116200_-_Vadis_Rd_Reconstruction_Book_1_Pre_Bid.pdf
PDF 485 KB Posted
- Attached to
- 116200 - 2026 Vadis Road Reconstruction Project
- Solicitation number
- 2026.058-ITB
- Issued by
- Washington County, Oregon
About this file
This is a pre-bid document package (Book 1 of 2) issued by the Washington County Department of Land Use & Transportation Operations and Maintenance in Oregon for the 2026 Vadis Road Reconstruction Project (Bid Number 2026.058-ITB, Project Number 116200). The project involves complete reconstruction of Vadis Road, including installation of new storm drainage culverts, removal of existing roadway materials and culverts, earthwork, aggregate base installation, asphalt concrete paving, roadway shoulders, driveway approaches, pavement markings, and signage installation. The scope also encompasses temporary traffic control and erosion and sediment control measures, with a full road closure anticipated for up to 28 calendar days. The document package was issued on July 6, 2026, and contains bidding forms, contract forms, performance and payment bond requirements, and references to the Oregon Standard Specifications for Construction (2024 Edition). No specific response deadline, site visit, or bidders' conference information is provided in this pre-bid document excerpt.
Contractors submitting bids must provide a bid guaranty equal to ten percent of the total bid amount and submit a First-Tier Subcontractors Disclosure Form within two work hours of the bid deadline. Contract awards will include performance and payment bonds, with the contractor required to complete all work within a specified contract time with liquidated damages assessed for delays. The contractor must maintain a one-year warranty period following written acceptance of the work and remedy all defects at no cost to Washington County. Retainage will be held at five percent of contract price, with contractors able to select from four options for retainage management, including County investment, third-party banking arrangements, cash deposit, or acceptable securities. The contract is governed by Oregon law and is binding upon execution by both parties.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE ISSUED: July 6, 2026 DOCUMENT NUMBER: __________
BOOK 1 OF 2
OF THE BID DOCUMENTS FOR:
2026 VADIS ROAD RECONSTRUCTION PROJECT
GRADING, PAVING, STRIPING & SIGNING
BID NUMBER: 2026.058-ITB
PROJECT NUMBER: 116200
A WASHINGTON COUNTY
DEPARTMENT OF LAND USE & TRANSPORTATION
OPERATIONS AND MAINTENANCE
BOOK 1 OF 2
OF THE BID DOCUMENTS
FOR:
2026 VADIS ROAD RECONSTRUCTION PROJECT
PREPARED BY:
WASHINGTON COUNTY
DEPARTMENT OF LAND USE & TRANSPORTATION
OPERATIONS AND MAINTENANCE
1400 SW WALNUT STREET, MS#51
HILLSBORO, OR 97123-5625
BID NUMBER: 2026.058-ITB
PROJECT NUMBER: 116200
DATE ISSUED: July 6, 2026
TABLE OF CONTENTS
Page
PART 1.0, BIDDING FORMS
1.10 SIGNATURE PAGE .............................................................................................. 1-1
1.20 BID GUARANTY FORM ...................................................................................... 1-3
1.30 FIRST-TIER SUBCONTRACTORS DISCLOSURE FORM ......................................... 1-5
PART 2.0, CONTRACT FORMS
2.10 CONTRACT AGREEMENT ................................................................................... 2-1
2.20 PERFORMANCE BOND ...................................................................................... 2-5
2.30 PAYMENT BOND ............................................................................................... 2-7
2.40 SELECTION OF RETAINAGE OPTION .................................................................. 2-9
PART 1.0, BIDDING FORMS
2026 Vadis Road Reconstruction Project 1-1 Project # 116200 Bid # 2026.058-ITB
1.10 SIGNATURE PAGE
In the event this Bid is accepted by the County and the undersigned fails to execute a satisfactory contract and bond in accordance with 00130.50, and after receiving written notice within ten (10) calendar days (excluding Sundays) from the date of from the date of the "Notice of Award", the County may, at its option, declare that the undersigned has abandoned the contract and thereupon this Bid shall be returned to the undersigned.
The bidder, by their signature below, hereby acknowledges that they have read the offer, understands it, and agrees be bound by its terms and conditions.
Signature of Bidder
Printed Name of Bidder
Title
Telephone Number
Fax Number
Email Address
Company Name
Street Address or mailing address if different
City, State, Zip code
Federal Tax I.D. Number
CCB License Number
Expiration Date Dated this day of , 2026
APPROVED AS TO FORM:
/s/ Cortney D. Duke-Driessen Sr. Assistant County Counsel
(06/2020)
2026 Vadis Road Reconstruction Project 1-2 Project # 116200
This page intentionally left blank.
