01 14 00 work restrictions.pdf

PDF 64 KB Posted

Attached to
Replace Emergency Generator, B213 Project JLSS 21-0002 Federal contract opportunity
Solicitation number
FA671221B0003
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Replace Emergency Generator, B213 Project JLSS 21-0002, newest first.
File Type Posted
sam B213 OF 1419 abstract of offers construction.pdf PDF
Solicitation Amendment FA671221B00030004 SF 30 add b213 Ampere Readings.pdf PDF
B213 Ampere readings.pdf PDF
Gen2.JPG JPG image
Gen4.JPG JPG image
SW3.JPG JPG image
TS1.JPG JPG image
TS3.JPG JPG image
JLSS 11-0013_Sheet 56 of 61_E011_Schedules.pdf PDF
JLSS 11-0013_Sheet 57 of 61_E012_Schedules.pdf PDF
Gen1.JPG JPG image
Gen3.JPG JPG image
Gen5.JPG JPG image
Sw4.JPG JPG image
contracting Only Questions And Answers Responses to Contractors Questions B213.pdf PDF
G-11 Base Composite Utilities 11 X 17 Bldg 213.pdf PDF
JLSS 11-0013_Sheet 58 of 61_FSE1_Schedules of Equipment and Details.pdf PDF
Gen7.JPG JPG image
SW1.JPG JPG image
SW2.JPG JPG image
JLSS 11-0013_Sheet 50 of 61_E006A_Alt Basement Power Plan.pdf PDF
Pgh generator requirements.docx DOCX document
Solicitation Amendment FA671221B00030003 SF 30date extension and pics to 08272021.pdf PDF
Gen6.JPG JPG image
SW5.JPG JPG image
Bid CE RFI responses for B213 Generator.pdf PDF
JLSS 11-0013_Sheet 49 of 61_E006_Basement Power Plan.pdf PDF
JLSS 11-0013_Sheet 51 of 61_E007_First Floor Power Plan.pdf PDF
DavisBacon Act WD PA20210001 mod 8 as of 08062021.txt TXT text file
JB1.JPG JPG image
TS2.JPG JPG image
Solicitation Amendment FA671221B00030002 SF 30 date extension 1.pdf PDF
Solicitation Amendment FA671221B00030001 SF 30.pdf PDF
01 34 00 submittal procedures.pdf PDF
014100 Env Spec Section (Rev 2019 AUG 14).pdf PDF
Solicitation - FA671221B0003.pdf PDF
D-B SOW B213 Generator June 2021.pdf PDF
01 32 00 Construction Progress Documentation.pdf PDF
01 50 00 temporary facilities and controls.pdf PDF
01 59 50 safety requirements.pdf PDF
01 40 00 quality requirements.pdf PDF
01 73 00 closeout procedures.pdf PDF
01 73 89 cutting and patching.pdf PDF
02 41 19 selective demolition.pdf PDF
Attachment to SOW - GENERATOR DESIGN REQUEST.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Bid Set

911th Airlift Wing Work Restrictions 01 14 00 - 1

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.01 CONTRACTOR USE OF PREMISES AND RESPONSIBILITIES

A. Coordinate use of premises under direction of Contracting Officer. Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. Cooperate with 911th Airlift Wing personnel during construction operations to minimize conflicts and facilitate 911th Airlift Wing usage.

1. Limits: Confine construction to areas indicated on construction drawings and/or as designated by the Contracting Officer. Confine storage area as designated by the Contracting Officer.

2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to 911th Airlift Wing employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

3. Perform the work so as not to interfere with 911th Airlift Wing operations.

B. Assume full responsibility for protection and safekeeping of products under this Contract.

C. Work periods may be limited in duration without additional compensation to the Contractor aside from an extension to the performance period for lost time. Work schedule shall be as follows:

1. Normal work hours shall be between 0700 to 1600 (7:00 AM to 4:00 PM), Monday through Friday, with no work on federal holidays.

2. Any deviations from the normal working hours must be approved 3 working days in advance by the Contracting Officer.

D. The Contractor shall be responsible for protecting all remaining permanent equipment.

E. Work is prohibited on UTA training weekends, which typically occurs the first and third weekends each month.

F. Obtain and pay for use of additional storage or work areas needed for operations under this contract.

G. Comfort stations are not provided by 911th Airlift Wing.

Construction Bid Set

911th Airlift Wing Work Restrictions 01 14 00 - 2

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

END OF SECTION