Section D: Performance Work Statement

01 December 2022

Revised: 26 January 2023 (yellow highlights)

D.1 BACKGROUND

National Park Service (NPS) National Mall and Memorial Parks (NAMA) Dwight D. Eisenhower Memorial (DDEM), located at the base of Capitol Hill at 540 Independence Avenue SW. The four-acre urban park features a variety of pieces that symbolize Eisenhower’s inspirational feats during his time as the supreme commander of the Allied Expeditionary Force in Europe during World War II and as the 34th U.S. president. The newly constructed Memorial was commissioned September 17, 2020.

D.2 PURPOSE

The Dwight D. Eisenhower Memorial is a unique structure serving as a work of art, a memorial of significant emotional power, and a functioning park with landscaping and sculptures. Each of these aspects presents major challenges to the performance of this contract. In combination, they require considerable orchestration of contractor resources coupled with a deep sensitivity to the significance of the memorial and the concerns of the general public.

The contractor shall provide all labor, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, management, and non- personal services necessary to perform operations and maintenance, preventative maintenance, service calls, and repairs (minor and major) for all equipment, systems, facilities, and grounds designated to the Dwight D. Eisenhower Memorial as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The contractor shall perform all work to the standards in this PWS.

D.3 SCOPE

This is a Single-Award Indefinite Delivery/Indefinite Quantity (ID/IQ) contract that encompasses all activities associated with the operations, maintenance, and repairs of the Dwight D. Eisenhower Memorial. Attachment 2 provides a list of the Dwight D. Eisenhower Memorial equipment and systems to be maintained under this contract.

The inventory is illustrative of the types of equipment and systems to be maintained under this contract. During the life of the contract, individual pieces of equipment or complete systems may be replaced. The Contractor is responsible for maintenance of replacement equipment and systems. As a work of art, the maintenance and repair requirements demand special care because of the construction materials, e.g., Spanish Lime Rock, stainless steel, bronze sculptures, etc. The most visible memorial systems, and consequently those requiring the most intensive management, are sculptures, masonry, and lighting system. The nature of the required services is within the abilities of typical maintenance and repair journeymen electricians, plumbers, and other mechanical tradesmen. Illumination is a key architectural aspect of the memorial and, as such, requires constant surveillance to assure all lighting fixtures are functioning properly. All system disruptions and visual blemishes must be addressed in a timely manner to preserve the overall “Exceptional Appearance” of the memorial as envisioned by its designers and expected by the NPS and the public. In addition, an underground Equipment Control Center (ECC) contains circulation pumps, sump pumps, electrical distribution systems, air-conditioning units, water heaters, water treatment system, control systems and a large water cistern. Maintaining these systems requires a preventive maintenance program, a predictive maintenance program and repair capabilities.

The nature of the work required to maintain memorial cleanliness and orderliness are well within the abilities of the typical laborer. Principle duties are keeping the park free of litter, raking the mulched areas to ensure smoothness and desired thickness, removal of trash and debris, polishing metal surfaces, cleaning stone faces, cleaning pavers.

Maintaining an “Exceptional Appearance” condition of the memorial presents the most immediate and continuous contractor objective. The conduct of the contracted workforce must be ever mindful of the significance of the memorial and the sensitivity of visitors and the public while performing the duties within this scope.

D.3.1 GENERAL INFORMATION

1. Quality Control:

A. The contractor shall develop and maintain an effective quality control program to ensure services performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is how the contractor assures themselves that their work complies with the requirement of the contract.

B. Within thirty (30) calendar days of contract award, the Contractor shall develop and maintain a QC plan to actively identify and correct performance failures for all work performed under this contract.

i. The QC plan must identify resources and include procedures to maximize quality and ensure completion of each task during the established period of performance.

ii. The Contractor’s organizational structure for its QC process shall establish a plan that minimizes potential conflicts of interest between the offeror’s personnel (or subcontractors) that performs the PM work and the personnel that will inspect the PM work.

iii. The contractor shall submit a comprehensive written QC plan to the CO and COR within five (5) working days when changes are made thereafter.

iv. After acceptance of the QC plan the contractor shall receive the Contracting acceptance in writing of any proposed change to his QC system.

2. Quality Assurance:

A. The Government shall evaluate the contractor’s performance under this contract in accordance with the

Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

3. Standard Hours of Operation:

A. The contractor is responsible for ensuring the site meets the exceptional appearance standards between the hours of 7:00am-10:00pm, Eastern Standard Time (EST) 364- days per year (includes all holidays and weekends except Christmas Day).

B. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

C. The Contractor shall minimize activities during this period that would unnecessarily detract from visitor access and disrupt the solemnity of the memorial site. As a memorial, the site must be kept in an “Exceptional Appearance” condition during Standard Hours of Operation. The same conditions shall be met for special events regardless of the time.

