Amend_2.pdf
PDF 94 KB Posted
- Attached to
- Replace Anacapa Stiff-Leg Derrick Crane with a Two-Crane System Federal contract opportunity
- Solicitation number
- 140P2019R0033
About this file
Amendment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Solic_Amendment_No._3_140P2019R0033_SF_30.pdf | ||
| B09_Solic_Amendment_No._1_140P2019R0033_SF_30.pdf | ||
| B09_Solic_Amendment_No._1_Site_Visit_Sign_In_Sheet.pdf | ||
| B09_Solic_Amendment_No._1_Drawing_Sheet_2_G1.pdf | ||
| B03_DOL_Wage_Determ_CA15_2-1-2019.pdf | ||
| A06_Drawings_CHIS_185164_Combined_Set.pdf | ||
| A06_Specifications_CHIS_185164.pdf | ||
| B08_Solit_140P2019R0033_SF_1442_&_Clauses.pdf | ||
| B08_Solit_140P2019R0033_Attach_7.pdf | ||
| A06_Dwgs-Specs_Anacapa_Rock_Engineering_Report_Final,_01-13-2017.pdf | ||
| B08_Solit_PSP_Vol_I_&_II.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2019R0033 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
05/08/20190002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/28/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment No. 2 is to provide official Government responses to various questions from potential offerors.
Q1. Attachment 7 states "Contractor will need to bring water for concrete and operations."
However, at the pre-bid meeting the NPS representative said that the National Parks would supply water. There will be significant water requirements for this project and brining water to the island is expensive. Please clarify, will the Contractor need to supply water for construction and personnel purposes or will the National Park Service provide water on the island?
A1. The NPS will provide water for the housing area and for construction.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Dane Johnson
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2019R0033/0002
Q2. Attachment 7 states: "There is power available to the contractor. Needs to be coordinated with the park for its use." During the site visit it was stated that the contractor would need to bring in generators for construction power. Will the contractor be responsible for supplying their own power for construction work?
A2. NPS will provide power for the housing area but as power requirements may vary for construction, the contractor will be responsible for providing power at the job site.
Q3. Attachment 7 says "No full size trucks.
Need to minimize footprint on existing trails.
Gator ATV size is acceptable." Please confirm, the contractor will not be allowed to bring a pickup truck to the island, but they may bring a
Gator (or similar) 4 passenger UTV.
A3. Due to narrow trails and limited turning areas the use of a full size truck is not allowed. uUe of a 4-6 person UTV is allowed.
Q4. Per Section L - Instructions, Conditions and
Notices of Offerors, it states that each Volume
(Volume I-Technical and Volume II - Business &
Price) are to be submitted on four (4) USB thumb/ flash drives. Can we have Volume I and II combined on each flash drive so there is only a total of four (4) or does there have to be four
(4) for each volume, equaling (8)?
A4. The Offerors will need to supply four (4) thumb/flash drives for Volume I and separate thumb/flash drives for Volume II for a total of eight (8) thumb drives.
Q5. Will there be a cut off date established for receipt of questions?
A5. Yes, the cut off date for receipt of all questions is Friday, May 10, 2019 in order to provide sufficient time for any formal Government responses before proposals are due.
All other terms and conditions of the solicitation remain unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it.