This document provides a site tour agenda and overview for a federal contract opportunity to perform power factor correction work on Block 4 of the Navajo Indian Irrigation Project in San Juan County, New Mexico. The scope of work involves providing and installing power factor correction capacitors and associated structures and equipment at pumping plants in two phases, with phase one consisting of submittals, manufacturing, and storage of materials and phase two consisting of onsite testing, installation, and commissioning during non-irrigation seasons. The solicitation number for this opportunity is 140R4021R0004. Interested offerors must adhere to safety requirements and obtain any required environmental or land access permits. Questions are due by February 4, 2021 and answers will be posted by February 11, 2021. The evaluation will be based on lowest price technically acceptable basis.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE TOUR AGENDA
POWER FACTOR CORRECTION CAPACITORS for BLOCK 4
NAVAJO INDIAN IRRIGATION PROJECT (NIIP)
SAN JUAN COUNTY, NM
10 a.m. – Thursday, January 28, 2021
1. Introduction
IMPORTANT: The following personal safety guidelines are required during the site visit:
-That social distancing is practiced.
-A face mask is required to be worn throughout the site visit.
-Bring a business card with company name, email address, phone number and point of contact name (if possible, for minimal contact consideration)
a. This job is considered heavy construction.
b. Evaluation criteria: Lowest Price Technically Acceptable. (Address all items required in Section L and Section M of the solicitation.)
c. Submittal requirements: (See Section 01 31 30, Contract Document Management System and
Section 01 33 00, Submittals)
d. All applicable Federal, State, Tribal and Local Taxes shall be paid by the contractor. In accordance with Section 7-9-3.3 of New Mexico Statutes Annotated (NMSA) 1978 and Section 402 of Navajo Nation’s Business Activity Tax Statute, it is Contractor’s responsibility to ensure that all applicable New Mexico Gross Receipts Tax and Navajo Nation Gross Receipts Tax are included in their price proposal.
e. Land/ROW Access: Limited Access, need to stay on ROW due to environmental and Tribal resources in area.
2. Construction Considerations:
The principal components of the work to be performed under these specifications will be performed in phases and will include the following:
a)
1. Phase 1 Work - The first phase shall consist of providing and receiving approval of required submittals, purchasing, manufacturing, and storing contract equipment and structures. The concrete pads and power factor corrections capacitors can be constructed but not connected until irrigation off season. Phase 1 work can be performed during the irrigation season from March to October with the permission of the Contracting Officer (CO).
2. Phase 2 Work - Phase 2 work shall consist of testing motors for existing power factor, installing and testing the equipment and structures provided in Phase 1 at the pumping plants.
Phase 2 work will be allowed during non-irrigation season months of November, December, January, and February with the permission of the CO.
b) Cleaning of construction equipment to prevent introduction of noxious weeds, and invasive plant/animal species to government-controlled land.
c) Coordination with Contracting Officer’s Representative (COR), Emma Manzanares, of allowable time for interruption of service periods (See Specification Section 01 14 30 Paragraph 1.03.B).
d) Protection of Existing Utilities (See Specification Section 01 56 15)
3. Environmental Requirements: There may be permits required e.g. Navajo Nation Lands, Permitting, SWPPP, Dewatering, 404, NOI, Nationwide 12 permit. (See Specification Sections 01 57 20 through 01 57 30).
4. Safety Requirements:
a. Reclamation Safety and Health Standards (RSHS) http://www.usbr.gov/ssle/safety/RSHS/rshs.html
5. No verbal questions will be taken. Submit questions electronically. Formal responses will be provided via an amendment and found at beta.sam.gov. Written questions should be submitted to Philoma Singer, email: psinger@usbr.gov by Thursday, February 4, 2021, 12 pm MST. Answers are expected to be posted by COB, February 11, 2021.
http://www.usbr.gov/ssle/safety/RSHS/rshs.html mailto:psinger@usbr.gov