1-01. Signed Cover Sheet.pdf

PDF 112 KB Posted

Attached to
Hillside Avenue Drainage Improvements
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a signed cover sheet for project specifications prepared by the design professional RVE (located at 1010 Stony Hill Road, Suite 175, Yardley, PA 19067) for the 2026 ADA Curb Ramp Replacement Program in Bucks County, Pennsylvania. The local contracting unit is Middletown Township, located at 3 Municipal Way, Langhorne, PA 19047. The project specifications document outlines comprehensive ADA curb ramp replacement work along multiple township roadways, including ADA curb ramp construction with detectable warning surfaces, landscaping restorations, and permanent pavement restorations. The document was signed by Christopher J. Fazio, P.E., C.M.E., Executive Vice President, and is referenced as RVE File No. PA090665T003. According to the related contract opportunity summary, the bid submission deadline is August 28, 2025, with three addenda already issued that may contain critical updates or clarifications.

The project is funded through Community Development Block Grant (CDGB) resources, which may indicate potential preferences for local or disadvantaged business enterprises. Prospective bidders must comply with comprehensive requirements outlined in the "Information for Bidders" document, including detailed submission guidelines, wage rate determinations, and technical specifications. While a precise budget range is not specified in the provided documents, the comprehensive nature of the project involving multiple roadways and extensive curb ramp replacements indicates a substantial municipal investment. Contractors should be prepared to demonstrate robust capabilities in civil engineering, ADA-compliant infrastructure construction, and municipal project management, with particular attention to precise technical specifications and prevailing wage rate requirements.

View the file

Other files

File Type Posted
7-05. Wage Rate Determination.pdf PDF
4-01. Signed Cover Sheet.pdf PDF
3-04. Information for Bidders.pdf PDF
8-07. Technical Specifications.pdf PDF
5-06. General Conditions.pdf PDF
9-08. Project Plans (13 Sheets).pdf PDF
1-09. Backflow Preventor Specifications.pdf PDF
6-02. Notice to Bidders.pdf PDF
2-03. Proposal Section.pdf PDF
8-08. Project Plans (5 Sheets).pdf PDF
5-05. Wage Rate Determination.pdf PDF
4-04. Information for Bidders.pdf PDF
10-10. Cobalt Ridge HOP ADA Ramp Project.pdf PDF
6-06. General Conditions.pdf PDF
9-09. Juniper Hill HOP ADA Ramp Project.pdf PDF
2-02. Notice to Bidders.pdf PDF
11-11. Temporary Easement Plan.pdf PDF
7-07. Technical Specifications.pdf PDF
3-03. Proposal Section.pdf PDF
8-08. Project Plans (11 Sheets).pdf PDF
5-04. Information for Bidders.pdf PDF
3-01. Signed Cover Sheet.pdf PDF
1-06. General Conditions.pdf PDF
4-05. Wage Rate Determination.pdf PDF
6-03. Proposal Section.pdf PDF
9-07. Technical Specifications.pdf PDF
7-08. Project Plans (23 Sheets).pdf PDF
8-02. Notice to Bidders.pdf PDF
2-09. Traffic Signal Plans.pdf PDF
5-01. Signed Cover Page.pdf PDF
10-PBMTT119 - 2025.08.05 - Addendum 2.pdf PDF
3-04. Information for Bidders.pdf PDF
9-PBMTT119 - 2025.07.28 - Addendum 1.pdf PDF
1-02. Notice to Bidders.pdf PDF
12-PBMTT119 - PennBid Bid Table.xlsx XLSX spreadsheet
6-05. Wage Rate Determination.pdf PDF
7-07. Technical Specifications.pdf PDF
11-PBMTT119 - 2025.08.22 - Addendum 3.pdf PDF
2-03. Proposal Section.pdf PDF
4-06. General Conditions.pdf PDF
8-08. Project Plans (6 Sheets).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

for the

2026 ADA CURB RAMP REPLACEMENT PROGRAM

Bucks County

April 2026

Local Contracting Unit:

Middletown Township 3 Municipal Way

Langhorne, PA 19047

Design Professional:

1010 Stony Hill Road, Suite 175 Yardley, PA 19067

RVE File No. PA090665T003

Christopher J. Fazio, P.E., C.M.E., Executive Vice President Date

File details come from the government source that posted it. Updated .