FinalDaleSolicitation.pdf
PDF 915 KB Posted
- Attached to
- Dale Water-Wastewater System Decommission Federal contract opportunity
- Solicitation number
- 1204M320Q0008
About this file
This federal solicitation seeks demolition and decommissioning services for a water and wastewater system. Contractors must remove existing buildings, excavate and dispose of materials, decommission utilities and water system components, and complete erosion control and revegetation. The project is located in Dale, Oregon. The solicitation will be posted on January 15, 2020, with an estimated start date of May 15 for the work. The point of contact is Shaun Oliver at 541-278-3957. The NAICS code is 238910 with a size standard of $16.5 million. This opportunity is set aside 100% for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final Amendment 03.pdf | ||
| Schedule of Items.xlsx | XLSX spreadsheet | |
| Final Amendment 02.pdf | ||
| Final Amendment 01.pdf | ||
| FINAL Performance_Spec_Decommission_lagoon_bid_items 5.0 and 6.0.pdf | ||
| FINAL CLOSURE PLAN.pdf | ||
| 11847 Asbestos Report 1993.pdf | ||
| FINAL SPECIFICATIONSDaleWaterWastewaterDemo.pdf | ||
| 1980 Original Lagoon Installatoin Specs.pdf | ||
| FireProtectionandSuppressionr6_fS_6300_52.rtf | RTF text file | |
| dale.JPG | JPG image | |
| FINAL Dale Work Center Demolition Drawings.pdf | ||
| FINAL DALE WATER-WASTEWATER PROJECT SITE MAP.pdf | ||
| DALE WATER-WASTEWATER PROJECT SITE MAP.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
6. SOLICITATION ISSUE DATE
April 07, 2020
7. FOR SOLICITATION
INFORMATION CALL
a. NAME
Bryce Kamerdula- Administrative Shaun Oliver- Technical
b. TELEPHONE NO. (No collect calls)
541 523-1209 541 278-3957
8. OFFER DUE DATE/LOCAL TIME
May 12, 2020 PST 4:30pm
9. ISSUED BY CODE
10. THIS ACQUISITION IS 11. DELIVERY FOR FOB 12. DISCOUNT TERMS
Wallowa-Whitman National Forest 1550 Dewey Ave, Suite A Baker City, OR 97814
UNRESTRICTED
SET ASIDE: 100 % FOR
SMALL BUSINESS
DESTINATION UNLESS
BLOCK IS MARKED
SEE SCHEDULE
SMALL DISADV.
BUSINESS
13a. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
8(A) 13b. RATING
NAICS: 238910
SIZE STD:$16.5 million
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE
16. ADMINISTERED BY CODE
Wallowa-Whitman National Forest Wallowa-Whitman National Forest
17a. CONTRACTOR/ CODE
OFFEROR FACILITY
CODE 18a. PAYMENT WILL BE MADE BY CODE
INVOICE PROCESSING PLATFORM (IPP)
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS
BLOCK BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN __ __
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REFERENCE _____________OFFER DATED
______________. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)
31c. DATE SIGNED
32a. QUANTITY IN COLUMN 21 HAS BEEN
ACCEPTED, AND CONFORMS TO THE
33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED
CORRECT FOR
RECEIVED INSPECTED CONTRACT, EXCEPT AS NOTED PARTIAL
36. PAYMENT 37. CHECK NUMBER
32b. SIGNATURE OF AUTHORIZED GOVT REPRESENTATIVE 32c. DATE COMPLETE PARTIAL
38. S/R ACCOUNT NO.
39. S/R VOUCHER NO.
40. PAID By
42a. RECEIVED BY (Print) 41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42b. RECEIVED AT (Location)
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
BIOPREFERRED
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for services for which biobased products are available.
The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Hydraulic fluids Penetrating lubricants Concrete and asphalt release fluids Absorbents Diesel fuel additives Greases Dust suppressants 2-cycle engine oil Wood and concrete sealers Fertilizers Roof coatings Water tank coatings Adhesive and mastic removers Cleaners Sorbents Floor finish Floor stripper Composite panels Janitorial supplies Insulating foam Sealers Carpet Metalworking fluids Graffiti and grease removers Stain removers Degreasers De-icers
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content. In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other biobased products.
The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of the contract.
Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
SCHEDULE OF ITEMS
BASE BID ITEMS DESCRIPTION QTY UNIT UNIT PRICE TOTAL
1 GENERAL
1.1 EROSION & SEDIMENT CONTROL BMPs (BUILDING DEMOLITION) 1 LS
1.2 SWPPP & EROSION & SEDIMENT CONTROL BMPs (LAGOON DEMOLITION) 1 LS
2 UTILITY BUILDING DEMOLITION
2.1 STRUCTURAL, MECHANICAL, ELECTRICAL, CHEMICAL 1 LS
2.3 VAULTS (HOLDING, OVERFLOW, SETTLING TANKS) 1 LS
2.2 FENCE 1 LS
2.3 ELECTRIC VAULT 1 LS
2.4 DEBRIS TRANSPORT & DISPOSAL 1 LS
2.5 GRADING & REVEGETATION 1 LS
2.6 ASBESTOS ABATEMENT 1 LS
2.7 REMOVE AND DISPOSE OF PHONE PEDESTALS 1 LS
2.8 REMOVE AND DISPOSE OF CONCRETE CURBING 1 LS
3 UTILTY SERVICE DECOMMISSION (VARIOUS BUILDINGS)
3.1 WATER SERVICE DECOM. 1 LS
3.2 SEWER SERVICE DECOM. 1 LS
3.3 CLEAN-OUT DECOM. 1 LS
3.4 DEBRIS TRANSPORT & DISPOSAL 1 LS
3.5 GRADING & REVEGETATION 1 LS
4 WATER/WASTEWATER CONVEYANCE DEMOLITION
4.1 SEWER LINE ABANDONMENT (PLUG & CAP) 1 LS
4.2 WATER LINE ABANDONMENT (PLUG & CAP) 1 LS
4.3 VALVE DECOMMISSION 1 LS
4.4 FIRE HYDRANT DEMOLITION 1 LS
4.5 MANHOLE ABANDONMENT (<8-FT DEEP) 1 LS
4.6 MANHOLE ABANDONMENT (>8-FT DEEP) 1 LS
4.7 MANHOLE DEMOLITION 1 LS
4.8 CATCH BASIN DEMOLITION 1 LS
4.9 60,000 GAL WATER TANK 1 LS
4.10 RIVER INTAKE MANWAY 1 LS
4.11 RIVER INTAKE VALVE BOX 1 LS
4.12 DEBRIS TRANSPORT & DISPOSAL 1 LS
4.13 WASHPAD/OIL-WATER SEPARATOR/PRV STATION 1 LS
4.14 GRADING & REVEGETATION 1 LS
5 LAGOON DEMOLITION/LAND APPLICATION
5.1 DEMO. VALVE VAULT 1 LS
5.2 DEMO. WINCHES 1 LS
5.3 PVC SPRINKLER SYSTEM DECOM. 1 LS
5.4 GALVANIZED SPRINKLER SYSTEM DECOM. 1 LS
5.5 DEMO DISPOSAL BLDG (INCL. TANK & DRYWELL) 1 LS
5.6 RIPRAP OUTLET DECOM. 1 LS
5.7 DEMO. LAGOON INLET/OUTLET STRUCTURES 1 LS
5.8 DEMO. LINER COVER 1 LS
5.9 DEMO. LINER 1 LS
5.10 RIVER CROSSING (PIPE/CABLE/ABUTMENTS) 1 LS
5.11 DEBRIS TRANSPORT & DISPOSAL 1 LS
5.12 GRADING & REVEGETATION 1 LS
5.13 AGITATOR OR OTHER DEQ APPROVED METHOD 1 LS
5.14 PUMP 1 LS
5.15 IRRIGATION LINE 1 LS
5.16 FLEX HOSE 1 LS
5.17 LAND APPLICATION OVERSIGHT (see page 43 of Closure Plan) 1 LS
OPTIONAL BID ITEMS DESCRIPTION QTY UNIT UNIT PRICE TOTAL
6 OPTIONAL TASK - EXCAVATE & DISPOSE OF SOIL BELOW LINER 3,232 CY
Notes:
Optional Task to excavate and dispose of soil below the lagoon liner to be executed if requested by the Oregon
Department of Environmental Quality (ODEQ).