2026 Vadis Road Reconstruction Project 1-3 Project # 116200
1.20 BID GUARANTY FORM
KNOW ALL PERSONS by these presents, that we
(Contractor), as principal and
(Surety), a corporation duly organized under the laws of the State of , having its principal place of business at
, and authorized to do business in the State of Oregon, as surety, are held and firmly bound unto Washington County, Oregon, as obligee, in the full sum of ten (10) percent of the total amount of the bid for the payment of which will and truly be made, we bind ourselves, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
NOW, THEREFORE, as the principal named below is submitting an irrevocable bid for the construction of “2026 VADIS ROAD RECONSTRUCTION PROJECT” as described in the Washington County Invitation to bid, and accompanying contract documents incorporated by reference herein, and if said bid submitted by principal is accepted by Washington County and said principal fails to execute the contract and required performance and payment bonds in accordance with 00130.50, then the Bid Guaranty shall immediately be paid to Washington County in accordance with 00130.60.
AND FURTHER, if the submitted Bid is accepted by Washington County and said principal shall enter into and execute the contract and shall furnish bonds as required by Washington County, Oregon, within the time fixed by said County, then this obligation shall be void; otherwise, to remain in full force and effect for not less than thirty (30) calendar days from the date of award, unless otherwise specified in the Special Provisions.
Signed and sealed this day of , 2026.
By: Principal
Surety
By: Attorney-In-Fact
Assistant County Counsel
2026 Vadis Road Reconstruction Project 1-4 Project # 116200
2026 Vadis Road Reconstruction Project 1-5 Project # 116200 Bid Number 2026.058-ITB
Page of
1.30 FIRST-TIER SUBCONTRACTORS DISCLOSURE FORM
Project Name: 2026 Vadis Road Reconstruction Project Project No. 116200 Bid No. 2026.058-ITB
Bid Closing Date: ___________________________________________________ Bid Closing Time: ___________________________________
Prime Contractor:______________________________________ Contact Name:______________________ Phone No.:______________________
Subcontractor Name and Address
Dollar Value Category of Work to be
Performed by Subcontractor
• Submit this form electronically (on OpenGov Procurement) with the Bid, or on a second, linked solicitation that will be activated after the bid opening. Make additional copies if necessary. Email submissions will not be accepted.
• This list is to be completed and submitted no later than two work hours after the time bids are due.
• If subcontractors subject to the requirement of subsection 00120.40(f) are not used in this project, indicate “NONE” on this form and submit.
Failure to submit this form by the disclosure deadline will result in a non-responsive bid. A non-responsive bid will not be considered for award.
(11/2021)
☐ NONE
Check this box if no subcontractors meeting the requirements of 00120.40(f) will be used on this project.
2026 Vadis Road Reconstruction Project 1-6 Project # 116200 Bid # 2026.058 ITB
PART 2.0, CONTRACT FORMS
2026 Vadis Road Reconstruction Project 2-1 Project # 116200
2.10 CONTRACT AGREEMENT
This contract agreement, made and entered into by and between , hereinafter called the "Contractor", and Washington County, Oregon, a political subdivision of the State of Oregon, herein-after called the "County".
WITNESSETH:
WHEREAS, the Contractor has submitted the lowest acceptable bid to the County, and the contract has been awarded to the Contractor and parties hereto are desirous of entering into a contract for the performance of the said work.
NOW, THEREFORE, the Contractor and the County, for the consideration herein stated, agree as follows:
ARTICLE 1: The Contractor agrees to perform the work and furnish all the materials, labor, tools, and equipment for the construction of “2026 VADIS ROAD RECONSTRUCTION PROJECT” in accordance with the bid made by the Contractor and these contract documents.
ARTICLE 2: The following documents together comprise the Contract Documents and are hereby made a part of this Contract Agreement:
• Addenda, if any - modifications incorporated into the documents before their execution.
• The "Oregon Standard Specifications for Construction", 2024 Edition, Oregon
Department of Transportation (ODOT), Oregon Chapter of American Public Works Association (APWA), and any modifications made by the Special Provisions and any additional specifications included.
• Plans and Drawings
• Bidding Requirements, including:
Invitation to Bid Project Information
• Bid Schedule and Bid forms, including:
Offer Bid Schedule Signature Page Bid Guaranty First-tier Subcontractors Disclosure Form
2026 Vadis Road Reconstruction Project 2-2 Project # 116200
• Contract Forms include:
Contract Agreement Performance Bond Payment Bond Selection of Retainage Option
• Other documents referred to in the contract documents are part of the contract by reference, excepted as otherwise provided excluded by the Oregon Standard Specifications for Construction and or the Special Provisions
• Change Orders and Price Agreements - duly issued contract modifications after the contract documents are executed.
