Schedule of Items.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Dale Water-Wastewater System Decommission Federal contract opportunity
- Solicitation number
- 1204M320Q0008
About this file
This document includes a schedule of items and specifications for a federal contract opportunity to decommission the Dale Water-Wastewater System. The contract involves clearing and grubbing, demolition and removal of existing buildings, excavation and haul to waste, embankment and haul and placement of approved backfill material, associated erosion and sediment control, and decommission of all associated water system components and wastewater system components. Key tasks include general erosion control, building demolition, utility service decommission, water/wastewater conveyance demolition, lagoon demolition and land application, and an optional task to excavate and dispose of soil below the lagoon liner if requested by the Oregon Department of Environmental Quality. The solicitation for this project is scheduled to be posted on or about January 15, 2020. The project location is in the Umatilla National Forest. Contractors must furnish all labor, equipment, materials, and incidentals to complete the work beginning around May 15, 2020. The NAICS code is 238910 with a size standard of $16.5 million, and the project is set aside 100% for small business. The contracting agency is the US Department of Agriculture Forest Service Pacific Northwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final Amendment 03.pdf | ||
| Final Amendment 02.pdf | ||
| Final Amendment 01.pdf | ||
| FINAL Performance_Spec_Decommission_lagoon_bid_items 5.0 and 6.0.pdf | ||
| FINAL CLOSURE PLAN.pdf | ||
| 11847 Asbestos Report 1993.pdf | ||
| FINAL SPECIFICATIONSDaleWaterWastewaterDemo.pdf | ||
| 1980 Original Lagoon Installatoin Specs.pdf | ||
| FinalDaleSolicitation.pdf | ||
| FireProtectionandSuppressionr6_fS_6300_52.rtf | RTF text file | |
| dale.JPG | JPG image | |
| FINAL Dale Work Center Demolition Drawings.pdf | ||
| FINAL DALE WATER-WASTEWATER PROJECT SITE MAP.pdf | ||
| DALE WATER-WASTEWATER PROJECT SITE MAP.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF ITEMS | ||||||
| BASE BID ITEMS | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL | |
| 1 | GENERAL | |||||
| 1.1 | EROSION & SEDIMENT CONTROL BMPs (BUILDING DEMOLITION) | 1 | LS | |||
| 1.2 | SWPPP & EROSION & SEDIMENT CONTROL BMPs (LAGOON DEMOLITION) | 1 | LS | |||
| 2 | UTILITY BUILDING DEMOLITION | |||||
| 2.1 | STRUCTURAL, MECHANICAL, ELECTRICAL, CHEMICAL | 1 | LS | |||
| 2.3 | VAULTS (HOLDING, OVERFLOW, SETTLING TANKS) | 1 | LS | |||
| 2.2 | FENCE | 1 | LS | |||
| 2.3 | ELECTRIC VAULT | 1 | LS | |||
| 2.4 | DEBRIS TRANSPORT & DISPOSAL | 1 | LS | |||
| 2.5 | GRADING & REVEGETATION | 1 | LS | |||
| 2.6 | ASBESTOS ABATEMENT | 1 | LS | |||
| 2.7 | REMOVE AND DISPOSE OF PHONE PEDESTALS | 1 | LS | |||
| 2.8 | REMOVE AND DISPOSE OF CONCRETE CURBING | 1 | LS | |||
| 3 | UTILTY SERVICE DECOMMISSION (VARIOUS BUILDINGS) | |||||
| 3.1 | WATER SERVICE DECOM. | 1 | LS | |||
| 3.2 | SEWER SERVICE DECOM. | 1 | LS | |||
| 3.3 | CLEAN-OUT DECOM. | 1 | LS | |||
| 3.4 | DEBRIS TRANSPORT & DISPOSAL | 1 | LS | |||
| 3.5 | GRADING & REVEGETATION | 1 | LS | |||
| 4 | WATER/WASTEWATER CONVEYANCE DEMOLITION | |||||
| 4.1 | SEWER LINE ABANDONMENT (PLUG & CAP) | 1 | LS | |||
| 4.2 | WATER LINE ABANDONMENT (PLUG & CAP) | 1 | LS | |||
| 4.3 | VALVE DECOMMISSION | 1 | LS | |||
| 4.4 | FIRE HYDRANT DEMOLITION | 1 | LS | |||
| 4.5 | MANHOLE ABANDONMENT (<8-FT DEEP) | 1 | LS | |||
| 4.6 | MANHOLE ABANDONMENT (>8-FT DEEP) | 1 | LS | |||
| 4.7 | MANHOLE DEMOLITION | 1 | LS | |||
| 4.8 | CATCH BASIN DEMOLITION | 1 | LS | |||
| 4.9 | 60,000 GAL WATER TANK | 1 | LS | |||
| 4.1 | RIVER INTAKE MANWAY | 1 | LS | |||
| 4.11 | RIVER INTAKE VALVE BOX | 1 | LS | |||
| 4.12 | DEBRIS TRANSPORT & DISPOSAL | 1 | LS | |||
| 4.13 | WASHPAD/OIL-WATER SEPARATOR/PRV STATION | 1 | LS | |||
| 4.14 | GRADING & REVEGETATION | 1 | LS | |||
| 5 | LAGOON DEMOLITION/LAND APPLICATION | |||||
| 5.1 | DEMO. VALVE VAULT | 1 | LS | |||
| 5.2 | DEMO. WINCHES | 1 | LS | |||
| 5.3 | PVC SPRINKLER SYSTEM DECOM. | 1 | LS | |||
| 5.4 | GALVANIZED SPRINKLER SYSTEM DECOM. | 1 | LS | |||
| 5.5 | DEMO DISPOSAL BLDG (INCL. TANK & DRYWELL) | 1 | LS | |||
| 5.6 | RIPRAP OUTLET DECOM. | 1 | LS | |||
| 5.7 | DEMO. LAGOON INLET/OUTLET STRUCTURES | 1 | LS | |||
| 5.8 | DEMO. LINER COVER | 1 | LS | |||
| 5.9 | DEMO. LINER | 1 | LS | |||
| 5.1 | RIVER CROSSING (PIPE/CABLE/ABUTMENTS) | 1 | LS | |||
| 5.11 | DEBRIS TRANSPORT & DISPOSAL | 1 | LS | |||
| 5.12 | GRADING & REVEGETATION | 1 | LS | |||
| 5.13 | AGITATOR | 1 | LS | |||
| 5.14 | PUMP | 1 | LS | |||
| 5.15 | IRRIGATION LINE | 1 | LS | |||
| 5.16 | FLEX HOSE | 1 | LS | |||
| 5.17 | LAND APPLICATION OVERSIGHT | 1 | LS |
OPTIONAL BID ITEMS DESCRIPTION QTY UNIT UNIT PRICE TOTAL
| 6 | OPTIONAL TASK - EXCAVATE & DISPOSE OF SOIL BELOW LINER | 3,232 | CY |
| Notes: | |||
| Optional Task to excavate and dispose of soil below the lagoon liner to be executed if requested by the Oregon Department of Environmental Quality (ODEQ). |