D. Exceptional Appearance. The contractor will maintain a performance standard that reflects an appreciation of the visual and performance expectations of memorial visitors. While not requiring perfection, the effort to produce this end result is characterized by an on-going activity to remove imperfections visually obvious to the casual observer that would be negatively viewed as a sign of lack of care or disrespect and surpassing what is common, unusual, or average. Efforts to produce this “exceptional appearance” condition should be especially evident during Standard Hours of Operation.

4. Non-Standard Hours of Operation:

A. The Contractor may be required to perform during non-standard operating hours. Nonstandard operating hours are defined as the period from (8:00pm-8:00am) (10:00 pm-7:00 am) Eastern Standard Time,7 days a week, 364 days a year, including holidays and weekends except Christmas Day.

5. Recognized Federal Holidays and Other Government Directed Closings:

A. The contractor is required to maintain the site during recognized Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The NPS only has a minimal maintenance and park ranger staff during federal holidays. The COR for this contract is not part of the minimal staff and observes all recognized federal holidays and government directed facility closings. If the contractor cannot perform onsite due to a government directed closing, the COR shall notify contractor as soon as the COR is notified of such occurrence. If a closing is anticipated to be long term a stop work order may be issued. The following is a list of current recognized Federal Holidays:

i. New Year’s Day

ii. Martin Luther King Jr.’s Birthday

iii. President’s Day

iv. Memorial Day

v. Juneteenth

vi. Independence Day

vii. Labor Day

viii. Columbus Day

ix. Veteran’s Day

x. Thanksgiving Day

xi. Christmas Day

6. Physical Security:

A. The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured. All access points to below grade space shall be secured/locked at all times. If points of access can’t be secured with a lock due to work being performed, personnel shall be in place at access point to prevent any unauthorized access.

7. Key Control:

A. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the

Contractor by the Government are not lost or misplaced and not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

B. In the event keys are lost or duplicated, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due to the Contractor

C. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees, subcontracted employees, or personnel authorized entrance by the Contracting Officer or Contracting Officers Representative.

8. Periodic Meetings:

A. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation. The Contracting Officer (CO), Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the CO will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

D.3.2 GENERAL MAINTENANCE REQUIREMENTS

1. The contractor shall be responsible for establishing and executing an effective system for accomplishing scheduled preventative maintenance and unscheduled maintenance and repairs.

A. The contractor shall submit within 30 calendar days:

i. Proposed preventative maintenance schedule in a 12-month calendar style format listing what items will be attended to each month.

ii. Proposed maintenance requirements to be performed on the equipment to the COR/POC for approval thirty (30) calendar days after contract award.

2. Preventative Maintenance:

A. Shall be scheduled in accordance with the manufacturer’s recommendations or the best practices of the industry (ASME).

B. Equipment listed in the inventory shall be maintained according to the manufacturer’s recommended preventative maintenance (O&M Manuals), best practices of the industry, and in Attachment 2 – Equipment, Systems, and Maintenance Items.

C. All preventative maintenance scheduled for each month must be completed during that month. The contractor must submit in writing a request for deviation from the approved schedule with appropriate justification to the COR for approval. If a request is denied, no deviation will be accepted.

D. All preventative maintenance accomplished by the contractor during the month shall be included with dates when work was completed and submitted with the monthly report.

E. For any major preventative maintenance work that requires the opening, dismantling, or shut down of part or the whole system that is necessary to perform any work. Examples of equipment may include, but is not limited to generators, pumps, refrigeration units, condensers, evaporators, electrical switchgear, and such equipment as determined critical by the COR/POC.

i. The COR/POC must be notified in writing at least twenty-four (24) hours in advance of when scheduled work is to be performed.

ii. The notification must include the length of time for the proposed shut down.

iii. Repairs that may cause tenant disruption due to the nature of the repair shall be performed outside of official facility occupancy hours as needed.

iv. If they are delays that require an extended time beyond what was proposed in the written notification, the contractor must inform the COR/POC in writing of the continued delays with an estimated time frame for everything being back online as soon as it is known.

The COR shall immediately be notified of all damaged facility system(s), Government property, disrupted Government operations, and any personal injury.

D.3.3 MAINTENANCE REPORTING REQUIREMENTS

1. The contractor shall provide the monthly maintenance and other reports, as listed in the table below, to the

COR. All the report formats will be worked out between COR and the Contractor upon award.

2. Reports shall contain a detailed description of work performed and an analysis of the system work was performed on for each task.

3. Reports shall have the technician and company name, with contact info, of who performed the work and who inspected and approved of work when complete.

Requirement Due

Weekly Lighting Report Monday of every Week

Monthly Preventative Maintenance schedule dates (scheduled, completed & back log)

5 working days after the end of each month

Repair History Report 5 working days after the end of each month

Service Call Log 5 working days after the end of each month

Planned System Outages As required

Plumbing Systems Report 5 days after completion of work

Irrigation Maintenance Report 5 days after completion of work

Annual Bronze Sculpture Conditions Assessment Report

5 days after completion of work

Conservation Treatment Report 5 days after completion of work

Masonry Cleaning Daily Log 5 working days after the end of each month

Underdrainage and Drainage Structure Maintenance

5 days after completion of work

D.3.4 ADDITIONAL APPLICABLE PERFORMANCE REQUIREMENTS

1. Perform all work in an efficient, safe, and timely manner.

2. All work, the storage of materials and equipment, parking of vehicle, and all other operations in connection with this contract shall be confined to the specified hours and work areas designated and approved in writing by the COR.

3. Parking pass for up to 3 vehicles will be issued for parking on Jefferson Drive between 3rd and 7th street adjacent to the Mall.

4. ATV and Golf Cart sized vehicles are permitted on site for normal operations. For major repairs where larger vehicles are required, discussion with the COR is required.

5. Once repair work has begun on any give repair the Contractor’s mechanic shall not leave the site to respond to other customers’ service requirements at other locations.

6. Without expense to the Government, be responsible for obtaining any necessary licenses and permits, and comply with any applicable Federal, State, and municipal laws, codes, and regulations.

7. Be responsible for repair and/or replacement of any portion of building structures, or landscape features, damaged by the contractor’s activity. All the identified areas that are found to be damaged shall be restored, repaired, or replaced by the contractor at no expense to the Government.

D.3.5 SPECIFIC SYSTEM REQUIREMENTS

1. Plumbing Systems

A. Refer to Attachment 2 – Maintenance Schedule.

B. System testing (i.e. backflow preventer) shall be verified in accordance with all Federal, State and Local plumbing code requirements.

A. Backflows will be tested annually, and test results reported to DC Water backflow prevention system.

Copies of tests to be provided to COR upon completion.

C. The Contractor shall remove any debris from floor drains, storm drains interior and exterior ensuring they remain free flowing.

D. The contractor shall ensure all toilets, urinals and sinks are clog free. Contractors has 24 hours to address any backups upon notification.

E. The contractor shall ensure all faucets and flush valves and plumbing fixtures are operational, upon finding or notification of nonoperational fixture contractor has 24 hours to address.

F. Contractor is not responsible for custodial duties for the restrooms.

G. Contractor is responsible for spring start up, winterization of outside drinking water fountain. Ensure fountain is cleaned daily.

H. Contractor is responsible to replace filter on the breakroom water cooler yearly, NPS will provide filters.

2. Mechanical Systems

A. Refer to Attachment 2 – Maintenance Schedule.

B. The Contractor shall be responsible for the proper preventative maintenance of HVAC equipment in a fashion that is in keeping with industry standards and manufacturer’s specifications and the Operations and Maintenance Manuals.

C. Preventive maintenance on either heating or cooling equipment shall be accomplished prior to the season in which the equipment is needed.

D. The Contractor shall perform testing of fire dampers per NFPA 80, Chapter 19.

3. Electrical Systems

A. Refer to Attachment 2 – Maintenance Schedule.

B. Daily light check.

C. The Contractor shall conduct quarterly inspections confirming the programming cycles are maintained on the lighting system.

D. Contractor is responsible for scheduling and programming Special Event lighting needs with Lutron Electronics 1-844-588-7661, support@lutron.com.

E. Contractors responsible for replacing all burned out bulbs and ensuring all lights are functional. Inform COR of bulb types needed, NPS will provide bulbs.

F. Contractor responsible for replacing /repairing nonfunctioning light components to include ballast, drivers, fixtures etc. This will be done through repair task orders, contractor required to provide quote.

G. Contractor is responsible for cleaning out light troughs to ensure adequate drainage. Contractor will need to inspect troughs on a weekly basis and remove grates and clean as needed.

H. All electrical work to include troubleshooting, repairing, inspection and all testing will be verified by a licensed electrician in accordance with applicable National Electric Code requirements.

I. The Contractor shall notify the COR of any required equipment shutdown and schedule appropriate time to complete maintenance or repair work to equipment and to limit downtime.

J. The Contractor shall maintain the required working clearances surrounding electrical equipment and keep electrical room clean from dirt, debris, storage, and other hazardous items.

K. The Contractor shall inspect pole-mounted and planter bed GFCI receptacles for proper wiring connections and safe condition of weatherproof covers.

L. The Contractor is responsible for operation and maintenance of the sidewalk heating system. Start up 1 December and shut down 1 April. Contractor performs routine maintenance and inspections to ensure proper operation of the system. The system is a 480 Volt sidewalk heating system with 3 control panels/zones.

Nvent Raychem

S,O, NO:887374

DWG. NO:887374-2-01 THRU 04

Model NO: SMPG3-480-3-5/3P(40A)-1/3P(20A).1/2P(20A)-1-275-250

4. Non-Potable Water Supply Systems

A. Refer to Attachment 2

B. All three pumping systems are manufactured by Watts Water Technologies Inc. This includes the following: Irrigation, Flushing, and Filtration.

C. The irrigation supply system is a vertical multistage two-pump style using a control panel capable of Variable Frequency Drive (VFD), Programable Logic Control (PLC) and a Human-Machine Interface (HMI). The pumping system and the connected inground irrigation rotors, spray heads and drip emitters are controlled by a Programable and Intuitive Calsense 3000. Additionally, the system uses filtration and UV Disinfection to clean the water to allowable use levels. This system normally operates at 24 GPM at

115 PSI.

D. The flushing supply system is a two-pump using a control panel capable of Variable Frequency Drive (VFD), Programable Logic Control (PLC) and a Human-Machine Interface (HMI). Additionally, the system uses filtration, chlorine, colorant and UV Disinfection to clean the water to allowable use levels.

This system normally operates at 73 GPM at 65 PSI.

1. Chemicals for flushing system are blue food dye and chlorine

E. Using cistern supplied rainwater and backup/bypass city water supply, a filtration supply system supplies both the irrigation and flushing system needed water that is held in a day tank. The filtration system uses a submersible transfer pump located in cistern tank that is then processed through a Differential Controlled Self-Cleaning Strainer as well as a Bag Filtration System to clean non-potable water to acceptable use levels. This system uses a control panel capable of Variable Frequency Drive (VFD), Programable Logic Control (PLC) and a Human-Machine Interface (HMI).

5. Building/Systems A. Roofing/Gutter systems: Clean and inspect roof/system flashing, check roof penetrations such as vents, etc., for proper sealing 2 times per year October and April. Inspect roof for debris, ponding water, cracks, split seams, buckling, loose parts, rust, and staining. Report any issues or potential issues to COR.

B. Clean the Roof of any Debris such as fallen branches, leaves, and trash. Check Roof for any Ponding water or evidence water has been standing for lengthy periods such as color changes on the Roof surface. Clean and Inspect all Roof Drains for proper draining. Inspect entire Roof Surface, checking for any signs of cracks, tears, or other damage to the roofing system. Inspect around areas where items penetrate the roof surface such as Roof Vents, checking for proper sealing. Inspect termination areas at Parapet Walls, checking for signs of failure or cracking. Ensure all termination points are properly sealed. Inspect the Roof Edge for any damage or loose parts. Ensure all Edge materials are properly secured, terminated, and sealed.

Inspect all Flashing such as, but not limited to, around Vent Stacks, walls, curbs, and transition points.

Ensure all Flashing shows no signs of separation, such as cracks or crevices.

C. Clean and inspect gutters and downspouts 7 times per year, 3 times in the fall, 2 times in the spring, once in the winter and summer. Remove all debris from Gutters. If Gutters have protective screens, ensure screens are free of all debris such as leaves, and pollen build up. Check all Downspouts ensuring they are free of any debris and are free flowing. Check Downspout terminations at ground level. Ensure Downspouts are free from damage or blockage that would prevent free flow of water

D. Clean and inspect windows quarterly. Check windows for cracks or other damage. Check window seals to ensure proper sealing. Replace window seals and caulking as needed to prevent water intrusion. Check frames around windows for leaks and proper caulking replace caulking as needed.

E. Clean and inspect all doors, door frames and associated hardware quarterly. Clean more often if needed.

Check doors for proper operation, ensuring doors are properly aligned with proper clearances between the door and frame. Check thresholds to ensure they are tightly fixed in place with no loose or missing screws.

Check door hardware such as hinges, push and pull plates, and Kick plates for loose or missing screws.

Check Pull Handles to ensure they are not loose. Check door closers for loose screws, paying close attention to the closer arm. Check door closers for proper closing speed and force, ensuring door latches properly. Check for proper operation of door locks and Panic Bars. Check Automatic Door Push Plates, Sensors, and Door Operators for proper function. Check weather strips and replace as needed.

F. Adjust doors and hardware for proper operations as needed. Ensure doors and hardware function properly.

G. Fire alarm / Fire Suppression System

i. Inspect and test Fire Alarm Systems and Fire Suppression Systems annually. Inspection, testing, and maintenance (ITM) of Fire Protection Systems and devices shall be performed by qualified personnel who meet a minimum of National Institute for Certification and Engineering Technologies (NICET) ll certification for the type of system being worked on.

H. Security System

i. Ensure cameras are free and clear of insects and debris and are undamaged with monthly checks.

ii. Test batteries on security system once a year, ensure results are in regular reports.

a. Change batteries as needed.

iii. Report any issues noticed with security system to COR upon findings.

I. Inspect Elevator/Lift

i. Clean Elevator/Lift cab. Ensure floor is clean and cab is wiped down as needed. Keep door tracks clean, removing any dirt, sand, or other debris as needed. Elevator/Lift will be examined monthly for any needed lubrication or adjustments. Elevator/Lift will be inspected, tested, and certified annually.

Certificate of Inspection shall be posted.

J. Internal Housekeeping

i. Clean floors and stairwells. Ensure closets and storage areas are kept clean. Check weekly for evidence of insect or other pest infestation. Report findings to COR.

ii. The contractor is not responsible for custodial services in the bookstore and restrooms.

