Q and A Fishlake NF Supervisory Office 5.18.22.docx

DOCX document 15 KB Posted

Attached to
FISHLAKE SUPERVISOR’S OFFICE RENNOVATIONS
Solicitation number
1240LT22R0035
Issued by

About this file

This document contains questions and answers regarding a renovation project for the Fishlake National Forest Supervisory Office. Ceramic floor tile and 6-inch coved base will be installed in the east vestibule, reception area, secure sales area, hall 07, breakroom, and toilet rooms, as shown on floorplan A1.03. Rubber base corners may be formed on site. Laminate vinyl plank flooring will not be used in these areas as previously indicated in the finish schedule.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fishlake NF Supervisory Office Remodel Responses to questions 5/18/2022

· Question: Rubber toe / base. The documentation states that forming corners on site is acceptable. Then later in the installation portion of the spec it talks about how to install the preformed corners. Should the rubber base corners be preformed or formed on site?

Answer: Rubber base corners may be formed on site.

· Question: The finish schedule states LVP flooring for the Reception Area, East Vestibule, Secure sales, and Breakroom. The plans show ceramic tile. Would you like us to bid using tile or LVP? If the answer is to use LVP flooring, the base that is called out in the finish schedule for that area is ceramic tile. If we switch to LVP, should we also switch the base to rubber?

Answer: Provide ceramic floor tile and 6” coved base as shown in the finish floorplan A1.03 in the in the east vestibule, reception, secure sales, hall 07, breakroom and toilet rooms.