B08_Attachment_1_140P8224R0002_Specifications_V2_0002.pdf

PDF 2 MB Posted

Attached to
Restroom Rehabilitation
Solicitation number
140P8224R0002
Issued by

About this file

This document is a set of construction specifications for the Hawai'i Volcanoes National Park Improve Comfort Stations for Visitor Use project. The project covers the refurbishment of six vault toilet comfort stations and one shelter along Chain of Craters and Hilina Pali Roads. The work includes replacing roofs, siding, doors, windows, interior finishes, and toilets to improve sanitation, comfort, and the visitor experience. The project will be constructed under a single prime contract. Key requirements include compliance with NPS regulations, resource protection measures, safety and quality control plans, and specific technical requirements for the comfort station and shelter renovations. The project is located within the Hawai'i Volcanoes National Park and must be coordinated with park operations and visitors. There are no known other contracts scheduled during the target period of performance.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAWAI’I VOLCANOES NATIONAL PARK

IMPROVE COMFORT STATIONS FOR VISITOR USE ALONG CHAIN OF

CRATERS ROAD

PMIS No. 334178

CONSTRUCTION SPECIFICATIONS

NATIONAL PARK SERVICE

PACIFIC WEST REGION

August 22nd 2023

THIS PAGE INTENTIONALLY LEFT BLANK

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS NO. OF PAGES

01 11 00 Summary of Work………………………………………………………………… 01 11 40 Work Restrictions (Resource Protection)………………………………………… 01 27 00 Definition of Contract Line Items (CLINs) 01 31 00 Project Management & Coordination Request for Information (RFI) Form……………………………………………… 01 32 16 Construction Schedule …………………………………………………………… 01 33 23 Submittal Procedures CM-16 Transmittal Form………………………………………………………… Statement & Acknowledgement (Form SF1413)………………………………… 01 35 23 Safety Requirements 01 40 00 Quality Requirements …………………………………………………………… Quality Control (QC) Daily Report Form………………………………… 01 50 00 Temporary Facilities & Controls 01 57 23 Temporary Stormwater Pollution Prevention ………………………………………..…3 01 67 00 Product Requirements ……………………………………………………………… 01 73 40 Execution 01 74 19 Construction Waste Management 01 77 00 Closeout Procedures

DIVISION 07 – THERMAL AND MOISURE PROTECTION

07 41 13.16 Corrugated Metal Roof Panels……………………………………………… 07 46 46.10 Fiber-Cement Siding…………………………………………………….…………..…… 7

DIVISION 08 – OPENINGS

08 22 20 Fiberglass Reinforced Plastic Doors and Frames……………………………………..4 08 53 00 Plastic Windows……………………………………………………………………………2 08 95 16 Louvers and Vents…………………………………………………………………………2

DIVISION 09 – FINISHES

09 92 13.00 Exterior Painting………………………………………………………………………….. 5 09 98 6 Sanitary Wall Finish……………………………………………………………………….4

DIVISION 10 – SPECAILITIES

10 28 00 Toilet, Bath and Laundry Accessories…………………………………………………..2

DIVISION 01

GENERAL REQUIREMENTS

SECTION 01 00 00 – SUMMARY OF WORK

PART 1 – GENERAL

1.1 SUMMARY

A. Section includes the following:

1. Work Covered by Contract Documents

2. Work Phases / Sequence

3. Work Under Other Contracts

4. Government-Furnished Items

5. Government-Furnished Reports

6. Conduct of Operations

7. Contractor Use of the Site

8. Public Use of the Site

9. Government Use of the Site

10. Occupancy Requirements for Buildings & Areas

11. Codes

12. Permits

13. Utility Interruptions

14. Vehicles & Equipment

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Project is located within Hawai’i Volcanoes National Parks, at four separate locations (see provided site map).

B. Project Background: This project covers the refurbishment of six vault toilet comfort stations and one shelter along Chain of Crater and Hilina Pali Roads.

This project will greatly improve the sanitation, comfort, and experience of over 1 million annual visitors by replacing deteriorated comfort stations to help extend the service life of the restrooms. It will prolong its life while reducing maintenance costs by bringing it to good condition. Renovation will improve sanitation and health conditions for visitors and increase the operational efficiency of the restrooms. These comfort stations are the only accessible restroom facilities along the 19- mile Chain of Craters Road. There are no other modern restroom facilities available to visitors or park staff. These facilities will allow visitors and park staff to dispose of waste appropriately preventing contamination to our natural and cultural resources.

C. Project Scope of Work: The Work consists of the following:

1. This project will improve 6 vault toilets and 1 shelter for visitor use along the Chain of Craters Road. Chain of Craters Road is a 19-mile road with trails and overlooks utilized by visitors daily. These comfort stations will have the roofs replaced and painted to park standards. Interior finishes such as fiberglass wall paneling, risers, vents, doors, windows, and trims will be replaced. 2 comfort stations will be resided with Hardie plank siding. The Hilina Pali Overlook shelter will have the roof replaced and painted. 4 comfort stations and 1 shelter’s exterior walls will be repainted. Work will be conducted by contract labor.

a. Chain of Craters Comfort Stations (x3)

All quantities are approximate and must verified by the contractor:

i. 450 SF of roof replacement. Roof must be #7 7/8” corrugated metal roofing (HPM) finished in forest green. All vents and openings will be adjusted and retaped and sealed.

ii. Replacement of 150 LF of roof trim. All trim must be primed and painted “CUSTOM PARK TAN”

iii. 800 SF of Hardie Board replacement, painted in Sherman-Williams “CUSTOM PARK BROWN”. Panels must match horizontal pattern of latrine number 2.

iv. Replacement of 3x doors with fiber glass doors, trim and hardware.