K. Building Structure

i. Inspect Interior and Exterior structure for issues or damage and report findings to COR. Examine floors, ceilings, and walls for evidence of deterioration. Check for evidence of leaks, especially from the ceiling and in the basement. Power wash exterior structure one (1) time per year. Spot clean building as needed throughout the year. Refer to masonry cleaning specification, section D.3.11 of PWS, to perform cleaning.

6 Underdrainage and Drainage Structure Maintenance

A. The Contractor at the commencement of management should check that all underdrainage is performing satisfactorily and is clear of debris.

B. The Contractor shall perform the following tasks related to the drainage system.

a. Daily inspection/cleaning of drain grates ensuring they remain free of debris.

b. Flush out drainage boxes and clean-outs on site one (1) time a year, in the fall after all the leaves have dropped.

c. Jet all drainage lines once during this contract to be scheduled with COR.

7 SERVICE CALLS/RESPONSE

1. The Contractor must have the capability to receive, respond to and record requests for services and respond within 1 hour during normal working hours, and by the start of the next workday for after hour requests.

2. A “Service Call” is a report of a system malfunction made by customer complaints, COR’s request or contract personnel and the Contractor’s subsequent response to, and correction of, the problem.

3. There are two categories of service calls.

A. Non-Emergency Service Calls – may include any unscheduled work that requires the replacement and/or repair of something, that is required and may prevent further damage to Government property or equipment but is not considered a life or safety issue.

B. Emergency Service Calls – Include all unscheduled calls, where the repair and/or replacement of property or equipment is critical to the Governments needs and will prevent further immediate damage to existing systems and property, is required to prevent a piece of equipment or system component from breakdown/failure, and/or is consider a life and safety issue.

4. All service calls must return system or property to new and/or operational service, which may include the repair and/or replacement of parts or incidentals.

5. All service call work must include all applicable system testing and adjustments, as applicable to ensure proper system functions upon completion of repair.

6. All service calls, including associate repair work must be completed within 96 hours after COR and contractor review, unless another time frame is agreed to in writing beyond the initial 96 hours by the contractor and the Government.

7. Request for service may be made by the COR /CO via email, phone, or in-person.

8. Upon receipt of initial request

A. The contractor must respond by contacting the COR within a one-hour time frame during normal operational hours and by the start of the next workday for after hour requests. The response can include, verbal, written or physical (on-site).

B. For each service call, the Contractor shall provide to the COR documentation that contains the following minimum information.

i A description of the problem.

ii The location of the problem.

iii A description of the action taken to resolve the problem.

iv The time and date corrective action was completed.

v The name of the person who corrected the problem,

9. All service-related calls are to be at no cost to the Government. Any associated costs outside of routine maintenance, warranty related work or replacement items, not supplied by the Government, will require a quote to be provided by the contractor. Upon acceptance and agreement by the Government that the additional work is required and necessary, a separate Task Order will be issued for the additional work that is required. The quote must at least include:

A. Detailed description of service being provided, include date and time of initial request.

B. Detailed description of all required parts and materials

C. Estimated delivery schedule for completion.

D.3.7 REPAIRS – NON-EMERGENCY (NON-SERVICE CALL)

A repair – non-emergency is defined as any scheduled and/or unscheduled work that is required to prevent a piece of equipment or system component from breakdown/failure that may have been found through preventive maintenance or routine inspection or observation by contractor and/or Government personal, that was not identified through a service call. The contractor shall:

1. Report any issue that requires repair and/or replacement or may lead to a repair and/or replacement to the COR within 24 hours of the finding.

2. If the Government identifies an issue, and the COR reaches out to the contractor, the contractor must respond within one (1) hour of receiving during normal working hours of the notification. The notification and response may either be in writing or verbal.

3. The COR and the Contractor will review the identified issue and discuss repair options and other relevant information and provide a quote for the repair.

4. All repairs must be completed within 24 hours after COR and contractor review unless another time frame is agreed to in writing beyond the initial 24 hours by the contractor and the Government.

D.3.8 NON-REIMBURSABLE REPAIRS

1. Repairs resulting from the Contractor’s failure to perform preventive maintenance specified in this contract are within the scope of the contract and are the responsibility of the Contractor.

2. If a Contractor is called back in to make repairs to equipment that has already been repaired within the same 72-hour period, the callback work shall be performed at the Contractor’s own cost and is not considered reimbursable by the Government, unless additional issues were found not related to the initial repair.

D.3.9 SNOW/ICE REMOVAL

A. The Contractor shall maintain and ensure the heating system for the plaza is functional through regular maintenance and testing. Contractor shall utilize the system as needed to prevent ice buildup.

B. Prior to an inclement weather event contractor shall ensure the system is fully operational and activate it.

Once event is complete and icing hazard is abated contractor shall deactivate the system.

D.3.10 BRONZE SCULPTURE CONSERVATION

1. The Contractor will be responsible for maintenance of The Young Man bronze statue, the bronze statue group honoring Eisenhower as the Supreme Commander of the Allied Expeditionary Force during WWII, the bronze statue group honoring Eisenhower as the 34th President of the United States, and the bronze medallion.

