Amend_2.pdf

PDF 94 KB Posted

Attached to
Replace Anacapa Stiff-Leg Derrick Crane with a Two-Crane System Federal contract opportunity
Solicitation number
140P2019R0033
Issued by
Department of the Interior National Park Service National Office

About this file

Amendment 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace Anacapa Stiff-Leg Derrick Crane with a Two-Crane System, newest first.
File Type Posted
B09_Solic_Amendment_No._3_140P2019R0033_SF_30.pdf PDF
B09_Solic_Amendment_No._1_140P2019R0033_SF_30.pdf PDF
B09_Solic_Amendment_No._1_Site_Visit_Sign_In_Sheet.pdf PDF
B09_Solic_Amendment_No._1_Drawing_Sheet_2_G1.pdf PDF
B03_DOL_Wage_Determ_CA15_2-1-2019.pdf PDF
A06_Drawings_CHIS_185164_Combined_Set.pdf PDF
A06_Specifications_CHIS_185164.pdf PDF
B08_Solit_140P2019R0033_SF_1442_&_Clauses.pdf PDF
B08_Solit_140P2019R0033_Attach_7.pdf PDF
A06_Dwgs-Specs_Anacapa_Rock_Engineering_Report_Final,_01-13-2017.pdf PDF
B08_Solit_PSP_Vol_I_&_II.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2019R0033 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

05/08/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/28/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment No. 2 is to provide official Government responses to various questions from potential offerors.

Q1. Attachment 7 states "Contractor will need to bring water for concrete and operations."

However, at the pre-bid meeting the NPS representative said that the National Parks would supply water. There will be significant water requirements for this project and brining water to the island is expensive. Please clarify, will the Contractor need to supply water for construction and personnel purposes or will the National Park Service provide water on the island?

A1. The NPS will provide water for the housing area and for construction.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Dane Johnson

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2019R0033/0002

Q2. Attachment 7 states: "There is power available to the contractor. Needs to be coordinated with the park for its use." During the site visit it was stated that the contractor would need to bring in generators for construction power. Will the contractor be responsible for supplying their own power for construction work?

A2. NPS will provide power for the housing area but as power requirements may vary for construction, the contractor will be responsible for providing power at the job site.

Q3. Attachment 7 says "No full size trucks.

Need to minimize footprint on existing trails.

Gator ATV size is acceptable." Please confirm, the contractor will not be allowed to bring a pickup truck to the island, but they may bring a

Gator (or similar) 4 passenger UTV.

A3. Due to narrow trails and limited turning areas the use of a full size truck is not allowed. uUe of a 4-6 person UTV is allowed.

Q4. Per Section L - Instructions, Conditions and

Notices of Offerors, it states that each Volume

(Volume I-Technical and Volume II - Business &

Price) are to be submitted on four (4) USB thumb/ flash drives. Can we have Volume I and II combined on each flash drive so there is only a total of four (4) or does there have to be four

(4) for each volume, equaling (8)?

A4. The Offerors will need to supply four (4) thumb/flash drives for Volume I and separate thumb/flash drives for Volume II for a total of eight (8) thumb drives.

Q5. Will there be a cut off date established for receipt of questions?

A5. Yes, the cut off date for receipt of all questions is Friday, May 10, 2019 in order to provide sufficient time for any formal Government responses before proposals are due.

All other terms and conditions of the solicitation remain unchanged.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)