Hardware may be reused if it acceptable condition

v. Replacement of 3x kick proof/vandal proof vents with trim. Trim should be painted in Sherman-Williams “CUSTOM PARK TAN”

vi. Replacement of 1650 SF of interior paneling with fiberglass paneling and trim. All panels and trim must be white.

vii. Replacement of existing 3x toilets with stainless steel toilet with ABA/ADA complaint riser.

viii. Replacement of 3x 2”x6” triangle plastic windows.

ix. Replacement of overhead lighting with dark sky compliant overhead lighting, replacement in kind.

b. Mauna UIu Comfort Station

i. 150 SF of roof replacement. Roof must be #7 7/8” corrugated metal be adjusted and retaped and sealed.

ii. Replacement of 50 LF of roof trim. All trim must be primed and painted “CUSTOM PARK TAN”

iii. Replacement of 1x door with fiber glass doors, trim and hardware.

Hardware may be reused if it acceptable condition

iv. Replacement of 1x kick proof/vandal proof vent with trim. Trim should be painted in Sherman-Williams “CUSTOM PARK TAN”

v. Replacement of 550 SF of interior paneling with fiberglass paneling and trim. All panels and trim must be white.

vi. Replacement of existing 1x toilet with stainless steel toilet with ABA/ADA complaint riser.

vii. Replacement of 2”x6” triangle plastic window.

c. Kulanaokauiki Comfort Station be adjusted and retaped and sealed.

ii. Replacement of 50 LF of roof trim. All trim must be primed and painted “CUSTOM PARK TAN”

iii. Replacement of 1x door with fiber glass doors, trim and hardware.

Hardware may be reused if it acceptable condition

iv. Replacement of 1x kick proof/vandal proof vent with trim. Trim should be painted in Sherman-Williams “CUSTOM PARK TAN”

v. Replacement of 550 SF of interior paneling with fiberglass paneling and trim. All panels and trim must be white.

vi. Replacement of existing 1x toilet with stainless steel toilet with

vii. Replacement of 2”x6” triangle plastic window.

d. Hilina Pali Comfort Station be adjusted and retaped and sealed.

ii. Replacement of 50 LF of roof trim. All trim must be primed and painted “CUSTOM PARK TAN”

iii. 400 SF of Hardie Board replacement, painted in Sherman-Williams “CUSTOM PARK BROWN”. Panels must match horizontal pattern of latrine number 2 at Chain of Craters.

iv. Replacement of 1x door with fiber glass doors, trim and hardware.

Hardware may be reused if it acceptable condition

v. Replacement of 1x kick proof/vandal proof vent with trim. Trim should be primed and painted in Sherman-Williams “CUSTOM

PARK TAN”

vi. Replacement of 550 SF of interior paneling with fiberglass paneling and trim. All panels and trim must be white.

vii. Replacement of existing 1x toilet with stainless steel toilet with

viii. Replacement of 2”x6” triangle plastic window.

e. Hilina Pali Shelter

i. 600 SF of roof replacement. Roof must be #7 7/8” corrugated metal roofing (HPM) finished in forest green. All vents and openings will be adjusted and retaped and sealed.

ii. Replacement in kind of 70 LF of cedar gutter.

iii. Repainting of shelter truss and gutters, should be primed and painted in Sherman-Williams “CUSTOM PARK TAN”.

2. Project will be constructed under a single prime contract. Refer also to Section 01 27 00 – Definition of Contract Line Items.

1.3 WORK PHASES / SEQUENCE

A. Work Phases: The Work will be completed in one (1) single work phase

1. Phase 1: refurbishment of six vault toilets and one shelter.

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate with separate contractors so that all contracts may be carried out smoothly without interfering with or delaying Work under this or other contracts.

B. Other Contracts: There are currently no known contracts scheduled during the target period of performance of this contract.

1.5 GOVERNMENT-FURNISHED ITEMS

A. General: The Government may furnish items such as materials, equipment, housing, or services for use on this contract. In the event of government-furnished items:

1. The Government will arrange and pay for delivery of government-furnished items to the project site or agreed upon location based on the contractor’s approved construction schedule.

2. The Contractor is responsible for initial inspection, receiving, unloading, and hauling government-furnished items at the project site.

3. The Government will inspect delivered items for damage after delivery.

Contractor shall be present for, and assist in, the Government’s inspection.

4. The Government will arrange for replacement if government-furnished items are damaged, defective, or missing.

5. The Contractor is responsible for protecting government-furnished items from damage during storage and handling, including damage from exposure to the elements.

6. If government-furnished items are damaged as a result of the Contractor’s operations, the Contractor shall repair or replace them.

7. The Contractor shall install and otherwise incorporate government-furnished items into the Work of this contract.

B. Government-Furnished Items: None identified at the outset of the contract.

1.6 GOVERNMENT-FURNISHED REPORTS

A. General: The Government may furnish reports or other documents for informational purposes to supplement the contract documents. In cases of conflict between a report and the drawings and specifications, the drawings and specifications will govern.

B. Government-Furnished Reports: None identified at the outset of the contract.

1.7 CONDUCT OF OPERATIONS

A. Park Regulations: The Contractor shall conduct their operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service (NPS), and applicable park rules and regulations prescribed the Park Superintendent. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.

B. Work Hours: Regular work hours shall be limited to daylight hours from <7:00 a.m. to 5:00 p.m.> Monday through Friday. No work shall be performed on weekends, state, or federal holidays. Work outside regular hours requires advance approval from the Contracting Officer. Work outside regular hours will require a NPS staff presence in the event of an emergency.

C. Advertisement: No signs or advertisements shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

D. COVID-19 (Coronavirus Disease 2019): The Contractor shall comply with the latest guidance on Covid-19. The information provided below is not intended to provide a complete analysis of requirements for Contractor and is provided as a courtesy.

1. COVID-19 (Coronavirus) - www.coronavirus.gov

2. Occupational Safety & Health Administration (United States Department of

Labor).

www.osha.gov/coronavirus

1. Center for Disease Control (CDC)

a. www.cdc.gov/coronavirus/2019-ncov/index.html

b. www.cdc.gov/coronavirus/2019-ncov/community/organizations/construction-workers.html

2. Federal Emergency Management Agency (FEMA) -www.fema.gov/disasters/coronavirus

3. Department of the Interior (DOI) - Our Response to COVID-19 | U.S.

Department of the Interior (doi.gov)

4. National Park Service (NPS) - www.nps.gov/aboutus/news/public-health-update.htm

1.8 CONTRACTOR USE OF THE SITE

A. Park Entry: Vehicles associated with the contract shall be waived the entrance fee upon entering in marked company vehicles or by providing the full names, vehicle type, and the license plate numbers of employees entering in personal vehicles.

B. Site Access: The Contractor shall access the site as outlined in the drawings or attached map.

C. Project Area Limits: The Contractor will have limited use of the site for construction operations. Limit operations to the project area limits as outlined in the drawings or attached map. Do not disturb portions of the park or site beyond areas where Work is indicated.

D. Storage of Materials: Confine storage of materials to the areas as outlined in the drawings or attached map. The Contractor will be responsible for the protection and security of all materials stored inside the park. The park will attempt to provide a covered or secure area, if available.

E. Staging of Materials and Equipment: Confine staging of materials and equipment to the areas as outlined in the drawings or attached map. The Contractor will be responsible for the protection and security of all materials and equipment staged at the jobsite.

F. Stockpiling: Confine stockpiling of excavated soils to the area immediately adjacent to the trench or excavation. Confine stockpiling of excavated soils for disposal and/or import soils and aggregate to the area(s) as outlined in the drawings or attached map. Protect all surfaces from damage. Damage to surfaces shall be repaired to pre-construction conditions.

G. Construction Camp: Establishment of a construction camp within the park will not be permitted.

H. Property Damage: The Contractor is required to report missing, lost, stolen, or damaged property occurring within the park. This report must be made to a Law Enforcement Ranger or NPS Dispatch at the first available opportunity at: (808) 985-6170.

I. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings and buildings under construction or renovation. Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.

1.9 PUBLIC USE OF THE SITE

A. General: Cooperate with the staff from the NPS and the NPS partners so that the Work may be carried out smoothly without interfering with or delaying the Work under this or other contracts.

B. Park Visitation: The project site will be closed to park visitors during construction. The Contractor shall conduct their operations to minimize the inconvenience to the public. Partial and/or temporary closures in select areas may be permitted upon specific written approval by the Contracting Officer.

C. Park Events: There are no park events scheduled during the target period of performance of this contract.

1.10 GOVERNMENT USE OF THE SITE

A. General: Cooperate with the staff from the NPS and the NPS partners so that the Work may be carried out smoothly without interfering with or delaying the Work under this or other contracts.

B. Hawaiian Blessing: Prior to field construction and/or immediately following all construction activities, the NPS may conduct a Hawaiian Blessing Ceremony to consecrate the site. The need for a blessing ceremony will be made by the Park Superintendent and discussed during the pre-construction meeting. The Contractor may attend the blessing ceremony, but no compensation will be made for attendance.

1.11 OCCUPANCY REQUIREMENTS FOR BUILDINGS & AREAS

A. Government Occupancy: The Government will vacate the building(s) / area(s) under construction until the construction phase is complete and final acceptance has been issued. Cooperate with the Government during construction activities to minimize conflicts. Perform the Work so as not to interfere with the Government’s day-to-day operations. Maintain existing building ingress, egress, doorways, corridors, access walkways, access roads, and public space unless the Contractor obtains written permission from the Contracting Officer to close, partially close, or temporarily close these areas.

B. Government Occupancy of Completed Areas: The Government reserves the right to occupy portions of buildings or areas and resume operations where the

Work has been completed, provided such occupancy does not interfere with the completion of the remaining Work.

1. The Contractor shall ensure all Work is completed; all systems are operational; all testing, balancing, and inspections have been performed; and final cleaning is completed prior to the Government occupancy.

2. The Contracting Officer will prepare a Letter of Beneficial Use / Occupancy for the portion(s) of the building or areas to be re-occupied by the Government.

3. Upon Government occupancy, the Government will assume responsibility for the maintenance and custodial services for occupied portions of the building or areas.

1.12 CODES

A. General: The Contractor shall complete all work in accordance with the latest version of applicable federal, state, and local codes, standards, and regulations.

In the event of a conflict between applicable codes / standards / regulations and the contract requirements, submit a Request for Information (RFI) with code citations to the Contracting Officer for a determination.

1.13 PERMITS

A. General: The Contractor shall comply with all permit conditions, whether they are from permits furnished by the government (PART 1.13.C) or permits obtained as part of this contract (PART 1.13.D). Identify the estimated start dates and durations to obtain all permits in the construction schedule. Note: A general building permit is not required for work on NPS land; however, the Contractor must still comply with all state and local building code provisions.

B. Hot Work Permit: Hot work is defined as work activities (such as welding, cutting, blazing, and related work) that can be a source of ignition when flammable materials are present. All hot work operations shall be conducted in accordance with the procedures contained in RM-58, NPS policy on Hot Work Permits (see Appendix 35.8), and 29 CFR 1910.252(a). If the project requires any activities considered “hot work,” submit a NPS Hot Work Permit (Form HW-

1) application to the Contracting Officer at least 48 hours prior to the scheduled hot work. The NPS will then review and complete Form HW-1 and return a copy to the Contractor with the required conditions or precautions. No hot work shall occur without a completed and signed Form HW-1 and all the required precautions in place. See attached Form HW-1.

C. Government-Furnished Permits: None.

D. Required Permits: None.

1.14 UTILITY INTERUPTIONS

A. General: All Work shall be generally performed during normal business hours.

B. Existing Utilities: Notify the Contracting Officer and all applicable utility companies of the Work being performed on a utility prior to excavation or disruption. The Contractor shall be responsible for locating, and preventing damage to, known utilities. If damage occurs to a known utility, repair the utility at no additional expense to the Government. If damage occurs to an unknown utility, repair the utility and an equitable adjustment will be made in accordance with the Change clause of the contract.

C. Utility Disruptions: Do not disrupt utility service to Government or NPS partner buildings or facilities unless required under the contract documents. If utility disruptions are required:

1. Notify the Contracting Officer and all applicable utility companies not less than three (3) business days in advance of the proposed utility disruption.

2. Identify the affected services, location(s), start date, and duration of the disruption.

3. Install temporary utility services if required under the contract documents.

4. Do not proceed with utility disruptions without written permission from the

Contracting Officer’s and the local utility service provider.

1.15 VEHICLES & HEAVY EQUIPMENT

A. General: The Contractor shall comply with the following work restrictions for vehicles and heavy equipment.

B. Rules of the Road: Vehicles and heavy equipment shall comply with posted traffic regulations, including speed limits and double-yellow center lane markings.

Vehicles and heavy equipment shall take every safe opportunity to use paved pullouts to allow faster-moving traffic to pass. Failure to comply with traffic regulations will result in a citation being issued to the driver.

C. Vehicle Parking: Confine parking of Contractor vehicles to the areas as outlined in the drawings or attached map. Vehicles are not permitted to park along park roads or in overlooks / pullouts.

D. Driveways and Entrances: Keep driveways and entrances serving the premises clear and available to Government employees, vendor deliveries, and emergency vehicles at all times.

E. Vehicle Exhaust: Vehicles shall be properly maintained to ensure the exhaust produced is within legal limits. The effects of excessive vehicle exhaust may be subject to enforcement of State and Federal laws regarding emissions as well as those regarding threatened and endangered species.

F. Spills: The Contractor shall be responsible for prevention of spills and/or cleanup efforts required in accordance with 40 CFR and all applicable state environmental quality laws regarding disposal and cleanup of hazardous / industrial wastes. The Contractor must immediately notify a Law Enforcement Ranger or NPS Dispatch of any spills at: (808) 985-6170.

G. DOT Compliance: Vehicles and heavy equipment shall be compliant with all DOT requirements including but not limited to drivers with appropriate license class, possessing a medical examiner card as appropriate with license class, carrying three (3) triangles or three (3) flares, carrying a mounted fire extinguisher, and possessing a valid DOT safety sticker, as applicable.

H. Hauling & Load Restrictions: All vehicle load, weight, and size limitations, as established by State law, apply to vehicles operated on the park road (36 CFR § 4.11). No loads heavier than the current load rating for park roads and bridges will be permitted. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent.

I. Oversized Vehicles: Oversized vehicles are defined as vehicles where the width of the vehicle or load exceeds one lane (i.e., beyond the center line of the paved road). Oversized vehicles must not exceed the clearances along the park road corridor. Oversized vehicles will require an escort, and drivers must avoid driving on the shoulder of the road. Contractor shall notify the Contracting Officer of oversized vehicles, scheduled arrival dates & times at the park entrance, and the identity of who is escorting the vehicle (e.g., police, contractor, etc.). Vehicles that are oversized are requested to enter the park AFTER 2:00 p.m. and exit the park BEFORE sunset.

J. Slow Vehicles: The Contractor is to notify the Contracting Officer of slow vehicles that may cause traffic delays or extended traffic lines. Vehicles that are slow are requested to enter the park AFTER 2:00 p.m. and exit the park BEFORE sunset.

K. Tracked Equipment: Heavy equipment with rubber tires is preferred on certain surfaces in park units. Heavy equipment with metal tracks will not be allowed on paved asphalt surfaces, concrete surfaces, or ceremonial lawn areas without adequate protection to prevent permanent track marks, spalling, ruts, and other damage. The means and methods of protection (such as secured plywood or metal plates) shall also not damage the surfaces. The following exceptions may apply:

1. Tracked equipment may be allowed on paved asphalt surfaces in lieu of surface protection if the Contractor repairs or replaces the affected surfaces to pre-construction condition.

2. Tracked equipment may be allowed on older paved asphalt surfaces if the asphalt surface is scheduled for pavement preservation (by others) within 1 year of contract completion.

3. Tracked equipment will be allowed on un-paved roads if the tracked equipment stays on the road and does not create ruts, damage, or impacts the surface water flow.

4. Tracked equipment will be allowed on grass surfaces within the project area limits if the terrain is re-graded to preconstruction topography and condition prior to the pre-final inspection. Reseeding of re-graded areas with native grass shall be required.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

END OF SECTION 01 11 00

SECTION 01 11 40 – WORK RESTRICTIONS (RESOURCE PROTECTION)

A. General: The NPS is the steward of unique resources found within the national parks. The NPS is committed to protecting natural, cultural, historical, archaeological, and other resources found within the parks and the adjacent lands.

B. Section includes work restrictions for protecting resources in the national parks including, but not limited to the following:

1. Preservation of Natural Features

2. Invasive Species Prevention

3. Threatened & Endangered Species (T&E Species)

4. Archaeological Resources

5. Soundscape / Noise

6. Air Quality (Indoor & Outdoor)

PART 3 – EXECUTION

3.1 PRESERVATION OF NATURAL FEATURES

A. General: The Contractor shall comply with the following work restrictions:

1. Prevent damage to natural surroundings.

2. Provide temporary barriers to protect existing trees, tree roots, plants, grass areas and lawns that are directly impacted by construction operations.

3. Do not fasten ropes, cables, or guys to existing trees, rock outcrops, or other natural features.

4. Do not remove, injure, or destroy existing trees, tree roots, or plants without approval by the Contracting Officer or unless it’s explicitly required in the contract documents.

5. If a tree, tree branch, root, or mass of vegetation is preventing the Contractor from completing the work, notify the Contracting Officer immediately for a determination. Trees may need to be surveyed by park staff for bird nests prior to removal, and tree removal / trimming may be subject to additional restrictions if project is in Hawaiian hoary bat habitat.

6. Carefully supervise the excavation, grading, filling, equipment movement, and other construction operations near trees and tree branches to prevent damage.

3.2 INVASIVE SPECIES PREVENTION

A. General: The introduction of non-native species including invasive weeds and plants; invasive pests such coqui frogs and frog eggs, little fire ants (LFA), and insects including termites; other vertebrae species such as rats, mice, and reptiles; and diseases such as Rapid ‛Ōhi‛a Death (ROD) spread through contaminated soil can threaten the park’s rare and endangered plants and animals or can create new populations of non-native species not traditionally found in the park. Ensure all vehicles, equipment, machinery, cutting tools, base yards, staging areas, materials, material packaging, material deliveries, material storage, and personal protective equipment (PPE) are clean and free of invasive weeds and plants, invasive pests, and ROD spread through soil.

B. Vehicles, Equipment, & Machinery: In order to prevent the spread of invasive species, the Contractor shall comply with the following:

1. Vehicles, equipment, and machinery must be thoroughly pressure washed and visibly free of dirt, mud, plant debris, and invasive pests. Areas of particular concern include bumpers, grills, hood compartments, under the battery, wheel wells, undercarriage, cabs and truck beds.

2. The interior and exterior of vehicles, equipment and machinery must be free of rubbish. The interiors of vehicles and the cabs of machinery must be vacuumed clean. Floor mats must be sanitized with a solution of >70% isopropyl alcohol.

3. All vehicles, equipment, and machinery shall park on pavement and not under trees (where possible).

4. All vehicles, equipment, and machinery will be subject to inspection by NPS personnel.

5. All vehicles, equipment, and machinery that do not pass inspection will be turned away. The vehicle will not be allowed into the park for at least 48 hours.

6. All vehicles, equipment, and machinery leaving the park for any reason must be cleaned prior to re-entry into the park and will require re-inspection.

7. All vehicles, equipment, or machinery being stored at a private residence are to be kept in a pest free area, preferably in a garage, on pavement, and not under trees. Such vehicles, equipment, or machinery will be subject to additional inspection.

C. Cutting Tools: In order to prevent the spread of invasive species (most notably, the spread of Rapid ‛Ōhi‛a Death) the Contractor shall comply with the following:

1. Cutting tools including handsaws, machetes, chainsaws, and loppers must be sanitized to remove visible dirt, contaminants, and potential pathogens prior to entry into the park and when moving to a new project area. Tools must be sanitized using a solution of >70% isopropyl alcohol. One minute after sanitizing, you may apply an oil-based lubricant to chainsaw chains or other metallic parts to prevent corrosion. This applies to all cutting tools for all types of trees (including coconut trees).

2. All cutting tools will be subject to inspection by NPS personnel.

3. Cutting tools that do not pass inspection shall not be used until they pass inspection.

D. Contractor Base Yards and Staging Areas: In order to prevent the spread of invasive species, the Contractor shall comply with the following:

1. Contractor base yards and staging areas, both inside and outside the park, shall be kept clean and free of invasive pests.

2. Base yards and staging areas may be inspected by NPS personnel for invasive pests.

3. Any invasive pests found at base yards or staging areas shall be removed immediately.

E. Materials, Packaging, Deliveries, and Storage: In order to prevent the spread of invasive species, the Contractor shall comply with the following:

1. Materials, packaging, deliveries, and storage containers shall be kept clean and free of invasive pests. This includes soil, aggregate, and rock material from quarries or the source location, as well as temporary facilities and best management practice (BMP) items employed to manage surface water drainage and erosion.

2. Materials, packaging, deliveries, and storage containers will be inspected by NPS personnel for invasive pests. This includes soil, aggregate, and rock material from quarries or the source location, as well as temporary facilities and best management practice (BMP) items employed to manage surface water drainage and erosion.

3. Any item that does not pass inspection will be turned away and not allowed into the park.

4. The pest control records from quarries, source locations, or Contractor base yards may be requested.

5. Fresh crushed aggregate is preferred (if readily available) over aggregate that has been stockpiled at a quarry for a lengthy period.

F. Personal Protective Equipment (PPE): In order to prevent the spread of invasive species, the Contractor shall comply with the following:

1. Before going into the field or the jobsite, visually inspect and clean all personal protective equipment (PPE) to include boots, clothes, hard hats, harnesses, belts, and equipment for dirt, mud, seeds, plant debris, and insects. Soles of shoes must be regularly sanitized using a solution of >70% isopropyl alcohol.

G. Inspections for Invasive Species: In order to prevent the spread of invasive species within the park and adjacent lands, NPS personnel from the park may perform inspections of vehicles, equipment, machinery, cutting tools, base yards, staging areas, materials, material packaging, material deliveries, material storage, and personal protective equipment (PPE). Please permit safe unfettered access to inspection sites or items being inspected for the NPS inspectors. Inspections for invasive species may include the following:

1. NPS inspectors will perform visual inspections for signs of invasive weeds and plants; invasive pests such coqui frogs and frog eggs, little fire ants (LFA), and insects including termites; other vertebrae species such as rats, mice, and reptiles; and mud and dirt that may carry Rapid ‛Ōhi‛a Death

(ROD).

2. NPS inspectors will test vehicles, equipment, and machinery for little fire ants (LFA) by placing chopsticks baited with a dab of peanut butter for 30 minutes to 1 hour. About six (6) chopsticks (baits) will be used to test personal vehicles and trucks. Larger vehicles, equipment, and machinery may require up to 10-20 baits. Baits will be placed in the shade, inside the cab, engine compartment, and truck bed if applicable. Please note that baits are only good for detection and do not control ants. Baits will not be left in the vehicle for more than 1 hour as this may attract ants from beyond the area of concern.

3. NPS inspectors may employ the same method of testing (as outlined above in G.2) on materials, material packaging, material deliveries, and material storage to include soil, aggregate, and rock material from quarries or source locations, temporary facilities and BMP items employed to manage surface water drainage and erosion.

4. Any LFA found will be collected, bagged, and labeled for identifications by NPS inspectors (or NPS partners) and the vehicle will not be allowed to enter the park until it is cleaned, sanitized, and re-tested following a minimum 48-hour resting period.

5. Infested vehicles will be sanitized following recommendations by the Hawaii Ant Lab (http://www.littlefireants.com) or other ant control expert and in accordance with all State and Federal laws and baited with a granular or liquid insecticide bait prior to re-entry to the park. Control records will be required to confirm treatment. Treatment is the responsibility of the Contractor.

6. The park reserves the right to conduct additional test for little fire ants (LFA) at any time during the project or require deployment of preventative granular or liquid insecticide baits.

7. Note that vehicles, equipment, machinery, and cutting tools previously used on the Big Island of Hawai’i will not be approved for entry at Haleakala National Park on Maui, and vice versa (items used on Maui will not be permitted in parks on the Big Island).

H. Invasive Species Disposal / Removal Recommendations: For current disposal / removal recommendations, refer to the following website links:

1. Little Fire Ants: http://www.littlefireants.com

2. Coqui Frogs: http://www.biisc.org

3. Rapid ōhi‛a death (ROD): https://cms.ctahr.hawaii.edu/rod

4. All taxa: http://www.biisc.org

I. Inspection Scheduling / Protocol: If inspections for invasive species are required, the Contractor shall adhere to the following protocol:

1. The Contractor’s construction schedule shall identify the date of project mobilization as well as the preferred date(s) for invasive species inspections in advance of mobilization.

2. The name and contact information for the NPS primary and backup inspectors will be identified at the time of the preconstruction meeting and documented in the meeting notes.

3. Formal requests for inspections shall be made by the Contractor directly to the NPS inspector(s) via the inspector’s contact information.

4. Requests for the initial inspection(s) prior to mobilization shall be made at least three (3) days in advance of the inspection date.

5. Once the project is underway, inspections will be performed daily as needed (typically early morning) at the park’s preferred inspection site for the duration of the contract.

6. Inspection requests outside the pre-established days and times will be performed at the discretion and availability of the inspectors.

7. Inspections shall occur at the park’s preferred inspection sites identified below:

a. At Hawaii Volcanoes National Park – At the gravel pull-out area along

Highway 11 across from the Old Volcano Road or other location as determined by inspector.

b. For all other pacific island parks, inspections are not required.

8. Inspections of soil, aggregate, or rock materials may occur at the quarry or source location at the park’s discretion.

9. If a re-inspection is required, the Contractor shall clean and sanitize the item thoroughly. A re-inspection for a rejected item cannot be scheduled for at least 48 hours.

3.3 THREATENED & ENDANGERED SPECIES (T&E SPECIES)

A. General: Threatened & Endangered Plant and Animal Species are protected by

Federal law. Workers must obey all park regulations and drivers must obey all traffic laws and watch for animals on or alongside roads or within the project area. Contact NPS Dispatch at: (808) 985-6170 immediately if an animal is hit or injured or will not move off the road.

B. General Mitigations: Within the project area, the following mitigation measures are required to minimize disturbance to T&E species:

1. The project area shall be cleaned-up at the end of each work shift so that tools, materials, debris, and trash are not left out in a manner that could be a hazard to T&E species.

2. Noise and vibrations from tools and equipment shall be kept to a minimum when working in the vicinity of a listed T&E species.

3. Hazmat spill prevention protocols shall be employed when using gas-powered equipment.

4. Tarps shall be used to contain all paint chips and building debris from exterior surfaces as these can be hazards to listed T&E species.

5. Ensure no standing water on tarps or other construction surfaces in any of the parks in the Hawai‛i islands as it may be a breeding ground for mosquitoes which can carry Dengue fever, avian malaria, avian flu, and other diseases.