ARTICLE 3: In consideration of the faithful performance of the work herein embraced, the County agrees to pay the Contractor such sum as shall be determined by the County, based upon quantities of work performed and in the manner set forth in these Contract Documents.
ARTICLE 4: The Contractor agrees that the work under this contract shall be completed within the contract time specified in Subsection 00180.50 of the Special Provisions herein.
In the event the Contractor fails to complete work within the contract time or in the extended time agreed upon, liquidated damages shall be computed and paid as specified in, or as modified by the Special Provisions.
ARTICLE 5: The Contractor agrees to faithfully complete and perform all of the obligations of this Contract, shall make payment promptly as due to all subcontractors and to all persons supplying to the Contractor or his subcontractors, equipment, supplies, labor, or materials for the prosecution of the work provided for in this Contract or any part thereof; shall pay all contributions or amounts due the State Industrial Accident Fund and the State Unemployment Compensation Trust Fund from the Contractor or subcontractors incurred in the performance of this Contract and pay all sums of money withheld from the employees of said Contractor and payable to the Department of Revenue pursuant to ORS 316.167; shall not permit any lien or claim to be filed; shall promptly, as due, make payment to any person, co-partnership, association, or corporation furnishing medical, surgical, and hospital care or other needed care and attention incident to sickness or injury to the employees of such Contractor of all sums which the Contractor has agreed to pay for such services and all monies and sums which the Contractor collected or deducted from the wages of his employees pursuant to any law, or contract for the purposes of providing or paying for such service; shall pay all other just debts, dues, and demands incurred in the performance of the Contract; and shall in all respects perform said Contract according to law.
ARTICLE 6: The Contractor agrees to remedy all defects appearing in the work or developing in the materials furnished and the workmanship performed under this Contract for a period of one (1) year after the date of written acceptance of the work by the County and further agrees to indemnify and save the County harmless from any costs encountered in remedying such defects.
ARTICLE 7: It is expressly understood that this Contract in all respects shall be governed by the laws of the State of Oregon and the ordinances and regulations of Washington County.
2026 Vadis Road Reconstruction Project 2-3 Project # 116200
ARTICLE 8: In the event of any action for any purpose to enforce the terms of this Contract, the losing party will pay the prevailing party, in addition to the costs and disbursements allowed by law, such sum as the court may adjudge reasonable as attorney fees for the prosecution of said action, including appeal. Any action arising out of this Contract shall be brought in the Circuit Court for Washington County, Oregon, or the Federal District Court for the State of Oregon, which courts shall have exclusive venue.
ARTICLE 9: The Contractor acknowledges, has read, and understands the insurance and indemnity provisions as covered in 00170 of the Oregon Standard Specifications for Construction, and agrees to abide by them.
ARTICLE 10: This Agreement is binding upon the heirs, executors, administrators, successors, and assigns of each of the parties hereto.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the dates set forth below.
CONTRACTOR
By: ______________________________ Authorized Official Signature per 00130.50
Title: ____________________________
Date: ____________________________
WASHINGTON COUNTY
By:
Title:
Recording Secretary:
Date:
2026 Vadis Road Reconstruction Project 2-4 Project # 116200
2026 Vadis Road Reconstruction Project 2-5 Project # 116200
2.20 PERFORMANCE BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: That, __________________________ by and through its corporate officials, doing business at ______________________
_____________________________________________________ as principal, and
______________________________________________________ as surety, are jointly and severally held and bound unto Washington County, in the sum of
$____________________________________________________ for the payment of which we jointly and severally bind ourselves, our heirs, executors, administrators, and assigns, firmly by these presents.
THE CONDITION OF THIS BOND IS SUCH
That, whereas the said principal herein has made and entered into a certain contract, with Washington County for 2026 VADIS ROAD RECONSTRUCTION PROJECT, which contract, together with the applicable plans, Standard Specifications, special provisions, and schedule of contract prices, is by this reference made a part hereof, whereby the said principal agrees to do in accordance with the certain terms conditions, requirements, plans and specifications which are set out in said contract and all authorized modifications of the contract which increase the amount of the work, the schedule of work and the amount of contract. Notice to the surety of any of the immediately foregoing is waived.
