1._Question_QCI_1_RE_NOAA_Configuration_Sheet.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Beechcraft King Air 350 for NOAA AOC
Solicitation number
1305M219RNMAN0004
Issued by

About this file

Vendor Qs (1 of 2)

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CLINCLIN Description as recorded on installation review sheetCLIN Description as recorded on contract amendmentsContract ModDate AddedSupplierAssoc. Avcon Dwg No.FM21RFP/SOW For New A/CNotes
0001King Air 350CERBasic09/17/07HBCBasic AircraftX
0002Camera Ports 18-21 inchBasic09/17/07AvconXBoth 21 inchboth to be identical size, location, and capabilities as FM-21 - except both are required to be 21 in diameter - clarification question drafted
0003Provide and install custom pressure plates for camera portsBasic09/17/07Avcon1618118XXNoted that the 21 inch requirement actually applies to the pressure plate, not the camera port itself
0004Engineering for quick install/deinstall of camera optical flatsBasicAvcon01409001, 01409003XX
0005Camera Port Dome for one of two portsBasic09/17/07Avcon161050-015XInstallation of aft port dome and flat floor for aft dome only. Is this required for the new aircraft?
0006Provide and install a drift sight port 7.5 inch diameter downward looking portBasic09/17/07Avcon1618113XX
0007Provide and install extended range fuel tank configurationBasic09/17/07HBCXonly if 350CER
0008Provide and install bubble windowsBasic09/17/07Avcon1618111, 1618112XXHBS to provide bubble window kit for dual standard bubble windows
0009Provide and install window blanksBasic09/17/07Avcon1618101XX
0010Provide and install power inverters for aft power stationsBasic09/17/07Avcon350-10001XXInstalled in AC Cabinet
0011Provide and install antenna ports 12 inch diameter upward lookingBasic09/17/07Avcon1618102XXIncludes 6 overhead pin locations for equipment racks.
0012Provide and install rack stations aft including powerBasic09/17/07Avcon1618103, 1618110XXSeparate line items for equipment racks and for power
0013Provide and install intercom system for 8 aft stationsBasic09/17/07Avcon1618106, 1618125XX
0014Provide and install upgrade avionics Garmin 165 GPSBasic09/17/07Avcon1618105-003XXIs the Garmin 165 GPS available. Garmin 625 (or GDL 88) as replacement? DZUS rail mounting will be an issue.
0015Provide and install HG-9550 radar altimeterBasic09/17/07Avcon1618109-003, 1618123XXprovisions only; see CLIN 0031

No equipment for Avcon to purchase. Install wiring (no R/T rack), antenna wiring, antenna doublers (blanking panels), sidewall connector, display connector (no panel cutout).