6. Ensure loose nails, screws, and fasteners do not fall on the ground when working on exterior surfaces as these can be a hazard to T&E species. If they do land on the ground, pick them up immediately and dispose of them properly.

C. Requirements for Specific T&E Species: The following are requirements for specific T&E species in the Hawaii national parks (delete those that are not applicable to the project).

1. Nēnē (Hawaiian goose) - Nēnē are frequently spotted along the roadside at

Hawaii Volcanoes National Park (HAVO) and Haleakala National Park (HALE) and do not readily move when approached by cars. If there is a Nēnē on the road, drivers must stop and allow the Nēnē to move away on its own.

Drivers should be aware that Nēnē may suddenly appear on the road from low brush and to be especially attentive of this on foggy and/or rainy days. In general, do not approach Nēnē and keep at least 60 feet away. Due to Nēnē breeding, construction activities may be limited at Hawaii Volcanoes National Park (HAVO) and Haleakala National Park (HALE) during the windows outlined below. Construction activities projected to occur during this window may not be permitted, or, may require additional mitigations measures. Refer also to “Working Around Endangered Birds.”

Hawaii Volcanoes National Park - Nēnē breeding: From September 1 to

May 1.

Haleakala National Park (HQ Area only) - Nēnē breeding: From October 15 to April 15.

2. ‛Ua‛u (Hawaiian petrel) – ‛Ua‛u nest along the roadside of Haleakala National

Park from mile marker 16.5 to the summit. ‛Ua‛u are active at night. ‛Ua‛u sometimes land on the road and do not move when approached by cars.

‛Ua‛u are absent from the park in December and January of each year.

Construction activities along the road, at these elevations, should be scheduled in December and January unless permission is granted by the park in consultation with the USF&WS. Also, no night work will be allowed in ‛Ua‛u habitat unless approved by the Contracting Officer. Refer also to “Working Around Endangered Birds.”

3. ‘Ōpe‛ape‛a (Hawaiian hoary bat) – The Hawaiian hoary bat is an endangered subspecies of the hoary bat family that is endemic to the Hawaiian Islands.

Bat birthing and pupping season typically occurs in trees or vegetation greater than 15 feet high from June 1 until September 15. Trees less than 15 feet high can be cut year-round (unless trees are near caves where bats may also nest). Cutting of trees and vegetation greater than 15 feet high is limited to the period of September 15 to June 1 to avoid affecting hoary bat pups. No tree or branch shall be cut without approval by the Contracting Officer or unless it’s explicitly required in the contract documents. If a hoary bat is discovered in the project area, contact NPS Dispatch at: (808) 985-6170.

4. Other T&E Plants & Forest Birds – Prior to construction start, the park may survey the project area for threatened and endangered plants & forest birds (and their nests) and flag a buffer zone for protection. Avoid flagged nest areas during construction activities.

D. Requirements for Other Species of Concern: The following are requirements for other species of concern in the Hawaii national parks (delete if not applicable to the project).

1. ‛Ōhi‛a Trees - Avoid wounding ‘ōhi‘a trees and roots with mowers, chainsaws, weed eaters, and other tools. Cut only a minimum amount of trees and branches as approved by the Contracting Officer and avoid making jagged cuts or stripping bark. Treat the cut, standing sections of ‘ōhi‘a with a wound sealant such as Spectracide Pruning Seal. Wound sealants other than Spectracide Pruning Seal will require review and approval by the Contracting Officer prior to use. ‘Ōhi‘a firewood, ‘ōhi‘a logs, ‘ōhi‘a parts, and ANY other cut vegetation, organic matter, or green waste that is not part of the project scope may not be brought into the park. All non-‘ōhi‘a firewood and logs imported into the park must be sourced from a park approved site free of invasive weeds and plants, invasive pests, and ROD.

3.4 ARCHAEOLOGICAL RESOURCES

A. General: Archaeological resources are physical evidence of past human activity, including evidence of the effects of that activity on the environment.

Archaeological resources are found above and below ground and underwater.

Known archeological resources will be marked and flagged by the park. Do not disrupt known archaeological resources or flagged areas during construction activities. If necessary, the Contractor will erect temporary barriers around the archaeological resource to ensure avoidance. The Contractor does not need to provide an Archaeological Monitor; however, the Contractor, or Contractor’s designee, will observe all ground-disturbing activities during earthwork and other construction operations. If the Contractor discovers archaeological resources, the Contractor shall stop work, notify the Contracting Officer immediately, and relocate to a non-sensitive area. The park may have an Archaeological Monitor present at the jobsite who is authorized to stop work upon discovery of archaeological resources. Archaeological resources typically found in the park or at the project site will be discussed at the preconstruction meeting.

3.5 SOUNDSCAPE / NOISE

A. General: The Contractor shall minimize noise levels at the project site to protect the soundscape of the park and minimize noise to staff, visitors, neighbors, and habitat. Perform operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week or as directed by the Contracting Officer.

Repetitive and/or intermittent, high-level noise is permitted only during daytime hours. If the Contractor exceeds the thresholds below, the Contractor may be required to stop work, temporarily relocate to a non-sensitive area, or adjust the construction means and methods at no additional expense to the Government.