NOW, THEREFORE, if the principal herein shall faithfully and truly observe and comply with the terms, conditions and provisions of the said contract, in all respects, and things by him undertaken to be performed under said contract, upon the terms set forth therein, and within the time prescribed therein, or as extended as provided in the contract, and shall indemnify and save harmless Washington County, its Board of Commissioners, its officers, employees, and agents, against any direct or indirect damages of every kind and description that shall be suffered or claimed to be suffered in connection with or arising out of the performance of the said contract by the said Contractor or his subcontractors and shall in all respects perform said contract according to law, this obligation is to be void, otherwise to remain to full force and effect.
2026 Vadis Road Reconstruction Project 2-6 Project # 116200
Nonpayment of the bond premium will not invalidate this bond nor shall Washington County be obligated for the payment thereof.
Witness our hands this day of , 2026.
By Authorized Official Signature
Attorney in Fact (A Power of Attorney for the Attorney in Fact must be attached to this bond)
Agent
Agent Phone Number
Surety’s Seal Must be affixed
2026 Vadis Road Reconstruction Project 2-7 Project # 116200
2.30 PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: That, __________________________ by and through its corporate officials, doing business at ______________________
________________________________________________________ as principal, and
______________________________________________________ as surety, are jointly and severally held and bound unto Washington County, in the sum of
$_______________________________________________________________ for the payment of which we jointly and severally bind ourselves, our heirs, executors, administrators, and assigns, firmly by these presents.
THE CONDITION OF THIS BOND IS SUCH
That, whereas the said principal herein has made and entered into a certain contract, with Washington County for 2026 VADIS ROAD RECONSTRUCTION PROJECT. Which contract, together with the applicable plans, Standard Specifications, special provisions, and schedule of contract prices, is by this reference made a part hereof, whereby the said principal agrees to do in accordance with the certain terms conditions, requirements, plans and specifications set out in said contract and all authorized modifications of the contract which increase the amount of the work, schedule of work and the amount of the contract. Notice to the surety of any of the immediately foregoing is waived.
NOW, THEREFORE, if the principal herein shall make payment promptly, as due to all subcontractors and to all persons supplying to the Contractor or his subcontractors, equipment, supplies, labor or materials for the prosecution of the work, or any part thereof, provided for in said contract, and shall pay all contribution or amounts due its workers compensation carrier and the State Unemployment Compensation Trust Fund from such Contractor or subcontractors incurred in the performance of said contract, and pay all sums of money withheld from the Contractor’s employees and payable to the Revenue Department; and shall pay all other just debts, dues and demands incurred in the performance of the said contract and shall pay Washington County, such damages as may accrue to the county under said contract, then this obligation is to be void, otherwise to remain in full force and effect.
2026 Vadis Road Reconstruction Project 2-8 Project # 116200
Nonpayment of the bond premium will not invalidate this bond nor shall Washington County be obligated for the payment thereof.
Witness our hands this day of , 2026.
(A Power of Attorney for the Attorney in Fact must be attached to this bond)
Agent Phone Number)
Surety’s Seal Must be affixed
2026 Vadis Road Reconstruction Project 2-9 Project # 116200
2.40 SELECTION OF RETAINAGE OPTION
WHEREAS the Contractor either intends to enter or has entered into a certain contract with Washington County for the 2026 VADIS ROAD RECONSTRUCTION PROJECT.
Retainage in the amount of five percent (5%) of the contract price of the work completed will be held by Washington County until such time as the project is completed and accepted by Washington County. Oregon law allows specific alternatives for the holding and accounting of this retainage at the option of the contractor. FAILURE TO EXECUTE
AND SUBMIT THIS FORM PRIOR TO PREPARATION OF THE FIRST PROGRESS PAYMENT
WILL RESULT IN THE AUTOMATIC SELECTION OF THE FIRST OPTION.
The Contractor elects the following option in providing for retainage for the above-named project. (check one only)
___1. Washington County will withhold payment and invest the retainage with the
County investment portfolio as the retainage accumulates. Interest on the account will accrue to the contractor. Funds in the account will be released to the Contractor as part of final payment.
___2. The Contractor will set up an interest-bearing account in a commercial bank or trust company in Oregon (name of lending institution) in the name of Washington County. The County will place five percent (5%) retainage, withheld from each progress payment, into the interest-earning account. Funds in the account will be under the control of Washington County and will be released to the contractor as part of final payment. Interest on the account will accrue to the contractor.
___3. Before the first progress payment is made, the Contractor will deposit
(cash amount greater than or equal to five percent (5%) of contract amount) in the County’s investment portfolio in lieu of retainage. Interest on the account will accrue to the Contractor. Funds in the account will be released to the Contractor as part of final payment.
___4. The contractor will deposit acceptable bonds or securities, for all or any portion of the amount of funds retained, or to be retained, equal to at least five percent (5%) of the contract amount, with the County or with a bank or trust company in Oregon. The bank or trust company will provide a safekeeping receipt to the County. The securities must cover all of the retainage.
Acceptable Bonds and Securities to be Held in Lieu of Retainage:
2026 Vadis Road Reconstruction Project 2-10 Project # 116200
1. Bills, certificates, notes, bonds or other obligations of the United States, its agencies or its wholly owned corporations. Obligations of a corporation wholly owned by the federal government.
2. Indebtedness of the Federal National Mortgage Association.
3. General obligation bonds of the State of Oregon or a political subdivision of the State of Oregon.
4. Irrevocable letters of credit issued by an insured institution, as defined in ORS
706.008.
For
Company Name Federal Tax ID Number
By (Signature) By (Printed Name)
Approved as to Form:
Cortney D. Duke-Driessen, Deputy County Counsel Signed and Dated: May 15, 2024
2026 Vadis Road Reconstruction Project 2-11 Project # 116200
2.50 RETAINAGE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
That, __________________________________ by and through its corporate officials, a ___________________, organized and authorized to do business in the State of Oregon, as Principal, and ______________________________________________________, authorized to transact the business of surety in the State of Oregon, as Surety, are jointly and severally held and bound unto Washington County, in the penal sum of $_____________________ , plus ________% of any increases in the contract amount that may occur because of change orders or increases in the quantities of or that addition of any new item of work.
THE CONDITION OF THIS BOND IS SUCH THAT
Whereas the said Principal herein has made and entered into a certain contract, with Washington County for __________________________________, which contract, together with the applicable plans, standard specifications, special provisions, and schedule of contract prices, is by this reference made a part hereof; and
Whereas the contract requires, and ORS 279C.560 allows the County to reserve as retained from any progress payment an amount not to exceed five percent from money earned on estimates during the progress of construction, in protection of the Country’s interests; and
Whereas the Principal has requested that the County accept a surety bond in lieu of earned and retained funds and County has agreed to allow a retainage bond in lieu of earned and retained funds;
NOW, THEREFORE, the obligation is such that the Surety and the Surety’s successors and assigns are held and bound to the County for the aforementioned amount.
This surety bond and any proceeds from the surety bond are subject to all claims and liens by the County against the Principal in the same manner and priority as specified for retainage under ORS 279C.555 through 279C.570, 279C.600 to 279C.625, as applicable. The condition of this obligation is such that if Principal satisfies all payment obligations that County may lawfully claim against contract sums due to Principal and indemnify and hold the County harmless from any and all loss, costs and damages that the County may sustain by release of the retainage to Principal or Surety, this obligation is null and void if the County notifies the Surety that the County released the obligation. This obligation otherwise remains in full force and effect.
2026 Vadis Road Reconstruction Project 2-12 Project # 116200
Surety agrees Surety is liable under this obligation in the same manner and to the same extent as Principal. Surety hereby waives notice of any alteration of contract or extension of time made by County. Surety will not be discharged or released from liability for any act, omission or defense of any kind or nature that would not also discharge the Principal. This obligation is binding upon and inures to the benefit of Principal, the Surety, County, and any of their respective heirs, executors, administrators, successors and assigns.
Nonpayment of the bond premium will not invalidate this obligation, nor shall County be obligated for the payment thereof.
In the event it becomes necessary to place this bond in the hands of legal counsel for collection, Principal and the aforesaid Surety, jointly and severally, hereby agree and covenant to pay Washington County’s reasonable collection costs, including reasonable attorney fees, even though no suit or action is filed herein; however, if such suit or action is filed, the amount of such reasonable attorney fees shall be fixed by the court or courts in which the suit or action is heard, including on appeal.
Witness our hands this day of , 2 .
By____________________________ Authorized Official Signature Authorized Official Signature
Title__________________________
(A Power of Attorney for the Attorney in Fact must be attached to this Bond)
APPROVED AS TO FORM
/s/ Cortney Duke-Driessen___ Deputy County Counsel Date: 05/15/2024
2026 Vadis Road Reconstruction Project 2-13 Project # 116200
| PART 1.0, BIDDING FORMS |
| 1.10 SIGNATURE PAGE |
| 1.20 BID GUARANTY FORM |
| 1.30 FIRST-TIER SUBCONTRACTORS DISCLOSURE FORM |
| Dollar Value |
| PART 2.0, CONTRACT FORMS |
| 2.10 CONTRACT AGREEMENT |
| 2.20 PERFORMANCE BOND |
| 2.30 PAYMENT BOND |
| 2.40 SELECTION OF RETAINAGE OPTION |
| 2.50 RETAINAGE BOND |
By By____________________________