0016Provide and install Skytrac Satcom System with AFFBasic09/17/07Avcon1618108-003, 1618122XISAT-100 installed on FM-21. See CLIN 0028
0017Provide and install Wolfsburg RT-5000 SystemBasic09/10/08Avcon1618107-003, 1618123XIs the required for the new aircraft
0018Provide and install Collins TCN-500 SystemBasic09/10/08Avcon1618104-003XIs the required for the new aircraft
0019PC-1 Install standard option engine wash rings on both enginesPC-1Amendment 3 21 Apr 200804/21/08HBCXIs the required for the new aircraft
0020PC-2 Pressure dome redesignPC-2Amendment 3 21 Apr 200804/21/08AvconXIncluded CLIN 0020A
0020APC-02A Additional pressure domePC-02AAmendment 3 21 Apr 200804/21/08Avcon1618115XIs the required for the new aircraft
0021PC-03 Additional overhead pinsPC-03Amendment 3 21 Apr 200804/21/08Avcon1618102XIncluded CLIN 0011
0022PC-04 Additional Avcon rackPC-04Amendment 3 21 Apr 200804/21/08Avcon1618103XIs the required for the new aircraft
0023PC-05 RVSM testing Flight Testing Only)PC-05Amendment 3 21 Apr 200804/21/08Aero MachXXVerify RVSM STC has been update to include configuration of FM-21.
0024PC-06 Additional low power dropsPC-06Amendment 3 21 Apr 200804/21/08Avcon1618120XX
0024APC-06A CAT 5 cable installationPC-06AAmendment 3 21 Apr 200804/21/08Avcon1618120XX
0025PC-07 Additional paper manuals (1 set)PC-07Amendment 3 21 Apr 200804/21/08HBSXDo not believe this will be required on this purchase
0026PC-09 Antenna installationPC-09Amendment 3 21 Apr 200804/21/08AvconXIs the required for the new aircraft
0027PC-10 Oversized forward camera portPC-10Amendment 3 21 Apr 200804/21/08AvconXIs the required for the new aircraft
0028PC-11 ISAT - 100 upgrade with phonePC-11Amendment 3 21 Apr 200804/21/08Avcon1618108-003XIs the required for the new aircraft
0029PC-13 Air-to-Air antenna for TACANPC-13Amendment 3 21 Apr 200804/21/08AvconXIs the required for the new aircraft
0030PC-14 Strakes, dual raisbackPC-14Amendment 3 21 Apr 200804/21/08AvconXXWill be installed during production and replaced with SM strakes during bubble windows installation
0031PC-15 Cockpit indicator (HG9550 Radar Altimeter)PC-15Amendment 3 21 Apr 200804/21/08AvconXXpart of provisions
0032PC-16 RT-5000 to RT-5000P-25PC-16Amendment 3 21 Apr 200804/21/08AvconXIs the required for the new aircraft
0034PC-19 Provide and install STC Frakes Exhaust StacksPC-19Amendment 7 30 Jan 200904/21/08HBCdeleteddeleted from FM 21 requirements; used to add oxygen & power drops
0035PC-20 Provide and install Sky Connect Tracker Mission management UnitPC-20Amendment 5 24 Jun 200804/21/08HBCXIs the required for the new aircraft
0036PC-21 Provide and install folding right aft jump seat located at the bubble window to match interior colorsPC-21Amendment 6 10 Sep 200809/10/08AvconXIs the required for the new aircraft
0036PC-22 Provide and install 2 oxygen drops in the aft cabin and two portable oxygen bottlesPC-22Amendment 7 30 Jan 200901/30/09Avcon1618136, 1618137XIs the required for the new aircraft
0036PC-23 Provide and install hard wired power drops at all intercom stations plus 4 a/c power headsetsPC-23Amendment 7 30 Jan 200901/30/09Avcon1618120XIs the required for the new aircraft
Items Requiring Additional Clarification
Aft Forward Facing Electric Flushing (Recirculating) LavatoryXWas included on FM-21 VIP interior; not included in "Slick Interior" option; it this required on the new aircraft or do we remove from FM-21 to support common cabin layout
L-Shaped Curtain / L-Shaped WebNot included in "Slick Interior" option. Partitions were included in FM-21; is this option required on the new aircraft and is this required on FM-21 to support common cabin interior layout
Crash Ax (Loose Equipment)Not included in "Slick Interior" option. Is this option required on the new aircraft?
Cobham DACSNot included in "Slick Interior" option. Is this option required on the new aircraft?
MADRAS Digital Flight Data Recorder (DFDR)Not included in "Slick Interior" option. Is this option required on the new aircraft?
One (1) Yr Flt Mgmt System Database Region Subscription PkgNot included in "Slick Interior" option. Is this option required on the new aircraft?
One (1) Yr Jepp Charts Subscription PkgNot included in "Slick Interior" option. Is this option required on the new aircraft?
130-9031-0001 Engine Wash Drain KitNot included in "Slick Interior" option. Is this option required on the new aircraft.
P&W Engine Service (PWES) FAST Engine Trend Monitor System (w/DTU)Not included in "Slick Interior" option. Is this option required on the new aircraft?
Modification for a downward looking port in center of cabin flooring and aft of the wing spar that penetrates aircraft skin, identical in location, size and capabilities to the existing port in FM-21. Intended use is 9-inch format aerial photography, but may be used for other optical or hyperspectral sensors. Port to include a 21 inch diameter pressure-certified Corning 7980 Fused Silica optical glass and external protective mechanical sliding door, along with metal blank-off plate that can be installed instead of optical glass. Installation to include an optical flat defogging system designed to prevent glass fogging from high altitude transits.XDoes FM-21 have this capability? If not, do we need to include this in CLIN 2001 to standardize cabin layout?
Modification for a downward looking port in the cabin flooring and aft of the forward port (if either forward port option is selected) or in the same location as the aft port in FM-21 (if no forward port is selected), that penetrates aircraft skin, identical in size and capabilities to the existing port in FM-21. Intended use is 9-inch format aerial photography, but may be used for other optical or hyperspectral sensors. Port to include a 21 inch diameter pressure-certified Corning 7980 Fused Silica optical glass and external protective mechanical sliding door, along with metal blank-off plate that can be installed instead of optical glass. Installation to include an optical flat defogging system designed to prevent glass fogging from high altitude transits.XDoes FM-21 have this capability? If not, do we need to include this in CLIN 2001 to standardize cabin layout?
Modification to accommodate a Gamma Sensor System, the RSI RSX-5, in approximately the same location as the forward downlooking port on FM-21 (centerline, aft of the wing spar). Contractor to determine best location and surrounding infrastructure based on detector vendor’s requirements and recommendations (see below for system description and installation considerations). If required for certification, the Contractor shall provide a mounting cage to meet g-load and crash load limits. If the option for this modification is selected, the Government will provide an RSX-5 unit as Government Furnished Equipment for fit and function certification. If the installation includes a non-metallic pressure interface, the Contractor shall provide a metal blank-off plate for use when the gamma sensor system is not installed.XDoes FM-21 have this capability? If not, do we need to include this in CLIN 2001 to standardize cabin layout?
Optical port capability for the forward gamma sensor port. If the forward gamma sensor port is selected, this secondary option is for a drop-in assembly that would replace the pressure interface with a plate incorporating an optical window and external protective sliding door (preferably also mounted to the plate, rather than the surrounding airframe, to reduce the installation/removal effort when switching between systems). The instrument well would also require mounting provisions for the camera system, and an optical flat defogging system.XDoes FM-21 have this capability? If not, do we need to include this in CLIN 2001 to standardize cabin layout?
Modification to accommodate a Gamma Sensor System, the RSI RSX-5, in approximately the same location as the aft downlooking port on FM-21 (across from the entry door, not necessarily on the centerline). Contractor to determine best location and surrounding infrastructure based on detector vendor’s requirements and recommendations (see below for system description and installation considerations). If required for certification, the Contractor shall provide a mounting cage to meet g-load and crash load limits. If the option for this modification is selected, the Government will provide an RSX-5 unit as Government Furnished Equipment for fit and function certification. If the installation includes a non-metallic pressure interface, the Contractor shall provide a metal blank-off plate for use when the gamma sensor system is not installed.xDoes FM-21 have this capability? If not, do we need to include this in CLIN 2001 to standardize cabin layout?
Optical port capability for the aft gamma sensor port. If the aft gamma sensor port is selected, this secondary option is for a drop-in assembly that would replace the pressure interface with a plate incorporating an optical window and external protective sliding door (preferably also mounted to the plate, rather than the surrounding airframe, to reduce the installation/removal effort when switching between systems). The instrument well would also require mounting provisions for the camera system, and an optical flat defogging system.xDoes FM-21 have this capability? If not, do we need to include this in CLIN 2001 to standardize cabin layout?
Oceanic Package (2nd GPS and HF 9000 w/selCal)XThis is required for the new aircraft; is it required for FM-21 CLIN 2001 to standardize cabin layout?
Secondary Nav Package (2nd DME and 2 nd ADF)XThis is required for the new aircraft; is it required for FM-21 CLIN 2001 to standardize cabin layout?
24 inch Extended PedestalXThis is required for the new aircraft; is it required for FM-21 CLIN 2001 to standardize cabin layout?

File details come from the government source that posted it.