RFIs 09182023.docx
DOCX document 25 KB Posted
- Attached to
- Effluent Decontamination System, Maryland Federal contract opportunity
- Solicitation number
- 12639523R0018
About this file
This document contains responses to requests for information (RFIs) related to a federal solicitation for an effluent decontamination system in Maryland. The solicitation is issued by the Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services for a project that involves both a new permanent EDS and a temporary EDS solution during construction. The RFI responses confirm that the existing waste pumping station rails can be reused for new pumps. For the temporary EDS, attached documents include specifications for the temporary piping, valves, fittings and related drawings and process and instrumentation diagrams. The contractor is responsible for outside piping to and from the temporary system while the onsite Biosafe contractor will assist with decommissioning and removal of the temporary internal system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Pre-proposal RFIs - 230905.pdf | ||
| 12639523R0018-0003.pdf | ||
| Series50M76.pdf | ||
| Gate Valve 35114.pdf | ||
| SeriesN66.pdf | ||
| actuated and manual ball valves series 50.pdf | ||
| Amendment 0002_specs.pdf | ||
| RFIs_responses.docx | DOCX document | |
| Site visit attendance.pdf | ||
| 12639523R0018-0001.pdf | ||
| Amendment 0001_drawings.pdf | ||
| Atch 5_construction wage rates_PG County.pdf | ||
| Atch 4_Project Cut Sheets_Spare Parts.pdf | ||
| Atch 3_Final Design Drawings.pdf | ||
| Atch 2_Final Specs.pdf | ||
| Atch 1_Final SOW.doc | DOC document | |
| 12639523R0018.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional RFIs
1. We can find no requirement to install new waste pumping station rails for service of new pumps. We assume that existing rails will be reused with the new pumps. Please confirm. CONFIRMED
Temporary System Incomplete Solution / Design RFI Questions
1. Given that there is no design on the temporary EDS solution is this part of the project to be design / build? If so, please confirm if full design / build of the temporary solution is to be priced as part of this project? If the temporary EDS solution is not to be design / build, are there forthcoming design documents for this solution? If design drawing for the temporary solution are forthcoming, should the contractor provide an allowance with clarifications at this time and adjust upon forthcoming completed design? Specific ties and location for tie ins need to be provided for diversion and processing of existing effluent as well as electrical power connection and make-up water. Also, specifications need to be provided for all temporary pipe, valves, and fittings. SEE ATTACHED
1. Who is to clean the temporary system once we are done using it for the project? BIOSAFE will assist with getting the temp system internal decommissioned and ready to move off site when complete.
1. See attached spec for a temp system as well as drawings and PID.
1. outside piping (to and from temp) will be by the onsite contractor.