About this file
This document is an Attachment 9 - Proposed Subcontractors form for a Request for Proposal (RFP) Solicitation No. BPM006379 issued by the Arizona Department of Environmental Quality (ADEQ), located in Phoenix, Arizona. The primary contractor is Watearth, who is submitting proposed subcontractors for a capacity development and technical assistance project focused on small public drinking water systems.
The proposed subcontractors include Bird Eye Ariel Drones (BEAD), a small business that will provide aerial survey, topographic survey, and GIS services, and DCI Engineers, who will handle structural engineering work. Watearth indicates they will apply their quality assurance and quality control (QA/QC) processes to ensure the subcontractors' work meets contract requirements. The percentage of work for each subcontractor is currently listed as "TBD" (to be determined), and the document allows for potential additional subcontractors to be added. The solicitation suggests that the state may request additional information about proposed subcontractors as a precondition of contract award.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 9 – Proposed Subcontractors
Contractor Name: [Watearth]
Check “NO” if you WILL NOT subcontract any portion of the Work and will therefore be performing all of the Work with your own personnel.
| ☐ |
| NO, the Offeror will not subcontract any portion of the Work. |
If you WILL subcontract any portion of the Work, check “YES” below and list the name(s) of persons or companies you propose to use as Subcontractors.
1. Fill in the information for each significant Subcontractor – indicate the type of work the Subcontractor will perform under the Contract and their approximate percentage of the total Contract work;
2. Provide copies of relevant certifications each person or firm possesses attached to this form; AND
3. Provide a description of quality assurance (QA) and quality control (QC) measures that you will use to ensure that Subcontractor’s work meets the Contract requirements.
State may demand additional information about proposed Subcontractors as a precondition of Award.
| ☒ |
| YES, the Offeror will use the Subcontractors listed below: |
Request for Proposal
Solicitation No. BPM006379
Capacity Development/Technical Assistance to Small Public Drinking Water Systems Arizona Department of Environmental Quality (ADEQ) 1110 W. Washington Street Phoenix, AZ 85007
Solicitation Attachment – Proposed Subcontractors | Revision No. 1 | Revised 11-22
| No. |
| Name and contact information |
| Small business |
| Work to be performed and QA/QC measures |
| % |
| 1. |
| [Bird Eye Ariel Drones (BEAD)] |
Sheri Painter, CEO, (805) 890.8817, sheri@bead.global, 17470 N Pacesetter Way, Scottsdale, AZ, 85255
| Yes |
| [Aerial Survey, Topo Survey, GIS] |
Watearth applies our QA/QC process to sub-consultant's work and also ensure the sub-consultants follow QA/QC process
TBD
| 2. |
| [DCI Engineers] |
[Suzanne Clemmer, 619.417.2336, sclemmer@dci-engineers.com]
No [Structural Engineering]
[Watearth applies our QA/QC process to sub-consultant's work and also ensure the sub-consultants follow QA/QC process]
TBD
| 3. |
| [Name] |
[Contact information] Yes or No [Work to be performed]
[QA/QC measures] X
| 4. |
| [Name] |
[Contact information] Yes or No [Work to be performed]
[QA/QC measures] X
| 5. |
| [Name] |
[Contact information] Yes or No [Work to be performed]
[QA/QC measures] X
Solicitation Attachment – Method of Approach | Revision No. 1 | Revised 11-22 image1.jpg