11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf

PDF 99 KB Posted

Attached to
Sidewalk Replacement and Repair - South (WORCS 2)
Solicitation number
IFB-26-00297
Issued by
Hillsborough County, Florida

About this file

This is a Small Business Encouragement (SBE) subcontractor and material supplier disclosure form required by Hillsborough County, Florida for the Sidewalk Replacement and Repair - South (WORCS 2) project. The form mandates that bidders list all registered SBE subcontractors and material suppliers they intend to utilize, including the specific scope of work or work item numbers and estimated dollar amounts for each subcontractor. The underlying contract opportunity involves sidewalk replacement and repairs with an estimated project value of $10,000,000.00, encompassing removal of existing sidewalks, construction of new concrete segments, repair and rehabilitation of existing sidewalks and curb ramps, ADA compliance grinding and retrofitting, incidental irrigation system repairs, tree removal, temporary traffic control, and site restoration activities.

Hillsborough County has established a 9% SBE participation goal for this contract, requiring bidders to demonstrate meaningful inclusion of small business enterprises. All SBEs listed must be registered with Hillsborough County or possess reciprocal eligibility with supporting documentation as defined in the solicitation. Material suppliers that are registered SBEs and furnish but do not manufacture supplies receive 50% credit toward the SBE participation goal. Bidders must also list any non-SBE subcontractors and material suppliers separately on the form. Failure to properly complete the SBE-1 form requirements may result in rejection of the entire bid, making accurate and thorough submission of this documentation critical to bid acceptance.

View the file

Other files

File Type Posted
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
16-Attachment B- Sidewalk Spec R3.pdf PDF
25-Payment Bond 07.02.25.pdf PDF
23-Agreement - Construction - Term Contract.doc.pdf PDF
26-IFB-26-00297 Addendum 1.pdf PDF
24-Performance Bond 07.02.25.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
14-Subcontractor Letter of Intent .pdf PDF
21-Attachment E- Insurance Requirements.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
4-Consent of Surety-Change Order.pdf.pdf PDF
8-Insurance Certificate.doc.doc DOC document
22-1. IFB-26-00297 Terms and Conditions.pdf PDF
15-Attachment A- Construction Sign 2026.pdf PDF
3-Application for Payment.pdf.pdf PDF
2-Allowance Authorization Release Form.pdf.pdf PDF
27-IFB-26-00297 Preliminary Bid Tabulation.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
20-Attachment D- Project Maps South.pdf PDF
17-Attachment C- Supplemental Specifications.pdf PDF
19-Bid Bond.pdf PDF
13-SBE-2 Goal Participation Tutorial.mp4 MP4 file
18-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.pdf PDF
7-Change Order Form.pdf.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBE – 1 FORM

(Revised 12/2025)

HILLSBOROUGH COUNTY

SMALL BUSINESS ENCOURAGEMENT PROGRAM

SUBCONTRACTORS/MATERIAL SUPPLIERS LIST (SBE-1 FORM)

BID NO.: BIDDER NAME:

List all registered Small Business Enterprise (SBE) subcontractors/material suppliers1 to be utilized on this project.

Include business name, scope of work/work item number to be performed, and estimated dollar amount of each item.

If the solicitation is a “Work Order/Term Contract”, the “Estimated Dollar Amount” may be left blank. All SBEs that are listed as “registered” must either be registered with Hillsborough County or have reciprocal eligibility

(provide supporting documentation) as specifically set forth in the County’s solicitation document.

A Bidders failure to complete the requirements of this page may result in their entire Bid being rejected.

Registered SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

1Material Suppliers: Registered SBE firms that furnish supplies for projects, but do not manufacture the supplies, will be partially credited at fifty percent (50%) towards the project’s SBE participation goal.

List all other subcontracted scopes of work or work item numbers to be performed by non-registered SBE subcontractors/material suppliers on this project and estimated dollar amount of each item:

Non-SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

File details come from the government source that posted it. Updated .