- Replace Anacapa Stiff-Leg Derrick Crane with a Two-Crane System Federal contract opportunity
- Solicitation number
- 140P2019R0033
About this file
SF 30 Solicitation Amendment No. 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Solic_Amendment_No._3_140P2019R0033_SF_30.pdf | ||
| Amend_2.pdf | ||
| B09_Solic_Amendment_No._1_Drawing_Sheet_2_G1.pdf | ||
| B09_Solic_Amendment_No._1_Site_Visit_Sign_In_Sheet.pdf | ||
| B03_DOL_Wage_Determ_CA15_2-1-2019.pdf | ||
| A06_Drawings_CHIS_185164_Combined_Set.pdf | ||
| B08_Solit_140P2019R0033_Attach_7.pdf | ||
| A06_Dwgs-Specs_Anacapa_Rock_Engineering_Report_Final,_01-13-2017.pdf | ||
| B08_Solit_PSP_Vol_I_&_II.docx | DOCX document | |
| A06_Specifications_CHIS_185164.pdf | ||
| B08_Solit_140P2019R0033_SF_1442_&_Clauses.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2019R0033 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
04/22/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/28/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CHIS 185164 - Replace Anacapa Stiff-Leg Derrick Crane with a Two-Crane System, Channel
Islands National Park, Ventura, CA.
The purpose of this Amendment No. 1 is to extend the due date for receipt of offers, incorporate a revised drawing, provide the sign in sheet from the pre-proposal conference/site visit held on April 17, 2019, and provide official Government responses to questions from potential offerors.
Schedule of Changes
1. The hour and date specified for receipt of offers is extended to May 16, 2019 at 2:00
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Dane Johnson
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2019R0033/0001
PM MDT.
2. Drawing sheet 2 of 26, Sub Sheet G1
(attached), is revised to remove General Note
Number 2. The Contractor is NOT required to have a California contractor license.
3. The sign in sheet from the April 17, 2019 pre-proposal conference/site visit is attached.
4. The following are questions from potential offerors, and the official Government response:
Q1 - For purposes of evaluating the capabilities and previous experience of offeror, if the offeror is a joint venture, will the capabilities and experience of each member of the joint venture be considered?
A1 - Yes.
Q2 - Also, is there or will there be a cutoff date for submission of questions?
A2 - Yes, in a forthcoming amendment.
Q3 - If an offeror responded to Solicitation
140P2018R0014 for the Replace Anacapa Stiff-Leg
Derrick Crane project in 2018, can that offeror¿s
Past Performance Questionnaires that were submitted for that Solicitation be used for the current Solicitation 140P2019R0033 or do we have to get new Past Performance Questionnaires from our past clients?
A3 - All Offerors are required to submit Past
Performance Questionnaires. If you previously submitted a proposal on the prior requirement, new Past Performance Questionnaires are required as part of the submission for this solicitation.
All other terms and conditions are unchanged.