13-696-IT-26-O017 Exhibit J.10 BCCE Deliverables.pdf
PDF 97 KB Posted
- Solicitation number
- 696-IT-26-O017
- Issued by
- Texas
About this file
This document is an exhibit detailing deliverables and payment schedules for the Texas Department of Criminal Justice (TDCJ) Broadband Connectivity Continuation and Expansion (BCCE) and Video Surveillance Systems contract. Respondents must complete the form for each Project Unit and provide an estimated target time frame for completion following the kick-off meeting. The contract establishes four primary deliverables: Planning and Design (due 10 business days after kick-off), Shipment of Materials/Equipment (upon completion of each Project Unit), Monthly True-Up of Labor Completed (monthly basis), and Project Completion with closeout documentation and as-built drawings (upon completion of each Project Unit). Acceptance criteria are clearly defined for each deliverable, including submission of design documents in both hardcopy and electronic formats, delivery of 100 percent of materials to destination, monthly labor completion documentation with test results and TDCJ inspection verification, and all required closeout documentation.
The payment structure incorporates a tiered approach with 10 percent payment upon Planning and Design Deliverable acceptance, 100 percent payment for labor and materials with a consistent 5 percent retainage applied across all deliverables. Discounts offered by the respondent reduce the overall payment amounts. This exhibit serves as a critical scheduling and payment framework document that respondents must complete to demonstrate their understanding of project delivery expectations and cost management for TDCJ broadband connectivity and video surveillance system installations across Texas facilities.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
696-IT-26-O017 Exhibit J.10
BCCE Deliverables and Delivery Schedule The Respondent shall complete this form for each Project Unit for which they are submitting pricing. The Respondent shall provide an estimated Target Time Frame for completion after the kick-off meeting.
Unit Name: _______________ Target Time Frame for Completion: ____ (business days)
Deliverable
Description Acceptance Criteria Proposed Payment Schedule
Target Time
Frame 1 Planning and
Design (Section C.7.1.3)
• Design document, system design, project implementation plan.
• One hardcopy on a three-ring binder
• One electronic soft copy on a USB drive.
• 10% upon Deliverable acceptance
• 5% retainage
• Less any discounts offered business days after kick-off meeting
2 Shipment of Materials/ Equipment Section C.7.2.3
Delivery of materials and/or equipment to destination (can be broken up into smaller deliveries depending upon size).
• 100% of materials delivered
• 5% retainage
• Less any discounts offered
Upon completion of each Project Unit
3 Monthly True-Up of Labor Completed (Section C.7.3.2)
• Amount of labor completed in each month.
• Test Results.
• TDCJ inspection.
• 100% of all labor for the month
• 5% retainage
• Less any discounts offered
Monthly
4 Project Completion Sections C.7.4.5 and C.7.4.6)
All close out documentation as required.
As-built Drawings.
N/A Upon completion of each Project Unit