AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NUMBER
A0005
3. EFFECTIVE DATE
05/22/2019
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DRIVE
VALLEJO, CA 94592-1110
SAME AS ITEM 6.
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
12912819Q0012
9B. DATED (SEE ITEM 11)
04/03/2019
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
a) This amendment is for the purpose of providing response to RFI 61 and clarifies previous response to RFI 43, 46, and 56.
See continuation pages.
b) This amendment includes RFP replacement pages 4 and 25 and new RFP attachments no. 9 and 10.
c) The offer due date/time is unchanged. Offers are due NLT Friday, May 24, 2019 - 2pm/1400 PST.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jeremy Bedner, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
05/22/2019 (Signature of person authorized to sign) (Signature of Contracting Officer)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT A0005
RFQ 12912819Q0012
UNAUTHORIZED ROUTE DECOMMISSIONING
CLEVELAND NATIONAL FOREST
US FOREST SERVICE
The following are responses to Request for Information [RFI] 61 and clarifies or revises previous responses for RFIs RFI 43, 46, and 56 received for this solicitation:
1. When pricing optional items related work in the base bid, should we assume contractor would be able to do this work while contractor is on site for the other work? Or are these items that may come up later and require additional mobilization?
ANSWER: Confirming Mobilization is not a price line item for the Optional Items 1-3. Additional mobilization may be required for the optional items. Shall be dependent on the awarded contractor’s anticipated project schedule and the Government’s necessity for the optional items execution.
43. CLARIFY
Can we assume access through the private property as we did on our site visit? Or should we assume access from Lake Morena on the SDGE easement road? If we utilize access from Lake Morena, will SDGE allow road repairs?
ANSWER: The contractor should be able to use either access. Forest Service will contact San Diego Gas & Electric [SDGE] regarding road repair as needed. The contractor is allowed to do minor repair for equipment access. Contractor shall be required to give advanced notice to the Government to include description of intended repair to avoid conflict with SGDE activities. Contractor shall also photo document the work. Prior Forest Service visit to sites December 2018 road was passable.
46. CLARIFY
I’m not sure if the answer indicates that the dam is not removed completely but instead just breached to re-establish hydrology, or if there will be no work at all related to the dam and well?
ANSWER:
Confirming no work.
AMENDMENT A0005
RFQ 12912819Q0012
UNAUTHORIZED ROUTE DECOMMISSIONING
CLEVELAND NATIONAL FOREST
US FOREST SERVICE
56. REVISED
Are the initial bid submittals to be based on the wage determinations provided with the RFP? And then adjustments are made for specific categories? Or should the DBA wage rates to be included in the initial submittal. If that is the case, how will bid pricing be compared if bidders don’t assume the same wage rates for each of the specific work element? There may be confusion as to exactly when something is considered “new construction” especially to related work elements (i.e. grading, etc.) that occur in conjunction with what would typically be viewed as new construction.
REVISED ANSWER:
Offerors shall submit pricing in accordance with the SCA Wage Determinations in addition to the newly added Construction (Davis-Bacon Act) Wage Determinations. Cost breakdown shall be provided identifying those bid items that are priced based on services (SCA WD) and those priced as construction (DBA WD).
The solicitation has been revised as follows:
Section B NOTE 2. This project includes both service and construction work elements. Accordingly, both Service Contract Act [SCA] and Construction (Davis-Bacon Act) Wage Determinations are included in this solicitation. Offerors are instructed to provide a cost breakdown that shall identify those bid items that are priced based on services (SCA WD) and those priced based on construction
(DBA WD).
Section E Attachments. Added:
Attachment 9 DOL Construction Wage Determination (Davis-Bacon) CA190001 05/03/2019 CA1, San Diego County
Attachment 10 DOL Construction Wage Determination (Davis-Bacon), CA190025 05/03/2019 CA25, Riverside County
SEE SOLICITATION REPLACEMENT PAGES 4 AND 25
REPLACEMENT Page 4 of 42
RFQ 12912819Q0012
UNAUTHORIZED ROUTE DECOMMISSIONING
CLEVELAND NATIONAL FOREST
US FOREST SERVICE
SECTION B
SCHEDULE OF SUPPLIES/SERVICE (PRICE SCHEDULE)
The Offeror must submit a price on all items.
NOTE 1: If Offeror does not intend to charge for a bid Item, a price of "0" or "NO COST" should be shown.
NOTE 2: This project includes both service and construction work elements. Accordingly, both Service Contract Act [SCA] and Construction (Davis-Bacon Act) Wage Determinations are included in this solicitation. Offerors are instructed to provide a cost breakdown that shall identify those bid items that are priced based on services (SCA WD) and those priced based on construction (DBA WD).
SPEC NO. DESCRIPTION
Unauthorized Route Decommissioning Cleveland National Forest
MS
MT
UNIT UNIT
PRICE
QUANTIT
Y
AMOUNT
BASE BID ITEM
881(1) Mobilization
AQ EA $ 1 $
253 (02)
Fabricate and Install grade control, Gabions AQ CY $ 42.5 $
607-2(1)
Fabricate and Install Steel Pipe Fencing AQ LF $ 2690 $
607-3(1) Fabricate and Install Removable Steel Pipe Fence (gate)
AQ EA $ 2 $
607-3(2)a Fabricate and Install Horse Gate AQ EA $ 1 $
607-3(2)b Raise/Reset Existing Horse Gate AQ EA $ 2 $
619 (01) Fabricate and Install Wire Fencing AQ LF $ 13085 $
633(1) Sign & Post*
* Signs are provided by FS; contractor provides 1 "Private Property" sign.
AQ EA $
38 $
819 (1) Riprap boulders 30" - 34" AQ T $ 484.25 $
836-8 (1) Route Decommission (Ripping)
AQ MILE $ 3.06 $
836-8 (2) Route Decommission (Slashing)
AQ MILE $ 8.42 $
836-8(3) Route Decommission (Chunking)
AQ MILE $ 16.35 $
836-8(4) Route Decommission (Re-contouring) AQ MILE $ 2.13 $
REPLACEMENT Page 25 of 42
RFQ 12912819Q0012
UNAUTHORIZED ROUTE DECOMMISSIONING
CLEVELAND NATIONAL FOREST
US FOREST SERVICE
SECTION E
CONTRACT DOCUMENTS, EXHIBITS, AND ATTACHMENTS
NUMBER
TITLE PAGES
1 Specifications
2 Drawings
3 Maps
4 Tables – Work Summary
5 Restoration / Decommissioning Methods
6 Fire Plan
SCA Wage Determination no. 2015-5636 revision no. 10 dated 12/26/2018 – San Diego County
SCA Wage Determination no. 2015-5629 revision no. 9 dated 12/26/2018 – Riverside County
9 DOL Construction Wage Determination (Davis-Bacon)
CA190001 05/03/2019 CA1
San Diego County
10 DOL Construction Wage Determination (Davis-Bacon)
CA190025 05/03/2019 CA25
Riverside County
| A5 SF30 |
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14. |
| a) This amendment is for the purpose of providing response to RFI 61 and clarifies previous response to RFI 43, 46, and 56. |
| See continuation pages. |
| b) This amendment includes RFP replacement pages 4 and 25 and new RFP attachments no. 9 and 10. |
| A5 CONTINUATION - RFISs 61 |
| A5 REPLACEMENT PAGES |
| AMENDMENT 5 REPLACEMENT PAGES |