01 01 10 Table Of Contents ADD04_track changes.pdf
PDF 54 KB Posted
- Attached to
- Clatsop County Courthouse Security Project
- Solicitation number
- S-C00040-00011576
- Issued by
- Clackamas County, Amity City, Oregon
About this file
This document is the Table of Contents for Addendum 04 to the bid documents for the Clatsop County Circuit Court Safety Improvements project. The project is being managed by SERA Architects, Inc. for Clatsop County, Oregon. The project covers a variety of construction trades and specifications, including demolition, concrete, carpentry, windows, doors, flooring, painting, plumbing, HVAC, and electrical work. The bid due date is not provided. The project term is not explicitly stated.
The document outlines the pricing and payment procedures, including allowances, unit prices, and alternates. It also covers administrative, quality, and closeout requirements, as well as specific technical sections for the various construction components. The project appears to be funded by Clatsop County, but the specific funding sources and amounts are not detailed in this document.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 2101028.2 CLATSOP COUNTY CIRCUIT COURT PAGE 1
13 SEP08 NOV 2024 SAFETY IMPROVEMENTS SECTION 00 01 10
TABLE OF CONTENTS
SERA Architects, Inc. BID DOCUMENTSADDENDUM 04
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 SEALS PAGE
00 01 10 TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 20 00 PRICE AND PAYMENT PROCEDURES
ARCHITECTURAL BULLETIN (AB) FORM FORM
01 21 00 ALLOWANCES
01 22 00 UNIT PRICES
01 23 00 ALTERNATES
01 26 13 REQUEST FOR INTERPRETATION
RFI SAMPLE FORM FORM
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 35 73 DELEGATED DESIGN PROCEDURES
01 35 91 PERIOD TREATMENT PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 60 00 PRODUCT REQUIREMENTS
SUBSTITUTION REQUEST FORM (DURING BIDDING) FORM
SUBSTITUTION REQUEST FORM (AFTER BIDDING) FORM
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 79 00 DEMONSTRATION AND TRAINING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 54 00 CAST UNDERLAYMENT
DIVISION 04 – MASONRY
NOT USED
DIVISION 05 - METALS
05 50 00 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 00 THERMAL INSULATION
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
PROJECT NO. 2101028.2 CLATSOP COUNTY CIRCUIT COURT PAGE 2
TABLE OF CONTENTS
SERA Architects, Inc. BID DOCUMENTSADDENDUM 04
08 03 53 RESTORATION OF WOOD WINDOWS
08 17 23 PRE-HUNG WOOD DOORS
08 34 53 SECURITY DOORS AND FRAMES MTA/SERA
08 52 00 WOOD WINDOWS
08 56 53 SECURITY WINDOWS
08 71 00 DOOR HARDWARE
HARDWARE GROUPS
08 80 00 GLAZING
DIVISION 09 - FINISHES
09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
09 21 16 GYPSUM BOARD ASSEMBLIES
09 51 00 ACOUSTICAL CEILINGS
09 66 13 PORTLAND CEMENT TERRAZZO FLOORING
09 67 00 FLUID-APPLIED FLOORING
09 68 13 TILE CARPETING
09 90 00 PAINTING AND COATING
DIVISION 10 - SPECIALTIES
10 26 41 BALLISTIC RESISTANT PANELS MTA/SERA
10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES MTA/SERA
10 51 23 PLASTIC LAMINATE-CLAD LOCKERS
DIVISION 11 - EQUIPMENT
NOT USED
DIVISION 12 - FURNISHINGS
12 36 00 COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION THROUGH DIVISION 14 – CONVEYING
EQUIPMENT
NOT USED
DIVISION 21 - FIRE SUPPRESSION
21 00 50 BASIC FIRE SUPPRESSION MATERIALS
AND METHODS
21 10 00 FIRE SUPPRESSION SYSTEMS
DIVISION 22 - PLUMBING
22 00 50 BASIC PLUMBING MATERIALS AND METHODS CEI
22 05 23 VALVES CEI
22 05 29 HANGERS AND SUPPORTS CEI
22 05 53 PLUMBING IDENTIFICATION CEI
22 07 13 PLUMBING INSULTATION CEI
22 11 16 PLUMBING PIPING CEI
22 40 00 PLUMBING FIXTURES CEI
PROJECT NO. 2101028.2 CLATSOP COUNTY CIRCUIT COURT PAGE 3
TABLE OF CONTENTS
SERA Architects, Inc. BID DOCUMENTSADDENDUM 04
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 50 BASIC MECHANICAL MATERIALS AND METHODS CEI
23 05 29 HANGERS AND SUPPORTS CEI
23 05 48 MECHANICAL VIBRATION AND SEISMIC CONTROLS CEI
23 05 53 MECHANICAL IDENTIFICAITON CEI
23 05 93 TESTING, ADJUSTING AND BALANCING CEI
23 07 13 MECHANICAL INSULATION CEI
23 31 13 HVAC DUCTWORK CEI
23 33 00 DUCT ACCESSORIES CEI
23 37 13 DIFFUSERS, REGISTERS AND GRILLES CEI
23 81 26 SPLIT-SYSTEM AIRCONDITIONS CEI
DIVISION 26 - ELECTRICAL
26 01 00 BASIC ELECTRICAL REQUIREMENTS CEI
26 05 00 COMMON WORK RESULTS FOR ELECRICAL CEI
26 05 19 LOW-VOLTAGE ELECTRICAL POWER
CONDUCTORS AND CABLES
CEI
26 05 26 GROUNDING & BONDING FOR ELECTRICAL
SYSTEMS
CEI
26 05 29 HANGERS & SUPPORTS FOR ELECTRICAL
SYSTEMS
CEI
26 05 33 RACEWAYS & BOXES FOR ELECTRICAL
SYSTEMS
CEI
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS CEI
26 24 00 PANELBOARDS CEI
26 27 26 WIRING DEVICES CEI
26 28 16 ENCLOSED SWITCHES & CIRCUIT BREAKERS CEI
26 50 00 LIGHTING CEI
DIVISION 27 - COMMUNICATIONS
27 15 13 COMMUNICATIONS COPPER HORIZONTAL CABLING CEI
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 11 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM CEI
DIVISION 31 - EARTHWORK
NOT USED
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1216 ASPHALT PAVING
32 17 23 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
NOT USED
END OF TABLE OF CONTENTS
File details come from the government source that posted it. Updated .