2. The Contractor shall hire a Bronze Sculpture Conservator and Conservation Technician with the following qualifications: Sculpture conservator must have at least five (5) years on-going, regular experience specializing in cleaning and conserving exterior bronze sculptures of the same or similar type, material, and conditions as those to be cleaned and treated on this Project. Conservator shall be a Professional Associate or Fellow of the American Institute for Conservation (AIC). Skilled conservation technicians must be fully trained and have at least three (3) years on-going, regular experience in the protection, repair, and cleaning of exterior bronze sculptures of the same or similar type, material, and conditions as those to be cleaned and treated on this Project. Contractor shall demonstrate to Owner’s satisfaction that the conservation technician proposed has successfully completed at least two (2) projects similar in scope and type to each treatment for which the conservation technician is proposed, including specific types of materials and conditions as well as specific products and treatments specified.

3. The Contractor shall complete a total of one (1) bronze statuary conservation maintenance visits per year.

Contractor shall submit schedule of maintenance visits to COR for approval prior to work being started.

4. The Contractor shall perform a comprehensive, hands-on conditions assessment of the Young Man bronze statue, the bronze statue group honoring Eisenhower as the Supreme Commander of the Allied Expeditionary Force during WWII, the bronze statue group honoring Eisenhower as the 34th President of the United States, and the bronze medallion during the first maintenance visit. The annual condition assessment report shall document conditions requiring repair and treatment and develop recommendations for treatments. The Contractor shall provide a Conditions Assessment Report after the site visit. A brief condition assessment with photographs should be conducted before conservation treatment at each site visit.

5. The Contractor shall clean the bronze sculpture using non-ionic detergent (Non-ionic and pH-specific surfactants), natural bristle scrub brushes, and pressurized water rinsing.

i. The Contractor shall protect stone masonry and other memorial elements and finishes from danger or deterioration caused by work.

ii. The Contractor shall protect adjacent elements and finishes from contact with chemicals used for bronze element restoration.

iii. The Contractor shall protect the site, landscape features, lawns, trees, and other vegetation, public rights of way, and other surrounding elements from damage and deterioration.

6. The Contractor shall provide protective wax coatings on all exterior surfaces of bronze sculpture (a blend of carnauba and microcrystalline waxes or a proprietary product suitable for hot and cold wax applications that can be deposited and spread to a suitable thickness that will even out and harmonize the appearance of the existing non-uniform patina and protect the substrate from contact with the atmosphere for a period of one year). The procedure shall follow this schedule:

i. Condition assessment and report, wash bronze to remove failed or old wax, apply a cold wax and buff, brief conservation treatment report.

ii. The maintenance should be performed between March and November.

7. After the maintenance visit, the contractor shall provide a Conservation Treatment Report.

i. Conservation Treatment Report: All cleaning and waxing performed as part of this work shall be documented in a Conservation Treatment Report complying with the recommendations for treatment reports and “The Guidelines for Practice” of the American Institute for Conservation of Historic and Artistic Works (AIC). The report shall include, but not be limited to, daily log (persons performing specific work items, site temperature and humidity, work accomplished, materials and procedures used, and observations on surfaces during work), description of all work undertaken on each surface, (including, but not limited to, materials and procedures used, successful and unsuccessful test performed, and copies of photographs during work). The Conservation Treatment Report shall be prepared and signed by the Conservator. A brief treatment report with photographs should be recorded after conservation treatment at each site visit.

8. The Contractor is responsible for informing the COR of any damage or deterioration.

D.3.11 GENERAL MASONRY CLEANING

1. The Contractor shall hire a Masonry Cleaning Specialist with the following qualification to complete the work listed in this section. Masonry Cleaning Specialist must be regularly engaged in cleaning masonry on historic buildings or sculptures. Contractor/ Project Lead be a Professional Associate (PA) or Fellow of the American Institute for Conservation (AIC).

2. The Contractor shall be responsible for cleaning the general soiling from the granite masonry, including granite paving, using heated pressurized water rinsing (400 psi or lower with a 40-degree fan-tip and 140-160 degrees F). This cleaning shall be performed twice a year, once in the spring and once in the fall. All granite elements should be generally cleaned with heated pressurized water. The inscribed painted lettering should be carefully cleaned, and care should be taken so that the paint is not removed during this maintenance.

3. The Contractor shall clean the limestone with a non-acidic gel cleaner (cleaner recommendation or approved equal: 942 Limestone and Marble Cleaner, Prosoco) and heated pressurized water (400 psi or lower with a 40 degrees fan-tip and 140-160 degrees F) applied with a nylon brush and agitated with a nylon bristle scrub brush. The limestone should be rinsed until a neutral pH is achieved. All non-stone elements should be protected during chemical cleaning. Contractor and COR will schedule this cleaning after contract is awarded.

4. Prohibited Materials and Methods: The following methods are strictly prohibited and shall not be used for work of this Contract: sandblasting, steam, and use of nonproprietary acids, alkalis, and other products not formulated specifically as products for masonry cleaning.

