Professional Engineering Services for Lift Station 2 – Design & Permitting

Closed State & local contract opportunity

Solicitation number
26-ITB-008
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of South Daytona, Florida is soliciting sealed bids for professional engineering services covering design and permitting of resiliency upgrades to Lift Station 2, with bids due August 3, 2026 at 2:00 p.m. Bids are accepted in paper form at City Hall (1672 S. Ridgewood Avenue) or electronically via the City's e-Procurement Portal.

The scope requires the consultant to assess existing site conditions, structural components, mechanical and electrical systems, and hydraulic capacity, then develop design solutions to elevate Lift Station 2's lowest finished floor and all critical electrical and control components to a minimum of two feet above the applicable Base Flood Elevation. The engineer shall design replacement of the existing 60-kW generator (installed 1989) with a new 75-kW permanent generator or other appropriately sized unit as determined through vendor coordination, and design installation of submersible pumps with watertight seals and associated mechanical, structural, and electrical modifications for full system integration. Design shall incorporate flood and wind resiliency measures consistent with a 500-year storm event, comply with National Flood Insurance Program requirements, and meet ASCE 7 wind load criteria. The consultant shall evaluate and identify a suitable generator location, either elevated or relocated outside the Special Flood Hazard Area.

The project is funded through the Hazard Mitigation Grant Program and subject to FEMA procurement guidelines and contract provisions. Bid submission requires completion of multiple statement forms covering vendor qualifications, professional references, subcontractor listings, debarment certification, drug-free workplace preference, public entity crimes statement, and anti-collusion statement. The contract is contingent on compliance with Community Development Block Grant fund requirements as applicable.

Opportunity text

The City of South Daytona, FL is soliciting bids for Professional Engineering Services for Lift Station 2 - Design & Permitting. Sealed paper bids will be accepted in the City Manager's Office, City Hall, located at 1672 S. Ridgewood Avenue, South Daytona, Florida 32119. Bids may be submitted electronically via the City's e-Procurement Portal at https://procurement.opengov.com/portal/southdaytona. Bids will be accepted until 2:00 pm on Monday, August 3, 2026.

Project work includes professional engineering services for the evaluation, engineering, and preparation of construction documents for the resiliency upgrades to Lift Station #2 in support of Hazard Mitigation Grant Program (HMGP) objectives. The Consultant shall assess existing site conditions, structural components, mechanical and electrical systems, and hydraulic capacity, and develop design solutions to elevate the lift station's lowest finished floor and all critical electrical and control components to a minimum of two (2) feet above the applicable Base Flood Elevation. The design shall include the replacement of the existing 60-kW generator, originally installed in 1989, with a new 75-kW permanent generator, or other appropriately sized unit as determined through engineering analysis and coordination with equipment vendors to ensure adequate capacity for continuous operation of critical infrastructure. The Consultant shall also design the installation of submersible pumps equipped with watertight seals and any associated mechanical, structural, and electrical modifications required for full system integration.

Design services shall incorporate flood and wind resiliency measures consistent with a 500-year storm event, including compliance with National Flood Insurance Program (NFIP) requirements and wind load criteria in accordance with ASCE 7. The Consultant shall evaluate and identify a suitable generator location, whether elevated or relocated outside the Special Flood Hazard Area (SFHA), ensuring adequate space for operation, maintenance, and fueling, and compliance with National Electrical Code (NEC) working clearance requirements. The scope shall include preparation of all necessary plans, specifications, technical details, and bid documents; coordination with permitting agencies; and incorporation of all applicable federal, state, and local regulations. The Consultant shall also provide engineering support during bidding, respond to requests for information, and assist with review of contractor submittals to ensure the final design intent is achieved and that the improvements enhance system reliability, prevent future flood-related damage, and maintain uninterrupted wastewater service to the City of South Daytona and the City of Daytona Beach.

Files

File Type Posted
Professional_Engineering_Services_for_Lift_Station_2_–_Design_&_Permitting.pdf PDF
Professional_Engineering_Services_for_Lift_Station_2_–_Design_&_Permitting.pdf PDF
4680-053-R_-_For_Execution_(05-01-26).pdf PDF
4680-053-R_-_For_Execution_(05-01-26).pdf PDF
fema-pugpg_fiscal-year-2025_-_FIRMS_Agree_to_the_Procurement_Guidelines_listed_in_the_attached..pdf PDF
BID_FORM_8F_Statement_of_Vendor_Qualifications.pdf PDF
BID_FORM_8D_Public_Entity_Crimes_Statement.pdf PDF
BID_FORM_8F_Statement_of_Vendor_Qualifications.pdf PDF
Attachment_H_-Certification_Regarding_Debarment,_Suspension,_Ineligibility_And_Voluntary_Exclusion.pdf PDF
fema_contract-provisions-guide_6-14-2021_-_This_is_to_be_followed._FIRMS_agree_to_the_items_within_this_guide..pdf PDF
Attachment_H_-Certification_Regarding_Debarment,_Suspension,_Ineligibility_And_Voluntary_Exclusion.pdf PDF
BID_FORM_8D_Public_Entity_Crimes_Statement.pdf PDF
fema-pugpg_fiscal-year-2025_-_FIRMS_Agree_to_the_Procurement_Guidelines_listed_in_the_attached..pdf PDF
fema_contract-provisions-guide_6-14-2021_-_This_is_to_be_followed._FIRMS_agree_to_the_items_within_this_guide..pdf PDF
BID_FORM_8B__Bid_Form_.pdf PDF
BID_FORM_8E_Anti-Collusion_Statement.pdf PDF
STANDARD_AGREEMENT_FOR_SERVICES.pdf PDF
Community_Development_Block_Grant_Funds.pdf PDF
BID_FORM_8G_Professional_References_for_Previous_Experience.pdf PDF
BID_FORM_8H_Listing_of_Subcontractors.pdf PDF
BID_FORM_8G_Professional_References_for_Previous_Experience.pdf PDF
BID_FORM_8H_Listing_of_Subcontractors.pdf PDF
BID_FORM_8B__Bid_Form_.pdf PDF
BID_FORM_8E_Anti-Collusion_Statement.pdf PDF
STANDARD_AGREEMENT_FOR_SERVICES.pdf PDF
BID_FORM_8C_Drug-Free_Preference_Statement.pdf PDF
Community_Development_Block_Grant_Funds.pdf PDF
BID_FORM_8C_Drug-Free_Preference_Statement.pdf PDF
Show all 28

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity