The City of Murfreesboro is soliciting sealed bids for the Hangar Site Development project (ITB-47-2025) at the Murfreesboro Municipal Airport, located in Rutherford County, Tennessee. The procurement is a comprehensive infrastructure development contract involving site preparation, grading, and utility installation for future hangar locations. Specific project deliverables include excavation of 3,800 cubic yards of unclassified material, 13,900 cubic yards of borrow excavation, installation of 1,740 linear feet of water pipe, 290 linear feet of sanitary sewer pipe, storm drainage structures, fencing, and landscaping. The project requires precise site development with technical specifications for pipe installation, bedding, backfilling, seeding, and sodding. A pre-bid conference is scheduled for June 26, 2025, at 11:00 A.M. in the Airport Terminal conference room, with sealed bids due electronically by July 9, 2025, at 2:00 p.m. local time. Bidders must submit a 5% bid bond and be licensed to work in Tennessee, with evaluation likely based on comprehensive line-item pricing and technical compliance with project specifications. The contract opportunity does not explicitly specify set-aside designations or restrictions for disadvantaged enterprises. Contractors must be licensed in Tennessee and capable of executing complex municipal infrastructure work. The project includes a 5% Owner's Contingency allowance, which requires written approval from the Owner's Representative before implementation. While no incumbent vendors are identified, the project appears to be preparing infrastructure for future airport hangar development. The comprehensive bid form includes 25 specific line items, suggesting a potentially significant project budget, though exact total contract value is not specified. Successful bidders will be required to provide performance and payment bonds for 100% of the contract price. The project involves technical infrastructure development including utility demolition, storm drain installation, hydro-seeding, and comprehensive site preparation to support future airport expansion at the Murfreesboro Municipal Airport.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
_PLANS_Hangar_Development_ITB_47-2025.pdf |
--
| 17MB | 6/13/25 | |
_BID_SPECS_Hangar_Development_ITB_47-2025_06-12-2025rev06-17-2025.pdf | 8MB | 6/17/25 | ||
CAD_file_Hangar_Development_MBT_Site_Grading.dwg | 3MB | Drawing | 7/2/25 | |
_Bid_Form_Hangar_Development_ITB_47-2025_rev_06-17-2025.pdf | 112KB | 6/17/25 |