SS298/Franklin Avenue Utility Relocation
Closed State & local contract opportunity
- Solicitation number
- RFB2025-066
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 75070 Ready-Mix Concrete (See 150-12 For Bagged Concrete)
- 91063 Public Utilities: Water, Sewer And Gas Maintenance And Repair
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91244 Excavation Services
- 91345 Construction, Sewer And Storm Drain
- 91356 Construction, Utility/Underground Projects
- 91360 Construction, Water System/Plants, Main And Service Line
- 91392 Maintenance And Repair, Water System, Main And Service Line
- 91395 Paving/Resurfacing, Highway And Road
- 91430 Concrete
Show all 11
- Point of contact
-
- Christopher Hanchard christopherh@wacotx.gov (254) 750-6640
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The City of Waco, Texas is soliciting bids for the SS298/Franklin Avenue Utility Relocation Project through a Request for Bid (RFB 2025-066), a comprehensive infrastructure improvement initiative. The project involves relocating approximately 7,000 linear feet of water line and 4,000 linear feet of wastewater line along SS 298/Franklin Avenue from U.S. Highway 84 to S. Valley Mills Drive. Contractors must be prequalified and self-perform at least 51% of the project work, with the bid encompassing detailed line items for water and wastewater improvements, including pipe installation, valves, manholes, connections, and surface restoration. The pre-bid meeting is scheduled for September 10, 2025, at 10:00 AM Central Time via Zoom, with prequalification applications due by September 24, 2025. The bid closing and opening are set for November 21, 2025, at 2:05 PM Central Time, and the contract duration is 315 calendar days for substantial completion and 345 calendar days for final completion.
The project requires contractors to submit comprehensive documentation, including safety plans, erosion control plans, and traffic control plans, through the Euna Procurement portal. Contractors must provide performance and payment bonds and meet specific insurance requirements. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the bid emphasizes compliance with state and local regulations. The engineering estimate for the project is $14 million, with liquidated damages of $5,000 per day for delays before substantial completion and $1,000 per day after substantial completion. The bid includes 190 individual line items with specific quantities and units of measurement, covering various infrastructure improvements across different depths and trench types. Contractors will be evaluated based on their ability to meet technical specifications, provide comprehensive pricing, and demonstrate capability to execute the complex utility relocation and improvement project.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity