11-2026 Addendum for Chiller Maintenance and Repair.docx
DOCX document 79 KB Posted
- Attached to
- CHILLER REPAIR AND MAINTENANCE
- Solicitation number
- Solicitation201
- Issued by
- Ramsey County, Minnesota
About this file
This addendum to a Request for Proposal issued by the Metropolitan Airports Commission on September 1, 2026, clarifies key provisions for chiller repair and maintenance services at Minneapolis-St. Paul International Airport (MSP) and St. Paul Downtown Airport (STP) in Minnesota. The addendum addresses four critical vendor questions regarding scope of work, pricing structure, and service delivery. A mandatory pre-proposal meeting and tour was scheduled for August 24, 2026. The document requires vendors to acknowledge receipt and understanding of the changes by submitting an original signed copy of the addendum signature page with their sealed bid response.
The addendum clarifies that the Metropolitan Airports Commission (EMC) will perform all condenser coil cleaning on air-cooled chillers, meaning contractors should not include this service in their base bid pricing. Repairs or replacements of tubes, tube supports, end sheets, and other internal components are excluded from base contract pricing and will be billed as extra costs to the Commission. For the three Trane chillers at Terminal 2 scheduled for replacement by December 2026, contractors should not include shutdown and startup services in year one pricing, as the factory authorized representative will handle these tasks during decommissioning. Additionally, refrigerant charges and labor to maintain full refrigerant loads are excluded from base bid pricing and will be billed separately to the Commission. All other provisions of the original RFP remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-MINIMUM REQUIREMENTS FORM.docx | DOCX document | |
| 7-RESPONSE FORM.docx | DOCX document | |
| 4-COST PROPOSAL Sheet 2.docx | DOCX document | |
| 5-AFFIDAVIT OF NON COLLUSION.docx | DOCX document | |
| 6-COST PROPOSAL Sheet 3.docx | DOCX document | |
| 10-Workforce and Equal Pay Declaration Page.pdf | ||
| 3-COST PROPOSAL Sheet 1.docx | DOCX document | |
| 9-SUB-CONTRACTORS FORM.docx | DOCX document | |
| 8-REFERENCES FORM.docx | DOCX document | |
| 1-RFP Chiller Repair and Maintenance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
METROPOLITAN AIRPORTS COMMISSION
6040 28th Avenue South Minneapolis, MN 55450 (612)726-8100
ADDENDUM
for Chiller Repair and Maintenance
Issued: September 01, 2026
This is an addendum to the RFP and shall now become a part of the solicitation documents.
A signed copy of this addendum shall be submitted with your sealed bid.
VENDOR QUESTIONS:
1. Can you please clarify if annual condenser coil cleaning is required by contractor or does the MAC self-perform condenser coil cleaning on all air-cooled chillers. If required by the contractor, please define the number of coil cleanings to include in our base bid. The phrase "as needed" is vague.
Answer: EMC does all the coil cleaning.
2. Please clarify that contractor is not covering repairs or replacement of tubes, tube supports, end sheets, etc. under the base contract pricing and that these repairs are considered as extra cost and billable to the MAC.
Answer: Correct
3. For the upcoming replacement of the 3 Trane chillers at Terminal 2 by December 2026, how do we address the chiller shutdowns and startups as these 3 chillers will be removed from service? Should We assume not to include shutdown and startup for year 1 as the chillers will be decommissioned and startup will be performed the factory authorized representative?
4. Please clarify and confirm that adding refrigerant to maintain a full refrigerant charge on the chillers is not part of the base bid and that providing new refrigerant and labor to install the refrigerant will be extra and billable to the MAC.
All other provisions of the RFP text remain unchanged.
Vendor hereby acknowledges receipt and understanding of the change.
Vendors must have the original signature page of this document attached to the RFB response.
1. Fill in all the boxes.
2. Sign.
3. Attach the original signature page with your RFP response.