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or performance of nonconforming services at no increase in contract price. If repair/replacement or performance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on
Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii)Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B)If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1048610 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1063244 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1050674 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i1050705
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.3903) and Office of Management and
Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.-
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate
EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if–
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv)If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_212_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/part-33-protests-disputes-and-appeals#i1080268 https://www.acquisition.gov/content/part-32-contract-financing#i1081898
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the
Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b.
destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government
Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
https://www.acquisition.gov/content/part-32-contract-financing#i1081962 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_212_5
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t)[Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any
End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
ADDENDUM TO FAR 52.212-4 The following clauses are hereby incorporated by reference or full text as appropriate:
PROJECT DESCRIPTION
The Dale Water-Wastewater System Decommission project consists of clearing and grubbing, demolition and removal of existing buildings, excavation, haul to waste, embankment, haul and placement of approved backfill material, associated erosion and sediment control, decommission of associated utilities, decommission of all associated water system components and wastewater system components.
Contractor shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract.
PROJECT LOCATION
This project is located in the Umatilla National Forest on the North Fork John Day Ranger District.
Dale Compound Hwy 395 Dale, Oregon 97880 16 miles south of Ukiah on the left.
SITE VISIT –Note: Contractor’s that want to visit or attend the site visit shall contact the contracting officer for COVID –19 Travel Authorization.
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
(a) An organized site visit has been scheduled for: April 23, 2020 at 10:00pm PST
(b) Participants will meet at: Dale Compound Site https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
Requirements of all equipment:
1. All equipment and vehicles to be used at the job site shall be cleaned and free of invasive species (noxious weeds), seeds, external grease and oil and shall be inspected prior to entrance onto Federal lands. The restriction shall include equipment and vehicles intended for off-road use as well as on road use, whether they are owned, leased, or borrowed by the Contractor or Subcontractor.
2. All protective plating and armoring shall be intact and properly functioning on the equipment to reduce the potential for damaging hydraulic hoses or the undercarriage.
3. Spill kit approved by OSHA for petroleum product leaks will be on site at all times.
SPECIFICATIONS
General specifications for each Contract Scope individually described by an item number in the Schedule of Service Items can be found in the solicitation, project drawings, closure plan, and specifications).
PERFORMANCE REQUIREMENTS
All work shall be performed in accordance with the attached performance based standard specifications unless otherwise specified in a call order.
Acceptable Quality Levels (AQLs) for each performance standard are also established in the attached documents. AQLs may vary between forests. These AQLs will apply to all ordered work unless otherwise specified in a call order.
The attached performance standards, typical drawings, and AQLs are part of this solicitation and any resulting contract.
CONTRACTOR QUALITY CONTROL INSPECTION
When requested by the Contracting Officer, the successful Contractor(s) shall provide a written Quality Control Plan satisfactory to the Government describing how the Contractor will control work quality and document inspection results for awarded solicitation.
Contractor shall conduct ongoing quality control inspections in accordance with the approved plan. Contractor shall also provide written certification for all invoiced work that was accomplished in accordance with the terms and conditions of the contract.
Inspection shall be maintained concurrent with contract work. Contractor inspection results shall be available to the Contracting Officer at all times
GOVERNMENT QUALITY ASSURANCE
Government Quality Assurance Plan
The Government may make periodic inspections while work is in progress. After completion of a pay item, the Government may also inspect to determine compliance with performance standards and acceptable quality levels. Determination of the acceptability of the work performed will be based on these verification inspections and will be considered conclusive.
Acceptance and Payment
Acceptance will be based on visual inspection of pay items or measurement and payment within the specifications. If inspection finds that Acceptable Quality Levels for any Performance Standard is not met, rework will be required.
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all Contractor's rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
PERFORMANCE WORK STATEMENT
MEASUREMENT AND PAYMENT
1) All measurements and payments are as defined in the Specifications (as included elsewhere in this document), or on the specifications provided within the individual line item(s).
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than June 15, 2020 for line items 2.0, 3.0, 4.0 and October 31, 2020 for Line Items 5.0 and 6.0. The time stated for completion shall include final cleanup of the premises.
Work is estimated to begin: May 18, 2020.
The maximum work week that will be approved is Monday thru Friday (daylight to dust), or weekends if approved by the Contracting Officer. Any excess hours worked over 40 hours, employees are required to be paid at least 1 and ½ times the basic rate of pay.
