This document contains an amendment to a federal solicitation and related pre-bid questions and answers. The amendment addresses pre-bid inquiries for a contract to decommission the Dale Water-Wastewater System located on the Umatilla National Forest in Oregon. Work includes clearing, demolition of buildings, excavation, hauling waste materials, embankment construction, utility decommissioning, and decommissioning all water and wastewater system components. Contractors must provide licensed wastewater treatment operators, and track and report biosolids and recycled water application rates. The estimated start date is May 15, 2020. The solicitation for this project will be posted on or around January 15, 2020. The NAICS code is 238910 with a size standard of $16.5 million, and the project is set aside 100% for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Schedule of Items.xlsx | XLSX spreadsheet | |
| Final Amendment 02.pdf | ||
| Final Amendment 01.pdf | ||
| FINAL DALE WATER-WASTEWATER PROJECT SITE MAP.pdf | ||
| FINAL Performance_Spec_Decommission_lagoon_bid_items 5.0 and 6.0.pdf | ||
| FINAL CLOSURE PLAN.pdf | ||
| 11847 Asbestos Report 1993.pdf | ||
| FINAL SPECIFICATIONSDaleWaterWastewaterDemo.pdf | ||
| 1980 Original Lagoon Installatoin Specs.pdf | ||
| FinalDaleSolicitation.pdf | ||
| FireProtectionandSuppressionr6_fS_6300_52.rtf | RTF text file | |
| dale.JPG | JPG image | |
| FINAL Dale Work Center Demolition Drawings.pdf | ||
| DALE WATER-WASTEWATER PROJECT SITE MAP.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE PAGE 1 OF 2 PAGES
2 AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
05/11/2020
4. REQUISITION/PUCHASE REQ. NO. 5. PROJECT NO.(IF APPLICABLE)
6. ISSUE BY CODE 7.ADMINISTERED BY (if other than item 6) CODE
Wallowa-Whitman National Forest 1550 Dewey Ave, Suite A Baker City, OR 97814
8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) 9A.Amend Solicitation. 1204M320Q0008
* 9B.Dated 04/07/2020
* 10A.Mod Contract/Order #
* 10B.Dated (see Item 13) code facility code
11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION
[x] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [x ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to; (specifiy authority)
The changes set forth in item 14 are made in the Contract/Order # in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..
C. This supplemental agreement is entered into pursuant to authority of:
D Other: (Specify type of modification and authority):
E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Project Name and Location: Dale Water-Wastewater System Decommission This amendment addresses the following (see attached addendum)
1. Pre-Bid Inquiries (PBI’s) for Contract Bidding (see attached addendum)
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A.NAME AND TITLE OF SIGNER (Type or print)
16A.NAME AND TITLE OF CONTRACTING OFFICER
Contracting Officer
15B.CONTRACTOR/OFFEROR
By ______________________________ (Signature of person authorized to sign)
15C.DATE SIGNED 16B.UNITED STATES OF AMERICA
By______________________________ (Signature of Contracting Officer)
16C.DATE SIGNED
Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243
Addendum to Amendment 3
REVISIONS, PRE-BID INQUIRIES, REQUEST FOR INFORMATION DALE DECOMMISSION
REVISIONS
Revision-002- NONE
Pre-Bid Inquiries (PBI’s) for Contract Bidding
PBI-022
Question: If the irrigation mainline pipe size was increased, to a 4” or 6” mainline, and increased size of branched pipe/hose stemming from the mainline pipe to the irrigation guns, it would allow for increased flows (GPM) allowing contractor to use multiple irrigation guns at the same time. The irrigation guns would be operated in separate locations. For example, contractor may have one gun on the south, and one gun on the north of the mainline (in designated/specified gun stations) operating simultaneously. Instead of pumping roughly 100GPM, we would pump roughly 200 GPM which would be split between two irrigation guns (example ~ 100GPM per irrigation gun).
- Having ~ two separate irrigation guns operating simultaneously, hydraulic loading rates would be tracked based on primary flow rates coming from the flow valve and specified hose end PSI which would then be tracked per designated gun locations.
- Timing at one sprinkler location will be calibrated based on the site conditions and soil permeability, and sprinklers will be moved accordingly, as the same when using one sprinkler gun.
If contractor was to use one gun based on 100GPM = 6,000 gallons per hour.
If contractor was to use two guns based on 200GPM = 12,000 gallons per hour.
**contractor may not need to, or plan to, utilize both irrigation guns at all times but this basically increases gallons applied per hour, reduces time on job site, gives the contractor a buffer option, and would reduce costs.
Answer: Yes, the Forest Service does not see any problems with using a larger mainline and two guns, provided 1) the pump can handle it, 2) contractor tracks the amount applied to each area each day, and 3) contractor follows the loading/application rates stated in the approved plan.
PBI-023
Question: I have a question on drawing number C301 # 3 general notes it says 16,500 cubic feet of biosoilds. I did some math and I came up with a higher number.. Can you give me clarification on this volume.
Answer: Contractors shall utilize the volumes listed in General Note 3 of Sheet C301 of the project drawings for their estimate.
PBI-024
Question: I am just wanting to make perfectly clear that we (the contractor) must provide a certified wastewater treatment licensed operator to oversee the land application?
Answer: Yes, the contractor must provide a DEQ-certified wastewater treatment plant operator to oversee the land application. The operator does not need to be onsite the entire time, but he/she must be able to provide enough oversight to ensure that the approved biosolids management plan and recycled water use plan are being followed, and should be involved with preparation of the land application rate information the USFS is required to submit to DEQ.
PBI-024
Question: Are technical and price proposals required to be emailed?
Answer: Yes, bids shall be emailed electronically to bryce.kamerdula@usda.gov (i) 1 electronic copy of the complete sign offer and business proposal (Signed 1449, Schedule of Items, and Reps and Certs of the solicitatin package, (ii) 1 electronic copy of the technical proposal. Each document shall be a separate attachment.
Requests for Information (RFI’s) for Plans and Specifications
None mailto:bryce.kamerdula@usda.gov