Do not use vibrators to transport concrete inside forms.
b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches (150 mm) into preceding layer.
c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.
d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.
F. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.
1. Do not place concrete floors and slabs in a checkerboard sequence.
2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.
3. Maintain reinforcement in position on chairs during concrete placement.
4. Screed slab surfaces with a straightedge and strike off to correct elevations.
5. Level concrete, cut high areas, and fill low areas.
6. Slope surfaces uniformly to drains where required.
7. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.
8. Do not further disturb slab surfaces before starting finishing operations.
3.5 FINISHING FORMED SURFACES
A. As-Cast Surface Finishes:
1. ACI 301 (ACI 301M) Surface Finish SF-1.0: As-cast concrete texture imparted by form-facing material.
a. Patch voids larger than 1-1/2 inches (38 mm) wide or 1/2 inch (13 mm) deep.
b. Remove projections larger than 1 inch (25 mm).
c. Tie holes do not require patching.
d. Surface Tolerance: ACI 117 (ACI 117M) Class D.
e. Apply to concrete surfaces not exposed to public view.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 10
B. Related Unformed Surfaces:
1. At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a color and texture matching adjacent formed surfaces.
2. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.
3.6 FINISHING FLOORS AND SLABS
A. Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
B. Float Finish:
1. When bleedwater sheen has disappeared and concrete surface has stiffened sufficiently to permit operation of specific float apparatus, consolidate concrete surface with power-driven floats or by hand floating if area is small or inaccessible to power-driven floats.
2. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture and complies with ACI 117 (ACI A117M) tolerances for conventional concrete.
3. Apply float finish to surfaces to receive trowel finish.
C. Trowel Finish:
1. After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel.
2. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance.
3. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.
4. Do not add water to concrete surface.
5. Do not apply hard-troweled finish to concrete, which has a total air content greater than 3 percent.
6. Apply a trowel finish to surfaces exposed to view.
7. Finish and measure surface, so gap at any point between concrete surface and an unleveled, freestanding, 10-ft.- (3.05-m-) long straightedge resting on two high spots and placed anywhere on the surface does not exceed 1/4 inch (6 mm).
3.7 INSTALLATION OF MISCELLANEOUS CONCRETE ITEMS
A. Filling In:
1. Fill in holes and openings left in concrete structures after Work of other trades is in place unless otherwise indicated.
2. Mix, place, and cure concrete, as specified, to blend with in-place construction.
3. Provide other miscellaneous concrete filling indicated or required to complete the Work.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 11
B. Equipment Bases and Foundations:
1. Coordinate sizes and locations of concrete bases with actual equipment provided.
2. Construct concrete bases 6 inches (150 mm) high unless otherwise indicated on
Drawings, and extend base not less than 6 inches (150 mm) in each direction beyond the maximum dimensions of supported equipment unless otherwise indicated on Drawings, or unless required for seismic anchor support.
3. Minimum Compressive Strength: 4000 psi (27.6 MPa) at 28 days.
4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch (450-mm) centers around the full perimeter of concrete base.
5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete substrate.
6. Prior to pouring concrete, place and secure anchorage devices.
a. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
b. Cast anchor-bolt insert into bases.
c. Install anchor bolts to elevations required for proper attachment to supported equipment.
3.8 CONCRETE CURING
A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
1. Comply with ACI 301 (ACI 301M) and ACI 306.1 for cold weather protection during curing.
2. Comply with ACI 301 (ACI 301M) and ACI 305.1 (ACI 305.1M) for hot-weather protection during curing.
3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h (1 kg/sq. m x h), calculated in accordance with ACI 305.1, before and during finishing operations.
B. Curing Formed Surfaces: Comply with ACI 308.1 (ACI 308.1M) as follows:
1. Cure formed concrete surfaces..
2. Cure concrete containing color pigments in accordance with color pigment manufacturer's instructions.
3. If forms remain during curing period, moist cure after loosening forms.
4. If removing forms before end of curing period, continue curing for remainder of curing period, as follows:
a. Absorptive Cover: Pre-dampen absorptive material before application; apply additional water to absorptive material to maintain concrete surface continuously wet.
b. Water-Retention Sheeting Materials: Cover exposed concrete surfaces with sheeting material, taping, or lapping seams.
C. Curing Unformed Surfaces: Comply with ACI 308.1 (ACI 308.1M) as follows:
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 12
1. Begin curing immediately after finishing concrete.
2. Interior Concrete Floors:
a. Floors to Receive Floor Coverings Specified in Other Sections: Contractor has option of the following:
1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.
a) Lap edges and ends of absorptive cover not less than 12 inches (300 mm).
b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.
2) Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches (300 mm), and sealed by waterproof tape or adhesive.
a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.
b) Cure for not less than seven days.
b. Floors to Receive Curing Compound:
1) Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.
2) Recoat areas subjected to heavy rainfall within three hours after initial application.
3) Maintain continuity of coating, and repair damage during curing period.
4) Removal: After curing period has elapsed, remove curing compound without damaging concrete surfaces by method recommended by curing compound manufacturer unless manufacturer certifies curing compound does not interfere with bonding of floor covering used on Project.
3.9 TOLERANCES
A. Conform to ACI 117 (ACI 117M).
3.10 APPLICATION OF LIQUID FLOOR TREATMENTS
A. Penetrating Liquid Floor Treatment: Prepare, apply, and finish penetrating liquid floor treatment in accordance with manufacturer's written instructions.
1. Remove curing compounds, sealers, oil, dirt, laitance, and other contaminants and complete surface repairs.
2. Do not apply to concrete that is less than seven days' old.
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 13
3. Apply liquid until surface is saturated, scrubbing into surface until a gel forms; rewet;
and repeat brooming or scrubbing.
4. Rinse with water; remove excess material until surface is dry.
5. Apply a second coat in a similar manner if surface is rough or porous.
3.11 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.
B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
1. Testing agency to be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with
ASTM C31/C31M.
2. Testing agency to immediately report to Architect, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.
3. Testing agency shall report results of tests and inspections, in writing, to Owner, Architect, Contractor, and concrete manufacturer within 48 hours of inspections and tests.
a. Test reports to include reporting requirements of ASTM C31/C31M, ASTM C39/C39M, and ACI 301, including the following as applicable to each test and inspection:
1) Project name.
2) Name of testing agency.
3) Names and certification numbers of field and laboratory technicians performing inspections and testing.
4) Name of concrete manufacturer.
5) Date and time of inspection, sampling, and field testing.
6) Date and time of concrete placement.
7) Location in Work of concrete represented by samples.
8) Date and time sample was obtained.
9) Truck and batch ticket numbers.
10) Design compressive strength at 28 days.
11) Concrete mixture designation, proportions, and materials.
12) Field test results.
13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period.
14) Type of fracture and compressive break strengths at seven days and 28 days.
C. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at Project site.
D. Inspections:
City of Wichita, Kansas
CAST-IN-PLACE CONCRETE 033000 - 14
1. Headed bolts and studs.
2. Verification of use of required design mixture.
3. Concrete placement, including conveying and depositing.
4. Curing procedures and maintenance of curing temperature.
5. Verification of concrete strength before removal of shores and forms from beams and slabs.
6. Batch Plant Inspections: On a random basis, as determined by Architect.
E. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with ASTM C 172/C 172M shall be performed in accordance with the following requirements:
1. Testing Frequency: Obtain one composite sample for…