1. Maximum permissible construction equipment noise at 50 feet:

EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Front Loaders 75 Concrete Mixers 75 Backhoes 75 Concrete Pumps 75 Dozers 75 Cranes 75 Tractors 75 Derricks Impact 75 Scrapers 80 Pile Drivers 95 Graders 75 Jack Hammers 75 Trucks 75 Rock Drills 80 Pavers, Stationary 80 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75 Compressors 75

2. Do not exceed the following dB(A) limitations at 50 feet:

TIME DURATION OF IMPACT NOISE dB(A) More than 12 minutes in any hour 70 More than 3 minutes in any hour 80

3.6 AIR QUALITY (INDOOR & OUTDOOR)

A. General: The Contractor shall minimize the negative impacts to indoor and outdoor air quality as a result of their operations. This may include:

1. Control of emissions from vehicles or heavy equipment.

2. Control of fumes, vapors, or gases from products or packaging.

3. Control of particulates and dust from indoor operations such as cutting and sanding.

4. Control of particulates and dust from outdoor operations.

5. Control of moisture during operations that may lead to damage, fumes, or mold.

B. Mitigations: The Contractor shall mitigate for negative impacts to indoor and outdoor air quality as a result of their operations. This may include:

1. Ensure vehicles and heavy equipment do not idle when not in use.

2. Ensure proper ventilation and air movement of indoor spaces.

3. Install temporary mechanical ventilation where appropriate.

4. Ensure tools are equipped with the proper guards or particulate catchment devices.

5. Ensure particulates and debris are collected and disposed of on a regular basis.

6. Consider water trucks or temporary irrigation devises for dust control on unpaved surfaces.

7. Ensure products are properly dried or cured prior to advancing the work.

8. Ensure materials are stored in a dry location.

9. Ensure wet / damp materials are not installed or covered.

END OF SECTION 01 11 40

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS (CLIN)

A. This section explains, in general, what is and is not included in a contract line item and defines where one item ends and another begins.

B. If no contract line item exists for a portion of work, include costs in a related item.

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item (CLIN) 00010

1. This item consists of refurbishment of 3 vault toilets (see map “Chain of

Crater Toilets”)

2. Payment will be made at the contract lump sum price.

B. Contract Line Item (CLIN) 00020

1. This item consists of refurbishment of 1 vault toilet (see map “Mauna Ulu

Vault Toilet”)

C. Contract Line Item (CLIN) 00030

1. This item consists of refurbishment of 1 vault toilet (see map “Kulanaokauiki

Campground”)

D. Contract Line Item (CLIN) 00040

1. This item consists of refurbishment of 1 vault toilet and 1 shelter (see map

“Hilina Pali Shelter and Toilet”)

END OF SECTION 01 27 00

SECTION 01 31 00 – PROJECT MANAGEMENT & COORDINATION

C. This section includes administrative provisions for coordinating construction operations on the Project including, but not limited to, the following:

1. Construction Coordination

2. Requests for Information (RFI)

3. Project Meetings

1.2 CONSTRUCTION COORDINATION

A. Contractor Coordination: Coordinate construction operations included in different drawing sheets and/or specification sections to ensure efficient and orderly installation of each part of the Work.

1. Schedule construction operations in the sequence required to obtain the best results where installation of one part of the Work depends on installation of other components.

2. Coordinate installation of different components with other Contractors to ensure maximum access for required maintenance, service, and repair.

3. Plan and coordinate construction operations to incorporate applicable permit requirements.

B. Administrative Procedures: Coordinate scheduling of administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of the Work.

1.3 REQUEST FOR INFORMATION (RFI)

A. General: Upon discovery of the need for additional information or an interpretation of the contract documents, the Contractor shall prepare and submit an RFI. The Contracting Officer will only respond to RFIs submitted by the prime Contractor. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. RFI Form: Include a detailed, legible description of the subject or item needing more information or interpretation on the NPS RFI Form with the information below. Submit the RFI form in MS Word format to allow the NPS to provide a response.

1. RFI number, numbered sequentially.

2. Date of RFI.

3. RFI subject.

4. Specification Section, section title, and related paragraphs, if applicable.

5. Drawing number and detail references, if applicable.

6. Description of the issue or question.

7. Photographs or sketches, if applicable.

8. Contractor's suggested resolution. State whether the suggested resolution results in “no additional time / cost” to the contract or if it will result in “additional time / cost.” Do not provide a detailed price proposal unless requested to do so by a Contracting Officer.

C. RFI Response: The Contracting Officer, or authorized representative, will review each RFI, determine the action required, and respond accordingly.

1.4 PROJECT MEETINGS

A. Preconstruction Meeting: Before the start of construction, the Contracting Officer will arrange for a preconstruction meeting (typically by MS Teams or teleconference). A meeting agenda will forwarded to the group prior to the meeting. During the meeting, the agenda will be updated by the Contracting Officer or designee and distributed to the group as the meeting minutes.

B. Progress Meetings: The NPS may schedule periodic meetings to discuss the progress of the Work with the Contractor, subcontractor(s), and key NPS staff.

The need for and frequency of these meetings with be discussed at the preconstruction meeting. Progress meetings are typically held once per week via teleconference and last no more than 30 minutes. These weekly meetings are mainly to discuss progress for team situational awareness. Meeting minutes are not required.

END OF SECTION 01 31 00

Project:

Contract No.:

Date:

To:

cc:

From:

Subject:

Please provide the following information or clarification:

Response required by ___\____\____

Date:

To:

From:

Subject:

REQUEST FOR INFORMATION # X

SECTION 01 32 16 – CONSTRUCTION SCHEDULE

A. This section consists of Construction Schedule requirements including:

1. Schedule of Values

2. Construction Baseline Schedule

3. Construction Schedule Updates

4. Look-Ahead Schedule

B. Purpose: The construction schedule ensures adequate planning, coordination, scheduling, and reporting during execution of the Work by the Contractor.