AGAR 452.228-71 INSURANCE COVERAGE (NOV 1996)
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
Performance Work Statement
PERFORMANCE
INDICATORS
PERFORMANCE
STANDARD
(Acceptable Quality Level)
(AQL)
GOVERNMENT
QUALITY ASSURANCE
PLAN
(QAP)
EFFECT OF NOT
MEETING
PERFORMANCE
STANDARD
Perform demolition of buildings in accordance with the CSI Specifications, Closure Plan, and Project Drawings. Line Items # 2.0, 3.0, and 4.0
100% adherence to Closure Plan, Drawings, and DEQ permit requirements.
Govt. will monitor demolition activities by visually inspection and specifications.
No payment for Project Units with less than AQL.
Rework at no additional cost to the Government
Perform decommissioning of wastewater system in accordance with Specifications, Project Drawings, and Closure Plan Line Items # 5.0 and 6.0
100% adherence to Closure Plan, Drawings, and DEQ permit requirements.
Govt. will monitor decommissioning activities through visual inspection and specifications.
No payment for Project Units with less than AQL.
Rework at no additional cost to the Government
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy.
The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
FINAL PAYMENT - RELEASE OF CLAIMS
The Government shall pay the amount due the Contractor under this contract after—
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.
AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be held with each individual vendor upon successful award of first BPA call and prior to performance. The conference will be held at the Forest Service Office designated in the BPA call, and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans.
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract. See specifications for Government Furnished Property. (see table)
APPROVAL OF SUBCONTRACTING
The Contractor shall request approval from the Contracting Officer prior to entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:
A. The name, address and telephone number of the subcontractor.
B. The date upon which the subcontract was entered into and its duration
C. A detailed description of the work being subcontracted including a listing of contract items units, etc., as appropriate.
D. Documentation of the subcontractor's representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
FAR 52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by NONE
(a) Weather conditions (Spring and Summer Conditions)
(b) Transportation facilities NONE
(c) Elevation: 2940’ Dale Work Center
(d) Utility Services: NONE
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
AGAR 452.237-74 KEY PERSONNEL (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
Overall Project Manager Qualified Operator - The government reserves the right to request a new operator for any of the equipment, if that operator is not capable of performing work in a safe, efficient, and proficient level.
Individual Sub-Managers – Individuals supervising individual sub-contracts for work items not covered by personnel noted previously herein.
(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 5 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 5 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
Landscape Preservation
A.The Contractor shall confine operations to within the construction limits or other areas designated in contract documents, and prevent the depositing of debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.
USE OF PREMISES
The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
Before any camp is opened or operated on National Forest land or lands administered by the Forest Service, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor. Such permission, if granted, will be without charge to the Contractor.
The Contractor shall request permission (in writing) from the appropriate Ranger District to use campsites. If permission is granted, the District Ranger's letter shall specify all conditions and requirements.
It is further stipulated that in addition to clean-up of any camp sites, the Contractor is required to remove all his equipment from National Forest land before final acceptance and payment of the project.
Portable chemical toilets, self-contained holding tanks, approved pit or vault toilets which meet State Code are required.
AGAR 452.236-74 CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION (NOV 1996)
A. Safety/ Pollution/ Erosion Control Plan. The contractor would be required to have a written plan which describes measures to prevent or reduce impacts from potential spills (fuel, hydraulic fluid, etc.) The plan should contain a description of the hazardous materials that would be used, including inventory, storage, handling procedures; a description of quick response containment supplies that would be available on the site (e.g. a silt fence, straw bales, oil-absorbing pads, floating boom whenever surface water is present).
B. Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
C. An environmentally compatible hydraulic fluid shall be used during project operations. “In-stream Work”
D. Mechanized equipment shall have the appropriate spill containment equipment.
E. Staging areas would be designated as far as possible from streams (because of the drawbottom road and confined canyon, a staging area of 300’ slope distance will not always be possible to achieve). These staging areas would be used for fueling, equipment storage, and maintenance.
F. All equipment used for instream work shall be cleaned and leaks repaired prior to entering the project area. External oil and grease, along with dirt and mud would be removed prior to construction operations. Thereafter, equipment would be inspected daily for leaks or accumulation of grease, and fix any identified problems before entering streams or areas that drain directly into streams or wetlands.
G. The time that heavy equipment is in stream channels would be minimized as much as possible. Mitigation would include using chokers and block and tackle to move logs into place instead of entering the stream, when possible.
SANITATION AND SERVICING
Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor's operations. If facilities for employees are established on Contract Area, they shall be operated in a sanitary manner. Contractor shall not service tractors, trucks, or other equipment on National Forest lands where servicing is likely to result in pollution to soil or water. Contractor shall remove from National Forest lands all refuse resulting from use, servicing, repair, or abandonment of equipment. In the event that Contractor's operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup to restore the polluted site to the satisfaction of the Forest Service.
PREVENTION OF OIL SPILLS
If Contractor maintains storage facilities for oil or oil products on Contract Area, Contractor shall take appropriate preventive measures to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.
If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
NOXIOUS WEED CONTROL
(1) In order to prevent the potential spread of noxious weeds onto National Forest lands, the Contractor shall be required to furnish the Forest Service with proof of weed-free equipment.
(2) Noxious weeds are defined as any exotic plant species established or that may be introduced in the State, which may render the land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the Oregon Department of Agriculture or the local counties vendor is operating in, or by other appropriate agencies having jurisdiction.
(3) All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use, as well as on road use, whether they are owned, leased, or borrowed by the Contractor or subcontractor.
(4) Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds.
This may require the use of a pressure hose. Cleaning shall occur off Federal lands.
(5) Equipment, materials and vehicles shall be visually inspected by a designated Forest Service Officer, and certified in writing to be reasonably clean and weed free (use Equipment Cleaning Inspection/Verification Form). Inspections will take place at a location designated by the Forest Officer in advance of equipment and material arrival. Equipment and vehicles are expected to proceed directly to the job site following the inspection.
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Name of Contractor, subcontractor, supplier, and manufacturer.
4. Specification section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor's stamp, initial or signature, certifying the review of the submittal, verification of field measurements and compliance with contract documents.
SUBMITTALS, SHOP DRAWINGS, MATERIAL CERTIFICATIONS AND TESTING REPORTS
Submittals Referenced by
Specification No.
Time of Government Approval After Submittal
Number of Sets
Traffic Control Plan FSSS 156 & Traffic Control Clause
1 Week 1
Safety Plan Safety Clause 1 Week 1 Hazardous Spill Plan Closure Plan, FAR
52.223-3 & FSSS 107
1 Week 1
Fire Plan Section J List of Attachments
1 Week 1
Contractor Quality Control Plan Closure Plan 1 Week 1 Erosion Control Plan Closure Plan 1 Week 1 Copy of Required Insurance Coverage
Prior to Work Starting 1
Schedule of Work Submit with your quote 1 Notification of Subcontracting Prior to Subcontractor
Starting Work
Camping Permit Before Camping 1 Biosolids land application report OAR 340-050-0035 Prior to Final Payment 1 Release of Claims Form Prior to Final Payment 1
Shop Drawings The following shop drawings shall be submitted on this project:
Title Referenced By
Specification No.
Time of Government Approval after Submittal
N/A
Material Certifications and Testing Reports The following material certifications and/or testing reports shall be submitted on this project:
Title Referenced by Specification No.
Government Furnished Property
Item No. Property Description
Property Value Qty Location Date Available
Asbestos Summary
Dale Utility Building
Issued with Solicitation
Dale Water-Wastewater System Decommission Solicitation #1204M320Q0008
PRODUCT SUBSTITUTION
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitution will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
Submit separate request for each substitution on an approved form. Support each request with:
1. Complete data substantiating compliance of proposed substitution with requirements stated in contract documents:
a. Product identification, including manufacturer's name and address.
b. Manufacturer's literature; identify:
1) Product description
2) Reference standards
3) Performance and test data A. In making formal request for substitution the Contractor represents he/she:
1. Have investigated proposed product and determined that it is equal to or superior in all respects to that originally specified.
2. Will provide same warranties and bond for substitute as for originally specified product.
3. Will coordinate installation of accepted substitution into the work, and will make such changes as may be required for the work to be complete in all respects.
4. Will waive claims for additional costs caused by substitution, which may subsequently become apparent.
5. Cost data is complete and includes related costs under the contract, but not:
a. Costs under separate contracts.
b. Contracting Officer costs for redesign or revision of contract documents.
B. The Contractor assumes full responsibility that the substitution and/or alternate items or procedures proposed will meet the job requirements.
C. The Contractor is solely responsible for the cost of redesign and modifications to this and other parts of the work caused by the substitutions or alternates furnished.
SALVAGE RIGHTS
Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
MOISTURE SENSITIVE SOILS
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .