This is a Road Bridge Inspection Report for the Francis Mill Creek Bridge, a structure in the George Washington & Jefferson National Forests (Route 14, Milepost 5.2600, Structure No. 080814000003217) located in Wythe County, Virginia. The routine inspection was conducted on September 17, 2024, by inspection team leader David Rasmussen and team members J. Chrysostom and M. Prosser for the USDA Forest Service, Region 8.
The bridge, built in 1935, is a 1-lane, 2-way traffic structure with a 20-foot overall length, 15.90-foot deck width, and 19.20-foot maximum span. It features a concrete reinforced slab deck and precast panel wearing surface over concrete reinforced girders, supported by two concrete reinforced wall abutments. The bridge carries minimal traffic (ADT of 10) and is posted at or above legal loads with an HS20-44 design load rating. Key findings indicate fair to poor condition ratings across categories: Deck (6), Superstructure (6), and Substructure (4). Critical issues identified include poor quality concrete at both abutments, a scour hole with approximately 1-foot undermining of the far abutment, standing water and abrasion on the deck, and potholing on approaches. The structure evaluation rating is 4, waterway adequacy is 6, and the scour critical bridges rating is 4. Recommended work items include routine bridge inspection every 24 months, repair of footing undermining using grout bags, deck cleaning (260 SF), approach surfacing and pothole repair, brush clearing, and bridge railing upgrade to curbs only (40 LF). The inspection cost was $0.00, with a 30-month structure life remaining. Load rating data from 2019 shows safe posting capacities for various vehicle types, including Type 3 (32 tons), Type 3S2 (50 tons), and Type 3-3 (62 tons).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection Date:
Route: 14 Milepost: 5.2600 Structure No:
OVER
County, (Signature)
BRIDGE INSPECTION AND MANAGEMENT PROGRAM
FRANCIS MILL CR. BRIDGE
GEORGE WASHINGTON & JEFFERSON NATIONAL FORESTS
USDA FOREST SERVICE, REGION 8
080814000003217
ROAD BRIDGE INSPECTION REPORT
INSPECTION TEAM LEADER: David Rasmussen
U.S. DEPARTMENT OF AGRICULTURE
09/17/2024
INSPECTION TYPE: ROUTINE
Wythe Virginia
FRANCIS MILL CR. BRIDGE FRANCIS MILL CREEK
Structure Name: FRANCIS MILL CR. BRIDGE Date: 9/17/2024
Route: 14 / Milepost: 5.26 Structure No.: 080814000003217
Compass
(direction approximate)
Bearing: 39 deg.
(Plan-view, No Scale)
ORIENTATION:
Components lateral to flow are counted from Left-to-Right; when viewed from Upstream, looking Downstream
… such as: Abutments, Piers, Floor-beams
Components in line with flow are counted from Upstream-to-Downstream; when following the flow direction
… such as: Girders, Abutment Posts, Pier Columns
See also Compass-rose for additional orientation; "N" positioned to approximate north orientation along Span in plan-view
… Compass-Bearing, if provided, shows approximate alignment sighting from CL-Abut1 to CL-Abut2
TERMS AND ABBREVIATIONS
A, or, ABUT: Abutment Suffix with ## numbering sequence per reference above
AL, or, ALUM: Aluminum
APPR: Approach roadway Suffix with ## numbering sequence per reference above
C, or, COL: Column Suffix with ## numbering sequence per reference above
CL: Centerline, centerline of roadway alignment or center axis along member-shape
D, or, DIA: Diaphragm Suffix with ## numbering sequence per reference above
DS: Downstream
EMB: Embankment
F, or FT: Footer
G, or, GR: Girder Suffix with ## numbering sequence per reference above
GL: Glued-laminated
P, or, AP: Abutment Post Suffix with ## numbering sequence per reference above
P, or, PI: Pile Suffix with ## numbering sequence per reference above
RP: Rail Post Suffix with ## numbering sequence per reference above
US: Upstream
R: Rock, substantial natural outcrop among otherwise small bedform material
RAP: Riprap, imported and shaped bank armoring
S: S-shape, steel member with applicable description
SB: Scupper Block Suffix with ## numbering sequence per reference above
TH: Thalweg, lowest point of streambed channel
TIE: Tie-rod, post tensioning rod joining members with prescribed stress-level
W: W-shape, steel member with applicable description
BRIDGE ORIENTATION AND REPORT ABBREVIATIONS
US A1 WW US A2 WW
DS A2 WWDS A1 WW
APPR 1 APPR 2
RP
RP2
G 1
G 2 P2
P1
A B
U T
A B
U T
P
IE
R
P
IE
R
N
WW: Wing-Wall, angled section of abutment extending beyond shoulder for embankment retention
Structure Name: (8)Structure No:
(5D)Route:
Forest:
20.0
13.2
(45)No. Main Spans: 1
(46)No. Appr Spans: 0
No. Substrs: 2
Rating Date:
(41) Posting Status:
(70) Posting Capacity:
(31)Design Load: Yes/No Due
(63,65)Method of Load Rating: Freq. Date
Current Posting Signs Yes No N
Are weight limit signs required at each end? X N
Correct Signage? N
Yes No Special Inspection Equipment Needed:
Type 3
Type 3S2
Type 3-3
X
Date:
Inspection Team: Leader: Jurisdiction:
Weather: Latitude:
(9)Location: Str. Life Remaining
Inspection Done By: Inspection Done By Name:
Critical Findings:
Narrative Report: (Add additional sheets if necessary)
Misc. INFRA Data
State VIRGINIA
County WYTHE
ADT 10
1 LANE BRIDGE, 2-WAY TRAFFIC (28A) Lanes on the Structure 1
Wall Abutment
Open, No Restriction
At Or Above Legal Loads
SPECIALIZED INSPECTIONS:
(43B)Superstr Type:
BRIDGE RATING SUMMARY:
Concrete Precast Panels (108A) Wearing
Surface:
(107)Deck StructureType:
(43A)Superstr Material:
(44A)Appr. Superstr Mat'l:
Concrete, Reinforced
Concrete, Reinforced
Rainy
Months Inspection Cost
(49)Overall Br Length: 16.80
Portland Cement Concrete
NBIS Bridge Opening:
99.99 45
Slab
(53)Vertical(47)Horizontal
USDA FOREST SERVICE, REGION 8
(11)Milepost: 5.2600
BRIDGE IDENTIFICATION AND LOCATION
080814000003217
GEORGE WASHINGTON & JEFFERSON NATIONAL FORESTS
(32)Approach Roadway Width:
(48)Max Span:
(52)Deck Width out-out: 15.90(51)Roadway Width (Curb to Curb):
Security ID 0808
12.00
BRIDGE DESCRIPTION and MEASUREMENTS
George Washington & Jefferson National ForestsDistrict:
19.20
(27)Year Built:
(6)Feature Crossed:
FRANCIS MILL CR. BRIDGE
FRANCIS MILL CREEK
Infra data used for this report was pulled on: 03/25/2024
(92A) Fracture Critical (92B) Underwater
(92C) Special
HS20-44
LRFR REPORTED AS TONS
Time Completed:09/17/2024 Time Started:
INSPECTION INFORMATION
J. Chrysostom, D. Rasmussen, M. Prosser
Longitude: 0.00000000
FS
Verified
11/12/2019
(102) Direction of Traffic
Substr Material:
5.26 MI. E. US HWY 21
Re-rating required ?
FS - Forest Service Region 8 - Southern Region
Inspection Template Revision Date: 03/25/2024
Recommended Inspection Frequency:
David Rasmussen
0.00000000
(34)Skew:
Substr Type:
(44B)Superstr Type:
Specialized Inspections Required
(23 CFR 650.303)
Correct
Requirements?
Description:
Structure Name: (8)Structure No:
(5D)Route:
Forest:
Development Status: Date:
DATA Safe
Vehicle Type Date Oper. Load
HL-93 11/12/19 8 - LRFR REPORTED AS RATING FACTOR 0.75
HS20-44
Type 3 11/12/19 3 - LRFR REPORTED AS TONS 32.00
Type 3S2 11/12/19 3 - LRFR REPORTED AS TONS 50.00
Type 3-3 11/12/19 3 - LRFR REPORTED AS TONS 62.00
NRL 11/12/19 3 - LRFR REPORTED AS TONS 42.00
SU4 11/12/19 3 - LRFR REPORTED AS TONS 30.00
SU5 11/12/19 3 - LRFR REPORTED AS TONS 34.00
SU6 11/12/19 3 - LRFR REPORTED AS TONS 36.00
SU7 11/12/19 3 - LRFR REPORTED AS TONS 40.00
EV2
EV3
Permit 1
Permit 2
Permit 3
Permit 4
User Defined 1
User Defined 2
User Defined 3
User Defined 4
Special
Alt. Interstate
H Loading
Railroad
Uniform
Gross Load Only
Gross Load
Security ID 0808
EXISTING - ACTIVE Jurisdiction: FS - FOREST SERVICE 9/17/2024
FRANCIS MILL CREEK(6)Feature Crossed:
LOAD RATING DATA
GEORGE WASHINGTON & JEFFERSON NATIONAL FORESTS
BRIDGE IDENTIFICATION AND LOCATION
(11)Milepost: 5.2600
Method
George Washington & Jefferson National ForestsDistrict:
0.58
Inv.
Safe
Posting
FRANCIS MILL CR. BRIDGE 080814000003217
CODE
Fair
1. Fair Potholing on approaches
2. Good
3. Good
4. Fair Minor settlement at both approaches
N/A
* 1. Fair Abrasion on top of deck
C1. N/A
C2. N/A
C3. N/A
C4. Fair Standing water observed on bridge deck
C5. Fair
C6. Fair
C7. N/A
C0 Deck OTHER N/A
* 1. 4 Girder Good See deck
a. Girder Diaphragms N/A
b. Girder Bracing N/A
* 2. N/A
* 3. N/A
* 4. N/A
a. Trusses Bracing N/A
b. Trusses Chord N/A
c. Trusses Portal N/A
d. Trusses Vertical/Diagonal N/A
C1. Good
C2. N/A
C3. N/A Not observed
C4. N/A Not observed
C0 Superstructure OTHER N/A
*1. Fair
*2. Fair Scour hole with approx 1ft undermining of far abutment.
*3. Good
*4. Good
*5. N/A
*6. Good
*7. Good
*8. Poor Poor quality concrete at both abutments
*9. Fair
*10. Fair
*11. N/A
*12. N/A
*13. N/A
*14. N/A
*15. N/A
*16. N/A
*17. N/A
*18. N/A
C0 Substructure OTHER N/A
Also includes wingwalls connected to the superstructure above the beam seat.
Wearing Surfaces
Deck Slab/Panels/Joists
(Overall Code for item, to be reported to
58. DECK:
APPROACH CONDITION:
Surfacing
Shoulder Embankment
Roadway Embankment
Approach Settlememt
REMARKS
CONDITION CODES and REMARKS
Floor Beam
60. SUBSTRUCTURE:
Piers Caps
Abutments Caps
Abutments Backwalls
59. SUPERSTRUCTURE:
Sidewalks
Drains and Drainage
Rideability
Cleanliness
Utilities
Deck Joints
Curbs
Stringer
Abutments Erosion or Scour
Abutments Piles/Bracing
Bearing Devices
Paint
Trusses
Deflection Under Load
Piers Bearing Seats
Piers Erosion or Scour
Piers Piles and Bracing
Piers Columns or Walls
Piers Footings
P
IE
R S
Piers Settlement
Piers Alignment (Tiping, Tilting)
* Only items with asterisk are used in the determination of the overall condition rating for that category, e.g. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
Vibration Under Load
Abutments Weep Holes
A B
U T
M E
N T
S
Abutments Footings/Sills
Abutments Wing Walls
Abutments Alignments
Abutments Bearing Seats
Abutments Settlement
CODE(Overall Code for item, to be reported to REMARKS
CONDITION CODES and REMARKS
Includes wingwalls integral with the abutment or the portion of the wingwall below the bearing seat.
CODE(Overall Code for item, to be reported to REMARKS
CONDITION CODES and REMARKS
1. Fair
2. Good
3. Good
4. Fair
5. Good
6. Good
C0 Channel OTHER Fair Flow attacking far abutment
N/A *1. Shape N/A
*2. N/A
*3. N/A
*4. N/A
5. N/A
C0 Culvert OTHER N/A
36. TRAFFIC SAFETY FEATURES:
36A. 0
36B. N
36C. N
36D. N
1.
N/A
2. Good 4 object markers present
72. APPROACH ROADWAY ALIGNMENT: 8
1. 8
2. 8
29. ROAD ADT 10
67. STRUCTURAL EVALUATION 4
68. DECK GEOMETRY: 7
69. UNDERCLEARANCE: N
71. WATERWAY ADEQUACY: 6
113. SCOUR CRITICAL BRIDGES: 4
Other potential Critical Findings? Describe on Critical Findings Tab
Abutment and Pier Types:
Load Rating Sketches
Vertical
Seams or Joints
Material Condition
Foundations
Headwall/Wingwall
Observed Lateral Movement
Clear Height
62. CULVERTS
Bridge Railing
Rail Transitions
Approach Guardrails
Approach Rail Ends
Signing
Object Markers
Horizontal
* Only items with asterisk are used in the determination of the overall condition rating for that category, e.g. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
A P
P R
A
IS
A L o f e le m e n ts
Channel Scour/Erosion
Channel Protection
Vegetation
Waterway Obstruction/Drift
61. CHANNEL and CHANNEL PROTECTION:
APPRAISAL CODES and REMARKS
CONDITION of Elements
Yes
Wall Type
Abutment Spill Through Pier(s)
Timber Steel Concrete
Show SI&A Sheet
Milepost: 5.2600 Structure No.:
Work Item
Category Detailed Work Item Description C.F.
Related
Inspection Routine bridge inspection every
2 years
Substructure
A2 abutment has hole under footing measured at 3'W x 4'D x
1.5'H as of 8/18/20 inspection.
Repair using grout bags.
Deck
Approach
Condition fix potholes on approaches.
Approach
Condition
Traffic Safety
Features
General / Brush Approaches 1
Bridge Railing / Upgrade Railing to
Curbs Only
40LF
LS/A
LS/B
Surfacing / Repair Native/Aggregate
Concrete Abutments/Piers / Repair
Footing Undermining
Clean Deck 260
LS
SF
LSRoutine Bridge Inspection / Routine
8001001
7004004
7001001
Work Item
Code
5003004
9001002
UnitWork Item Quantity
RECOMMENDED WORK ITEMS
Date:FRANCIS MILL CR. BRIDGE
Route:
Structure Name:
080814000003217
09/17/2024
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Date:
Route: Milepost: Structure No:
BRIDGE PHOTOS
Near Approach, looking ahead. Note approach potholing.
Far Approach, looking back
Structure Name: FRANCIS MILL CR. BRIDGE 09/17/2024
14 5.2600 080814000003217
BRIDGE PHOTOS
Structure Topside View. Note standing water and abrasion.
Structure Underside View
Structure Name: FRANCIS MILL CR. BRIDGE 09/17/2024
BRIDGE PHOTOS
Upstream Elevation View
Downstream Elevation View
Structure Name: FRANCIS MILL CR. BRIDGE 09/17/2024
Structure Name: FRANCIS MILL CR. BRIDGE 09/17/2024
14 5.2600 080814000003217
BRIDGE PHOTOS
Near Abutment Elevation, stream flow from "left"
Far Abutment Elevation, stream flow from "right". Note exposed footing with scaling and abrasion.
BRIDGE PHOTOS
Stream View from Structure, looking downstream
Stream View from Structure, looking upstream
Structure Name: FRANCIS MILL CR. BRIDGE 09/17/2024
Structure Name: FRANCIS MILL CR. BRIDGE 09/17/2024
14 5.2600 080814000003217
BRIDGE PHOTOS
Undermining of far abutment.
Abrasion and wear to concrete at downstream end of far abutment.
Structure Name: Date:
Route: Milepost: 5.2600
6.5
2018 2020 2022 2024 2026 2028 2030
0.0 0 0 0 0
1.9 0 0 0 0
2.0 6.95 7.1 6.8 6.9
5.0 6.55 6.55 6.7 7
9.0 7.75 7.65 7.3 7.45
13.0 7.35 7.5 7.9 7.25
15.0 7.6 7.62 7.3 4.08
18.0 7.75 7.75 4.1 4.1
18.1 0 0 0 0
20.0 0 0 0 0
Water Surface
Channel Cross Section
Horizontal Dist
Measured from A-1
09/17/2024
Structure No: 080814000003217
FRANCIS MILL CR. BRIDGE
Input Cross-Section Data:
Height (feet) from thalweg to bottom of lowest superstructure member
Horizontal Dist.
Location Notes
Top of DeckDistance Measured from Upstream Side
Measured to riprap
Measured to riprap
0.0 5.0 10.0 15.0 20.0 25.0
Top of Rail
(Substructure elements can be inserted in the cross-section using Insert, Shapes )
Structural Inventory and Appraisal Sheet
USDA Forest Service: Name: FRANCIS MILL CR. BRIDGE
(5D) Rte. No: 14 (11) MP: 5.3 (8) Str. No: 080814000003217
Route Name: DRY RUN (112) NBIS Bridge Length
(1) State Name: VIRGINIA (104) Highway System
(8) Structure Number: 080814000003217 (26) Functional Class
(5) Inventory Route: A: B: C: D: E: (100) Defense Highway
(2) Highway Agency District: (101) Parallel Structure
(3) County: WYTHE (4) Place Code: (102) Direction of Traffic
(6) Features Intersected: Drawing Number R-48200
(7) Facility Carried: (103) Temporary Structure
(9) Location: (110) Designated National Network
(12) Base Highway Network: (20) Toll
(13) LRS Inventory Route: (21) Maintain
(16) Lat / Long (37) Historical Significance
(98) Border Bridge St Code: 0 % Share: 0 Maint. Level:
(99) Border Bridge Structure No.: Insp. Resp.
(43) Structure Type Main: Mat'l: CONCRETE, REINFORCED (58) Deck
Type: SLAB (59) Superstructure
(44) Structure Type Appr: Mat'l: 0 (60) Substructure
Type: 0 (61) Channel & Channel Protection
(45) Number of Spans in Main Unit: 1 (62) Culverts
(46) Number of Approach Spans: 0
(107) Deck Structure Type: (67) Structural Evaluation
(108A) Type of Wearing Surface: PORTLAND CEMENT CONCRETE (68) Deck Geometry
(108B) Type of Membrane: NONE (69) Underclearances, Vert. & Horiz.
(108C) Type of Deck Protection: NONE (71) Waterway Adequacy
No.Substr Units: 2 Substr Type: WALL ABUTMENT (72) Approach Roadway Alignment
Substr Matr: CONCRETE, REINFORCED (36) Traffic Safety Features
(113) Scour Critical Bridges
(27) Year Build: 1935
(106) Year Reconstructed: (38) Navigation Control: NOT APPLICABLE
(42) Type of Service On Highway: HIGHWAY NO WATERWAY
Under Highway: WATERWAY (111) Pier Protection:
(28) Lanes On Structure: Under Structure: (39) Navigation Vertical Clearance: ft.
(29) Average Daily Traffic (ADT): 10 (116) Vert-Lift Bridge Nav Min. Vert. Clr: ft.
(30) Year of ADT: (109) Truck ADT: (40) Navigation Horizontal Clearance: ft.
(19) Bypass, Detour Length: 0
(90) Routine Inspection Date
(48) Length of Maximum Span: ft. (91) Frequency
(49) Structure Length: ft. (92) Critical Feature Inspection (93) CFI Date
(50) Curb or Sidewalk: Left: ft. Right: ft. A) Fracture Critical Detail N A) 0
(51) Bridge Roadway Width Curb to Curb: ft. B) Underwater Inspection N B) 0
(52) Deck Width Out to Out: ft. C) Other Special Inspection N C) 0
(32) Approach Roadway Width (w/ Shoulders): ft.
(33) Bridge Median: (31) Design Load
(34) Skew: 45(35) Structure Flared: (70) Bridge Posting
(10) Inventory Route Min. Vert. Clear: ft. (41) Structure Open,
(47) Inventory Route Total Horiz. Clear: ft. Posted or Closed
(53) Min. Vert Clear over Bridge Rdwy: ft.
(54) Min. Vert. Underclear: ft.
(55) Min. Lat. Underclear Rt.: ft.
(56) Min. Lat. Underclear Lt.: ft.
George Washington & Jefferson National Forests R 8
IDENTIFICATION CLASSIFICATION
N
#N/A
#N/A
#N/A
1 LANE BRIDGE, 2-WAY TRAFFIC
#N/A
C - COLLECTOR
OPEN, NO RESTRICTION
#N/A
#N/A
HS20-44
AT OR ABOVE LEGAL LOADS
CONDITION
FS - FOREST SERVICE
24 MONTHS
POSTING INFORMATION
APPRAISAL
FS - FOREST SERVICE
#N/A
9/21/2022
INSPECTIONS
NAVIGATION DATA
3 - SUITABLE FOR PASSENGER CARS
STRUCTURE TYPE AND MATERIAL
CONCRETE PRECAST PANELS
GEOMETRIC DATA
AGE AND SERVICE
Milepost:
ID
Description
Needed for Real Property Verification
N Re-rating required? (Enter Y/N)
N Specialized Equipment Required? (Enter Y/N)
Infra Summary Data
Structure Name: FRANCIS MILL CR. BRIDGE 9/17/2024
Route: 14 5.2600 Structure No: 080814000003217
Main Data Appraisal Data
Insp Team Leader
Inspection_Type (System Generated) (System Generated)
Inspection Date 09/17/2024 ROUTINE
Inspection Freq 24
Wear Srfc Cond N/A
Deck Cond (58) 6
Inspection Cost $0.00
Aprch Cond Fair
Culvert Cond (62) N/A
Channel Cond (61) 7
Supstr Cond (59) 6
Substr Cond (60) 4
Inspected By* David Rasmussen
Done By (Org) FS - Forest Service
Scour Crit Br (113) 4
Insp Resp Name FS - FOREST SERVICE
Main Data Appraisal Data
Done By Name (Unit) Region 8 - Southern Region
Str Eval (67) 4
Deck Geom (68) 7
Approach Align (72) 8
Underclr (69) N
Waterway Adq (71) 6
Insp Remarks
Approach Rail Ends (36D) N
J. Chrysostom, D. Rasmussen, M. Prosser
David Rasmussen
Insp Team
Transition (36B) N
Approach Guardrail (36C) N
Traffic Rail Safety Features Appraisal
Bridge Rail (36A)
Structure Name: Date: 9/17/2024
Route: Milepost: 080814000003217
Vertical Wall Abutments Not on Piles or Bedrock Codings
Scour Scenarios Scour Critical Code Yes No Yes No Yes No Yes No Yes No Yes No
Ideal field conditions. No active scour or stream stability issues 5
Footing Exposed Only 4
Footing Undermined (evaluate severity, substrate) 4 or 2
Footing Exposed Plus Constriction, Unstable or Attacking (evaluate severity, substrate) 4 or 2
Bridge Constricts Channel > 10% 4
Bridge Constricts Channel > 10% plus
Unstable or Attacking (evaluate severity, substrate) 4 or 2
Bridge on Unstable Channel with riprap in good condition, size and quantity. 5
Bridge on Unstable Channel with bank erosion and/or damaged riprap protection 4 or 2
Designed countermeasures installed, stable and performing well. 7
Severe scour, abutment failing 1 or 0
None of the above, Needs further review 6 yes (undermined) yes no no yes (undermined) no no no no no no yes no no no no
Fill in no yes
FRANCIS MILL CR. BRIDGE
14 Structure No:
Scour Critical Coding, Item 113
Field Evaluation Guide
Is Footing
Exposed?
no yes
Parameters
Is Channel
Constriction greater than 10%?
no no
Is Flow
Attacking?
no no no no no yes
Fill In
Is Stream
Laterally or
Vertically
Unstable?
no no no no
Fill In yes yes
Fill in
Fill in
Fill in
5.2600 no no
Fill in
Fill in no no
Bank Erosion no no
Other factors
| 2024-10-07T10:15:27-0400 | |
| DAVID RASMUSSEN |
File details come from the government source that posted it. Updated .