2-09. Traffic Signal Plans.pdf

PDF 178 KB Posted

Attached to
Hillside Avenue Drainage Improvements
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a technical plans document for traffic signal infrastructure associated with Middletown Township's 2026 Liquid Fuels Road Program in Pennsylvania. The document provides detailed traffic signal plans and specifications necessary for the roadway resurfacing project, which includes work on multiple township roadways funded through the Township's General Fund and the PennDOT Liquid Fuels Road Program. The traffic signal plans establish the technical requirements and design standards for traffic signal installations, modifications, or replacements that may be required as part of the comprehensive roadway resurfacing work. The project scope encompasses asphalt mill and overlay resurfacing, base repairs, leveling courses, replacement of line striping and pavement markings, and replacement of loop detectors across several roadways within the Township's municipal limits. The bid submission deadline is August 28, 2025, with three addenda having been issued prior to the solicitation closing.

The traffic signal plans document serves as a critical technical specification component of the bid package, ensuring that all bidders have access to standardized design and installation requirements for traffic signal work associated with the roadway improvements. Contractors must integrate these traffic signal specifications with all other project specifications and plans when developing their proposals and cost estimates. The project funding is derived from the Township's General Fund and the PennDOT Liquid Fuels Road Program, which typically supports local roadway maintenance and improvement initiatives. Prospective bidders must demonstrate expertise in municipal roadway resurfacing, traffic signal installation and modification, and compliance with all technical specifications outlined in the comprehensive bid documentation package.

View the file

Other files

File Type Posted
9-08. Project Plans (13 Sheets).pdf PDF
1-09. Backflow Preventor Specifications.pdf PDF
7-05. Wage Rate Determination.pdf PDF
4-01. Signed Cover Sheet.pdf PDF
3-04. Information for Bidders.pdf PDF
8-07. Technical Specifications.pdf PDF
5-06. General Conditions.pdf PDF
6-02. Notice to Bidders.pdf PDF
2-03. Proposal Section.pdf PDF
8-08. Project Plans (5 Sheets).pdf PDF
1-01. Signed Cover Sheet.pdf PDF
7-07. Technical Specifications.pdf PDF
5-05. Wage Rate Determination.pdf PDF
4-04. Information for Bidders.pdf PDF
10-10. Cobalt Ridge HOP ADA Ramp Project.pdf PDF
6-06. General Conditions.pdf PDF
9-09. Juniper Hill HOP ADA Ramp Project.pdf PDF
2-02. Notice to Bidders.pdf PDF
11-11. Temporary Easement Plan.pdf PDF
3-03. Proposal Section.pdf PDF
8-08. Project Plans (11 Sheets).pdf PDF
5-04. Information for Bidders.pdf PDF
3-01. Signed Cover Sheet.pdf PDF
1-06. General Conditions.pdf PDF
4-05. Wage Rate Determination.pdf PDF
6-03. Proposal Section.pdf PDF
9-07. Technical Specifications.pdf PDF
7-08. Project Plans (23 Sheets).pdf PDF
8-02. Notice to Bidders.pdf PDF
1-02. Notice to Bidders.pdf PDF
12-PBMTT119 - PennBid Bid Table.xlsx XLSX spreadsheet
6-05. Wage Rate Determination.pdf PDF
7-07. Technical Specifications.pdf PDF
5-01. Signed Cover Page.pdf PDF
10-PBMTT119 - 2025.08.05 - Addendum 2.pdf PDF
3-04. Information for Bidders.pdf PDF
9-PBMTT119 - 2025.07.28 - Addendum 1.pdf PDF
11-PBMTT119 - 2025.08.22 - Addendum 3.pdf PDF
2-03. Proposal Section.pdf PDF
4-06. General Conditions.pdf PDF
8-08. Project Plans (6 Sheets).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .