This is a Scope of Work document for a road improvement project in Florida, specifically for the Rainbow Lakes Estates community. The project involves the reclamation and widening of SW Ivy Place roadway from an existing 18-foot pavement width to 20 feet, as detailed in the Rainbow Lakes Estates Ivy Place Road Improvement Plans. Work scope includes clearing and grubbing, importing limerock to establish proper 2% roadway slope, regrading of high shoulders and swales, sodding of both shoulders and roadside right-of-way areas, and thermoplastic striping. Additionally, the project encompasses excavation and grading of a swale approximately 250 feet long by 23 feet wide by 1.5 feet deep in the drainage area at 20154 SW Rainbow Lakes Boulevard, including excavation, rough grading, ditchblocks, dirt berm installation along the property line, finish grading, and sodding. The contract term is 120 calendar days from the date of Notice to Proceed, with all work except thermoplastic striping required to be completed within 90 calendar days. Thermoplastic striping placement is allocated for the final 30 calendar days of the contract period. Liquidated damages will be assessed for any incomplete contract items remaining after the 120-calendar-day deadline. Site visits to the project location are highly recommended prior to bid submission.
No specific pricing terms, set-asides, incumbent information, funding sources, or response and due dates are detailed in this Scope of Work document. The document emphasizes that the Notice to Proceed will not be issued until all required documentation is received by the County.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
DESCRIPTION OF PROJECT
SW Ivy Place: Project consists of the reclamation and widening of existing roadways as shown on plans entitled Rainbow Lakes Estates Ivy Place Road Improvement Plans.
Clearing and grubbing includes road widening from existing 18’ to 20’ pavement.
Importing limerock to re-establish 2% roadway slope and widening. Miscellaneous improvements include regrading of high shoulders and swales, sodding of both shoulders, roadside right of way, and thermoplastic striping.
Drainage area: 20154 SW Rainbow Lakes Blvd.
Excavate and grade swale approximate 250’x 23’x 1.5’: Work includes excavation, rough grading, ditchblocks and dirt berm along the property line. Includes finish grading and sod.
CONTRACT TERM
This contract will be in effect for 120 calendar days from the date of the NOTICE TO PROCEED. The NOTICE TO PROCEED will not be issued until all required documentation is received by the COUNTY. The last 30 calendar days of the contract is to accommodate the placement of thermoplastic striping only. All other contract related work must be completed within 90 calendar days. Liquidated damages will begin to be imposed if there are any outstanding contract items remaining incomplete except for thermoplastic striping after 120 calendar days.
PRIOR TO SUBMITTING BID
It is in the CONTRACTOR’s best interest and highly recommended for CONTRACTOR to visit the project work location before submitting a bid.