5. The Contractor shall keep a Daily Log onsite and available for inspection describing the masonry cleaning operations. Log shall record temperature at the beginning and ending of work, weather conditions, whether masonry was wet or dry prior to beginning work, personnel on site, areas cleaned, and procedures used, areas inspected and accepted, and other relevant information.

6. Environmental Conditions: Use of Water: Do not perform masonry cleaning work that will wet masonry materials or cause them to be wet when ambient temperature is below 40 degrees F or when temperature of air or masonry is expected to drop below 40 degrees F within 72 hours as predicted for Washington, D.C. by the National Weather Service. Do not begin work when any part of wall or any materials are frozen or subject to freezing.

7. Water pressure and Flow Rate: Limit water pressure and flow rates to maximums pressures specified herein and to lower pressures as required to avoid damaging masonry, metals, sealants, and other materials and finishes.

i. Pressure: Should be 400 psi or less as required to avoid damage to materials being cleaned.

ii. Flow Rate: 6 gallons per minute.

iii. Heat: Should be between 140-160 degrees F.

8. Nozzle Position: The Contractor shall hold the nozzle at a uniform distance from and angle to masonry surface as determined by testing and confirmed by mock-ups to provide optimum cleaning without damaging masonry surfaces. Nozzle shall be at least 12 inches from masonry surface.

9. Adjustments: If any material is damaged or deteriorated by water rinsing, the Contractor shall immediately cease work. Do not resume pressure washing until water pressure and flow rate have been adjusted to avoid damage to materials. Contractor to inform COR of damage or deterioration.

10. Uniform Cleaning: The Contractor shall clean masonry to achieve even, uniform surfaces so that edges, corners, crevices, profiles, and recessed areas are cleaned to the same extent as flat surfaces.

D.3.12 LANDSCAPE & GROUNDS MAINTENANCE

1. GENERAL SERVICES FOR THE DWIGHT D. EISENHOWER MEMORIAL MOWING,

TRIMMING, EDGING, BED MAINTENACE, LEAF/DEBRIS REMOVAL, HARDSCAPE

MONITORING, ROPES/STAKES, IRRIGATION, CLEAN/CHECK WATER FOUNTAINS, CLEAN

MAP SIGNS/ROAD SIGNS/PARKING METERS, REMOVE STICKERS FROM ALL SURFACES.

MOWING:

Tall Fescue Maryland Avenue Turf Zone measures .55 Acres in total area.

Native Fine Fescue Turf Zone Measures 1.15 Acres in total area.

It is imperative that grass that is stressed from wilt, excess moisture, or other biological factors not be mown until the situation is discussed with the COR. It is best to error on the side of caution. The turf can be mowed at a time determined less stressful. Turf loss due to failure to follow these instructions will be remedied at the expense of the Contractor.

1. Prior to mowing, the contractor shall ensure that the turf area to be mowed are at a proper moisture content, firmness to prevent damage. This can be accomplished with the use of a TDR 350 Field Scout Meter or COR approved equal. COR will provide specific ranges and applications of meter metrics.

2. The Contractor shall inspect/police turf areas prior to mowing for litter and hazards.

3. All mowers shall be equipped with mulching blades and sharpened at a minimum interval of 40 use hours.

4. On the Maryland Turf Panels, it is recommended that zero turn mowers be used. It is also recommended that a cleanup cut is first made and then all turnings be done in the grass as any tire marks left on the hardscape must be removed immediately through pressure washing. The direction of cut will be as follows and then repeated:

i. Long angle left to right

ii. Long angle right to left

iii. 12-6

iv. Block Cut Left to Right long way

v. Block Cut Right to Left long way

5. On the Maryland Turf Panels (.55 acres), the grass shall be maintained at a Height of Cut (HOC) of 3.0-3.5 inches and will be mowed at a frequency needed to accomplish such. The frequency and HOC are best determined through consultations with the COR. Expect a mowing frequency of one to two times a week based upon seasonal conditions.

6. On the Tall Fescue Native Areas, the grass will be mowed once or twice a year, once in Spring and once in Fall decided upon in consultation with the COR, using a mulching bagged push mower set as high as possible. It is imperative that prior to each mowing pass, a person stands up the grass using a plastic fan rake to prevent any possible scalping which Fine Fescue cannot tolerate.

7. In one mowing never remove more than 1/3 of the total leaf blade length to reach the desired HOC. It is best to gradually lower even if this means 3 or more mowing’s in a week. This will be strictly enforced and any damage to the turf environment from failure to follow this guidance will be remediated at the Contractor’s expense.

8. Streaking or uneven cut must be addressed immediately to provide a uniform level of cut.

9. Grass clippings shall be removed or mulched when visible after mowing to leave a neat, clean and uniform appearance.

10. Mowers shall make turns on the turf in a gentle fashion so as not to mark or tear grass.

11. Wheel marks should not be left on hardscape upon completion. If wheel marks are generated, notify COR of situation so that proper methods can be taken to remedy situation at Contractor’s expense.

12. Clippings left behind on turf/hardscape/curb shall be picked up or dispersed.

13. The Contractor shall maintain turf within the results defined in the Performance-Based Matrix.

14. The Contractor shall follow the following safe road transport actions while mowing:

i. Safety Triangle.

ii. Safety Beacon Light on the mower that can be seen from the front and the rear.

iii. Safety vest worn by the operator.

iv. Roll Over Protection System in place.

v. At no time will mower be left unattended with key in ignition.

15. The Contractor shall be responsible for the repair of all damage caused by the contractor to turf or existing infrastructure, for example: hydraulic leaks, damaged mower blade, mudding or tracking, uneven applications of fertilizer or pesticides, etc.

16. The Contractor shall schedule turf cutting so that it does not interfere with Special Events and/or outdoor activities. The contractor will request a copy of permitted mall events from the COR on a bi-weekly basis.

17. Special Events may require adjustment to the turf mowing schedule which the contractor shall honor in coordination with the COR.

TRIMMING:

All areas shall be trimmed concurrent with mowing and involves all grounds.

1. Contractor will be liable for all damage to trees and infrastructure caused by trimming operations.

2. Grass and weeds shall be trimmed around trees, shrubs, buildings, fences, poles, posts, fire hydrants, barriers, boulders, and all other fixed obstacles.

3. Trimming height shall match surrounding area turf heights dependent upon location, Maryland Tall Fescue Zone or Fine Fescue Zones.

4. The Contractor shall maintain turf with the results defined in the Performance-Based Matrix.

EDGING:

Sidewalks, driveways, curbs, and other concrete or asphalt edges located within the Memorial Turf and Tree grounds areas shall be edged at least every two weeks.

1. Edging shall include removal of vegetation from cracks in sidewalks, driveways, and curbs/roadway interfaces within .5 inch of the edged surface

2. The Contractor shall maintain turf and ornamental edges with results defined in the Performance-Based Matrix.

MAINTAIN PLANTING BEDS:

1. Weeding: Eliminate weeds, maintain mulch. All weeds shall be removed or eradicated manually, mechanically or chemically (with COR approved herbicide). All improved grounds should look well-maintained at all times.

2. Mulching: The Contractor shall mulch to standards required in the Performance-Based Matrix. The Contractor shall annually replace all ornamental plant bed mulch, including borders and openings within ground cover beds with COR approved commercial grade shredded hardwood bark mixed with compost ending up with a dark brown color. The Contractor shall replenish/refresh mulch throughout the year as needed to maintain Performance-Based Matrix standards.

i. Unloading mulch onto tarped, containment areas or multiple areas to then distribute around the site is authorized.

3. Pruning: The Contractor shall prune/shear plant life in accordance with ANSI A300 (Part 1)-2008 standards or most up-to-date version. The Contractor shall address incidental or minor pruning issues throughout the year as appropriate and/or necessary to remove any damaged, unhealthy, or unsafe branches. ‘Act of God’ events, site preparation for construction, security line of sight issues, interior canopy thinning for bird control, helicopter damage, and damage done by others are not considered to be incidental.

The Contractor shall prune/shear specific plants and trees (hedges, etc.) in the landscape as horticulturally appropriate to maintain characteristic plant/planting shape, size, location, function, health, and overall plant integrity and aesthetics.

i. Lagerstroemia indica x fauriei ‘Natchez’: The Lagerstroemia should have limited pruning of growing branches and avoid having the top branches cut back. Too much pruning from the top sends suckers shooting from the bottom resulting in additional pruning and unnecessary care. Pruning should happen in early spring before the tree breaks dormancy. There should be consistency across the trees to ensure there are a similar number of main trunks, three (3) being the desired number. Pruning of branches should be done in a manner to expose the trees trunk structure.

ii. Magnolia virginiana: Any necessary pruning should occur after blooming and during the growing season as dormant magnolias do not easily heal. The magnolia has a natural conical shape and should be pruned to this shape. The magnolia should be limbed up over time to allow for pedestrian circulation on adjacent paved surfaces whilst maintaining overall form.

4. Trees

i. The Contractor is responsible for removing epicormics growth (water shoots) from trees throughout the growing season which shall be performed or overseen by an International Society of Arboriculture (ISA) certified arborist. Pruning shall conform to American National Standards Institute (ANSI) A300 pruning standards for maintenance pruning and hazard pruning. ANSI Z-133 and the OSHA CFR29 standards and the industry’s BMP’s (Best Management Practices) shall be met. https://www.osha.gov/laws-regs/regulations/standardnumber/1910 Tree health shall be maintained at an “Exceptional Appearance” level of aesthetics. The arborists tree inspections shall include a record of any conditions which affect the health and/or condition of the tree and recommend corrective treatment for these conditions. Contractor shall gain approval from COR (subject matter expert) before treatment beyond pruning is performed.

ii. Dead…