Revised Proposal Form-Schedule of Prices_0001.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- AFTC- Domestic Water System Rehabilitation
- Solicitation number
- 140F0121R0016
About this file
This document contains a bid form schedule and federal contract opportunity notice. The bid form schedule outlines 11 tasks required for the domestic water system rehabilitation project at Abernathy Fish Technology Center, including site preparation, piping installation, building construction, mechanical, electrical and instrumentation work. Pricing is requested for each task. The federal contract opportunity is a firm-fixed-price construction contract between $500,000 to $1,000,000 to be awarded based on best value. The work must be completed within 180 days of the notice to proceed. This is a total small business set-aside held by the U.S. Fish and Wildlife Service Joint Administrative Operations. Responses are due by the date listed in the solicitation number provided.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form Schedule (11x17)
| ABERNATHY FISH TECHNOLOGY CENTER. |
| DOMESTIC WATER SYSTEM REHABILITATION AND ALL ASSOCIATED APPURTENANCES. |
| REVISED PROPOSAL FORM |
| SCHEDULE OF PRICES |
| INSTRUCTIONS: |
| The Offeror shall edit this Schedule and may provide a detailed breakdown of their offer (including support documentation) and all associated line item pricing. It is the responsibility of the offeror |
| to ensure all requirements are met. The purpose of the Schedule Document is to organize Base Tasks nd Option Tasks for U.S. Fish and Wildlife Service Price Evaluation. |
| Contractor shall show pricing for each Scheduled item below. Failure to provide pricing for all Scheduled items may result in bid not being considered for award. |
| Construction - Base Offer: | ||||
| Reference | ||||
| Drawing Page(s) | SOW | |||
| Task No. | Description | Quantity | Unit | Amount |
| Not Referenced. | 5.1. |
TASK 1
(BASE) Review Drawing Pages 1.0 through 47.0 and All Associated Contract Documents.
Perform a Field Verification Site Visit and Review Existing Site Features and Existing Site Conditions.
[The General Contractor Managment Team shall be required to Attend this Field Verification Site with USFWS.]
After Performing a Field Verification Site Visit, Develop, Prepare, and Submit General Requirement Specification Submittals under Divison 01. Develop, Prepare, and Submit Technical Specification Submittals under All Remaining Division Sections.
| 1 | Lump Sum |
| Not Referenced. | 5.2. |
TASK 2
(BASE) Apply for, Pay, and Secure Local Building Permits and Construction Operating Permits for the Project.
To include but not be limited to:
Development, Preparation, and Submittal of Permit Applications and Supporting Documents for:
County and Local Building Permits (If Required). Contractor shall verify.
Structural, Mechanical, Plumbing, and Electrical Permits and Inspections.
Please note, Electrical Permit and Inspection will be required by USFWS.
Stormwater Pollution Prevention Plan (SWPPP) Permits (If Required). Contractor shall verify.
| 1 | Lump Sum |
| Not Referenced. | 5.3. |
TASK 3
| (BASE) | Mobilization and Demobilization. Mobilize All Labor, Materials, PPE, Equipment, and Tools onto Project Site. | |
| De-Mobilize All Labor, Materials, PPE, Equipment, and Tools from Project Site. | 1 | Lump Sum |
| G00X | 5.4. |
TASK 4
(BASE) Establish Lay Down and Storage Areas and Work Areas.
| Refer to IFB 100% Final Construction Documents for Specific Requirements on Contractor's Lay Down / Storage Areas and Contractor's Work Areas. Contractor shall modify and adjust Lay Down / Storage Areas and Work Areas to meet Construction Functional Requirements and shall closely coordinate any Proposed Adjustments to these Areas with the Fish Technology Center prior to Performing On-Site Work. | 1 | Lump Sum |
| EC001, EC100 | 5.5. |
TASK 5
(BASE) Provide and Install Site, Sediment, and Erosion Control Measures.
To include but not be limited to the following:
Temporary Soil Stabilization Measures.
Permanent Soil Stabilization Measures.
Bare Ground Protection Measures.
All Erosion and Sediment Control Measures (e.g. Sediment Fences, Straw Wattles, Stockpile Covers, Construction Fences).
All Re-Vegetation Measures.
Down Gradient Sediment Control Measures.
Bio Bags and Other Barrier Protection Measures.
Develop, Prepare, Submit, and Maintain an On-site Written Spill Prevention and Response Procedure.
Develop, Prepare, Submit, and Maintain Toxic and Hazardous Materials Storage, Application, and Disposal Procedures.
| Refer to IFB 100% Final Construction Documents for Specific Requirements on Site, Sediment, and Erosion Control Measures. | 1 | Lump Sum |
| GC001, GC002, D100, | ||
| C100 - C201 | 5.6 |
TASK 6
(BASE) Construct and Install Site Civil Work (Asphalt Cutting and Repair, Storm Water Pollution Prevention Plan (SWPPP), and Temporary Construction Works).
To include but not be limited to:
Demolition, Removal, and Disposal of Existing Treatment System and Piping in Existing Pump House.
Demolition, Removal, and Disposal of Existing Piping in the Interior of the Hatchery Building.
Asphalt Drive Area Cuts and Demolition, Removal, and Disposal Work.
Installation of Temporary Construction Fencing.
Re-Vegetation and Re-Seeding of Disturbed Areas.
Restoration of Bollards, Drainage Sump, and Existing Conditions at Hydrants.
| Civil Miscellaneous Items (Outlet Drain Pipes, Finish Grading, Among Other Items). | 1 | Lump Sum |
| D100, |
GC001 - GC002,
C100 - C201 5.7.
TASK 7
(BASE) Construct and Install Yard Piping to include New Connections to Fire System Hydrants and Potable Water to Buildings.
To include but not be limited to:
Ground Penetrating Radar (GPR) Survey of Existing Buried Utilities prior to Construction and On-Site Work Activities.
Development, Preparation, and Submittal of GPR Survey CAD Drawing Results.
Fire Hydrant New Connections and New Piping Modifications.
Miscellaneous Yard Piping Connections / Disconnections.
New 2" Diameter Buried Schedule 80 PVC Piping and Accessories.
New 2.5" Diameter Buried Schedule 80 PVC Piping and Accessories.
New 3" Diameter Buried Schedule 80 PVC Piping and Accessories.
New 4" Diameter Buried Schedule 80 PVC Piping and Accessories (Booster Pump Building Drain).
New 3" Diameter Butterfly Valves (V-01, V-41) (Flg x Flg w/ 2" Square Nut, SS Bolting).
Disconnect and Take Offline the Legacy Filter Tank and Treated Water Line.
Encasement of Existing 6" Diameter Hatchery Pipe in CLSM Trench.
Asphalt Re-Paving Work and Subgrade Preparation (~320-Feet by ~1.5-Feet by 3" Thick Top Course).
(Includes All Associated Excavaton, Over-Excavation, New Pipe, New Pipe Appurtenances, Fill, Backfill, Compaction, Re-Surfacing, and Re-Vegetation required for 100% Complete Contractor Turnkey Installation.)
| Refer to IFB 100% Final Construction Documents for Specific Requirements on New Pipe Layouts and Existing Pipe Disconnections and Isolation Points. | 1 | Lump Sum |
| GS001 - GS003, | ||
| S100 - S103 | 5.8. |
TASK 8
(BASE) New Cast-In-Place Foundation System and Building - For Pump and Hydropneumatic Tank House.
To include but not be limited to:
- Floor Slab and Foundation Concrete - Includes Design, Materials, and Construction / Installation.
- Pre-Engineered Metal Building and Roof Fabrication - Includes Design, Materials, Fabrication, and Construction/Installation.
- Floor Trench-Drain System - Includes Materials and Construction / Installation.
- Double Doors, Miscellaneous Architectural, Stoop, etc. - Includes Materials and Construction / Installation.
Refer to IFB 100% Final Construction Documents for Specific Requirements.
| [Contractor's Final Design Documents (Drawings and Specifications) for Pump and Tank House Foundation System and Pre-Engineered Metal Bulding Superstructure shall be signed, stamped, and sealed by a Professional Engineer registered in the State of Washington.] Contractor shall Develop, Prepare, and Submit Final Design Documents and All Associated Engineering Calculations prepared for the Pump and Tank House to USFWS. | 1 | Lump Sum |
| GM001 - GM003, |
M200 - M301, GH001, H201 5.9.
TASK 9
(BASE) Construct and Install Mechanical Work Items (Inside New Pre-Engineered Metal Building and Hatchery Building).
To include but not be limited to:
Vertical In-Line Centrifugal, 16-Stage Booster Pumps (P-10, P-20) and Accessories.
Chemical Feed Pumps (CP-30, CP-40, tubing Qdos 20 or Equal) and Accessories.
Chemical Feed Pump Table and Accessories.
528 Gallon Steel Bladder Tank (HPT-1, HPT-2) and Accessories.
100 Gallon HDPE Tank (TK-50; Sodium Hypochlorite Day Tank) and Accessories.
Pump Tube Vertical Suction Mixer (M-50).
2" Diameter In-Line Horizontal Static Mixer (M-60).
Water Quality Analyzer (AE-70) and Accessories.
2" Diameter Lug-Style Butterfly Valves (V-13, V-23, V-30) and Hardware.
Miscellaneous Ball Valves and Check Valves (3" Diameter and Smaller).
Interior Piping (Galvanized Steel, Copper Tubing, Schedule 80 PVC) and Fittings.
Safety Eye Wash System.
HV for Building (Exhaust Fan, Intake Louver, Control Panel, and EUH).
Hatchery Building Piping Modifications.
Miscellaneous Hardware, Pipe Supports, Labeling, Etc.
| Refer to IFB 100% Final Construction Documents for Specific Requirements. | 1 | Lump Sum |
| Not Referenced. | 5.10. |
TASK 10
(BASE) Perform Special Inspections and Tests for the Full Duration of On-Site Work Activities and as part of the Contractor's Quality Assurance and Quality Control Program and Plan (QA-QCPP).
To include but not be limited to:
Laboratory, Shop, and Field Inspection and Test Reports for:
International Building Code - Special Inspections and Tests.
Exterior Pipe Utility Tests and Inspections. For example, Hydrostatic Pressure Tests, Leakage Tests, and Flushing, Disinfection, and Purging Field Reports and Tests.
Indoor Plumbing Tests and Inspections. For example, Hydrostatic Pressure Tests, Working Pressure Tests, Leakage Tests, Flushing, Disinfection, and Purging Field Reports and Tests.
Laboratory Analyses and Testing for:
Bacteria (BAC-Ts) to include Total Coliform and E. Coli Sampling and Testing after New System is put into service. Sampling and Testing for Bacteria to be performed Only After No New Breaks, Connections, and Re-Connections are Established on the Potable Drinking Water System.
| 1 | Lump Sum |
| GE001 - GE002, E001 - E300, |
GI001 - GI002,
I200 - I201 5.11.
TASK 11
(BASE) Construct and Install Site Electrical and Instrumentation Work (at Existing Electrical Building and Pump House).
To include but not be limited to:
Hypochlorite Feed System Control Panel.
Pressure Gauge and Dual Press. Switch Assembly on Pump Discharges.
Electrical Distribution Panel, 480/3/60 VAC.
Electrical Distribution Panel, 208/1/60 VAC.
Lighting Fixtures (Interior and Exterior).
Building Outlets and Wiring.
Conduit, Surface, RGS.
Software and Programming for SCADA / Controllers.
Buried PVC Schedule 80 Conduit, Including Trenching.
Instrumentation Miscellaneous (Smoke Detector and Tie-In, Etc.).
Electrical Miscellaneous.
Refer to IFB 100% Final Construction Documents for Specific Requirements.
| 1 | Lump Sum | ||
| Not Referenced. | Not Ref. | ||
| (BASE) | All Other Necessary Work for a Complete and Operable Project In Accordance With All The Requirements of the PE Stamped and Signed Bid Documents (Drawings and In-Drawing Specifications). | 1 | Lump Sum |
| Total | $0.00 |
| Incomplete Offers Will Not Be Considered. |
Name of Offeror, Company, and DUNS:
Address (Include Zip Code):
Sheet1
| G001 - G00X, |
| EC001, EC100, |
| D100, |
| GC001 - GC002, |
| C100 - C104, |
| C200 - C201, |
| GS001 - GS003, |
| S100 - S103, |
| GM001 - GM003, |
| M200 - M203, |
| M301, |
| GH001, |
| H201, |
| GE001 - GE002, |
| E001, |
| E100, E200, E300, |
| GI001 - GI002, |
| I200 - I201 |