18-1091_RFP_ Attch 16_Appendix 14- Table of Deliverables- ToD.pdf
PDF 145 KB Posted
- Attached to
- Demolish Space Launch Complex-2 Bldgs 1619, 1624, 1632 Federal contract opportunity
- Solicitation number
- FA461021R0008
About this file
This document outlines the requirements for a federal contract solicitation to demolish buildings at Vandenberg Space Force Base in California. The contractor will demolish Space Launch Complex-2 Buildings 1619, 1624, and 1632 and relocate electrical service for Building 1632. The solicitation is a total small business set-aside for firms with average annual revenue under $15 million. The contract will be a firm-fixed-price award made to the lowest price technically acceptable offer. Proposals are due by August 17, 2021. The pre-proposal site visit will take place on July 21 and interested parties must RSVP by July 19. Questions about the solicitation must be submitted by July 28. The contractor will be responsible for all demolition and electrical work in accordance with contract requirements, and will submit regular progress and status reports.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLC-2 Demo PWS
Appendix 14 - Page 1 of 2
XUMU181091 Demolish Space Launch Complex-2 (SLC-2), Bldgs 1619, 1624, 1632
Appendix 14 - Table of Deliverables
TABLE OF DELIVERABLES
Document Title
Copies Per
Addressee
Delivery Date C u st o m er
B a se P
O C
E le ct ro n ic
H ar d C o p y ct ro d C o ct ro d C o
Project Management Plan (PMP) 1 0 1 0 1 0 Within 14 calendar days after Award
Quality Control Plan (QCP) 0 0 1 0 1 0 At least 30 calendar days before on-site construction begins
Accident Prevention Plan (APP) 1 0 1 1 1 0 At least 30 calendar days before on-site construction begins
Demolition Plan 1 0 1 0 1 0 At least 30 calendar days before demolition begins
Kick-Off Meeting 10 calendar days after Award
Charrette The Day of or the Day After the Kick-Off
Meeting
Progress Meetings Once a week
Meeting Minutes 1 0 1 0 1 0 3 business days after each meeting
Monthly Status Report 1 0 1 0 1 0 15th of each month
Progress Schedule (AF 3064 or approved equivalent) 1 0 1 0 1 0
Baseline form shall be submitted 10 calendar days after award or at the Kick-Off Meeting, whichever is later. Updated form shall be submitted on or about the 1st of each month
Progress Report (AF 3065 or approved equivalent) 1 0 1 0 1 0
Baseline form shall be submitted 10 calendar days after award or at the Kick-Off Meeting, whichever is later. Updated form shall be submitted on or about the 1st of each month
65% Design 1 0 2 2 1 0
Within 60 calendar days after the Design
Charrette. Hard copies for all design phases shall be half size (17”x22”) (ANSI Size C)
The Government will provide review comments within 30 calendar days of 65% Design Submittal
65% Design Review Conference Within 7 calendar days of receipt of Gov.
comments on the 65% Design
100% Design, with Signed & Sealed
Drawings & Specifications 1 1 2 2 1 0
14 calendar days after receipt of Government
Review Comments from the 65% Design
SLC-2 Demo PWS
Appendix 14 - Page 2 of 2
TABLE OF DELIVERABLES
Document Title
Copies Per
Addressee
Delivery Date
C u st o m er
B a se P ct ro d C o ct ro d C o ct ro d C o
The Government will provide final comments within 14 calendar days of 100% Design Submittal
Material Approval (AF Form 3000) 1 0 1 0 1 0 At least 30 calendar days prior to requirement
Incidental Design Documents / Shop
Drawings (AF Form 3000) 1 0 1 0 1 0 At least 30 calendar days prior to requirement
Production or Delivery Problem Report 1 0 1 0 1 0 Same day as issue or occurrence
Pre-Final Inspection Report 1 0 1 0 1 0 5 calendar days before Final Inspection
Daily Logs (AF Form 1477 or approved equivalent) 1 0 1 0 1 0
Within 1 work day after each day work is performed on-site
Record Drawings 1 0 1 2 1 0 14 calendar days after Final Inspection
Interim Transfer & Acceptance of Military
Real Property (DD Form 1354) 0 0 1 1 1 0
At least 28 calendar days prior to final inspection
Final Transfer & Acceptance of Military
Real Property (DD Form 1354) 0 0 1 1 1 0 Upon acceptance of record drawings
Final Inspection Report 1 0 1 0 1 0 5 calendar days after Final Inspection
Contract Closeout Book 1 0 1 1 1 0 10 calendar days after Final Inspection