CS3 CP2000534 26CSP006 Structural and Electrical Repairs
- The University of Texas at Austin is requesting qualifications from architect/engineer firms for a Campus Geological and Hydrogeological Study, with Statement of Qualifications due July 17, 2026 at 2:00 PM Central Standard Time and a pre-submittal conference on June 22, 2026 at 2:00 PM. A VetHUB Subcontracting Plan is a mandatory submittal element for this contract valued at or above $100,000. The scope is to characterize geology and hydrogeology beneath UT Austin's Main Campus, consolidate...
- The Texas Workforce Commission (TWC) issued a Request for Proposal (RFP No. 3202600135) on May 18, 2026, for kitchen cooler remediation services at the Criss Cole Rehabilitation Center (CCRC) located at 4800 North Lamar Boulevard in Austin, Texas. The procurement seeks a qualified contractor to remove an existing single compressor refrigeration system and replace it with a 2-stage compressor system for the kitchen walk-in cooler, including modification to the existing roof curb to accommodate...
- The Texas Department of Criminal Justice, Facilities Division is requesting proposals to replace and install new HVAC systems in inmate housing at the Lopez Unit in Edinburg, Hidalgo County, Texas under RFP 696-FD-26-P022A, with proposals due July 16, 2026 at 3:00 p.m. Central Time and a mandatory pre-proposal conference and site visit on June 18, 2026 at 9:00 a.m. A VetHUB subcontracting plan with a uniform goal of 3.00% across all commodity and service categories is mandatory; all...
- The Texas Health and Human Services Commission (HHSC) Procurement and Contracting Services division is requesting bids for HVAC maintenance and repair services at HHSC Region 3 facilities statewide, with bids due July 7, 2026 at 10:30 a.m. and optional on-site visits June 18–19, 2026. A Historically Underutilized Business (HUB) Subcontracting Plan with a 32.9% VetHUB utilization goal is mandatory; responses without a completed plan will be rejected as non-responsive. The scope encompasses...
- The University of Texas at San Antonio (UTSA) Purchasing Department is requesting proposals under RFP 743-2026-RFP-1474, with proposals due June 18, 2026. All proposals must be submitted electronically through the UTSA RowdyExchange Sourcing Portal at https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=UTSA; UTSA no longer accepts paper submissions. Vendor registration is required prior to submission through https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=UTSA. The...
- Texas A&M University is soliciting sealed proposals for the Wehner Suite 255 Renovations project at the Wehner Building in College Station, Texas, with proposals due July 16, 2026 at 2:00 PM and a pre-proposal meeting scheduled for June 17, 2026 at 10:00 AM. A Historically Underutilized Business (HUB) Subcontracting Plan is required. The scope involves dividing eight existing spaces within Wehner Suite 255 to create 13 offices and one breakroom. Work includes new walls and doors, lighting...
- The Texas Military Department Construction and Facilities Maintenance Office is requesting proposals for the Camp Mabry Parking Lot Expansion project at 2200 W. 35th Street, Austin, Texas, with proposals due July 28, 2026, at 9:00 AM CT and mandatory site visits on June 29 and June 30, 2026. A VetHUB (Veterans Heroes United in Business) subcontracting plan is mandatory; contractors must demonstrate good faith efforts to recruit certified VetHUB subcontractors in building construction, paving and...
- Texas State University is requesting proposals for work on the RF MITTE Rooms 4240 & 4235 Labs project on the San Marcos Campus under Competitive Sealed Proposal (CSP) #754-RF MITTE 4240 & 4235-2026, with proposals due June 18, 2026 at 2:00 p.m. Central Time. Proposals must be submitted through the SciQuest procurement portal using the Texas State supplier login. The sourcing announcement does not disclose scope details, pricing terms, contract duration, or other material contract terms;...
- Texas A&M Engineering Experiment Station (TEES), through SSC Services for Education Facilities Services, is procuring construction services for a facilities upgrade project at the Testing and Characterization Facility in College Station, Texas. This project involves the replacement of all air handling units (AHUs) at the facility except the unit covering the south partition of the building, along with an upgrade to the building automation system to design specifications. The project is...
- University of Texas at Dallas is seeking qualified suppliers to perform as-needed air conditioner repairs and replacements in University Housing units, with proposals due July 16, 2026. The scope covers repair and replacement services for air conditioning equipment in on-campus housing, with equipment selection driven by area-specific needs. The procurement is structured as an as-needed contract, indicating indefinite-quantity demand rather than a fixed-scope project. Place of performance is...
The University of Texas at Austin is requesting proposals for structural and electrical repairs at Central Chilling Station No. 3 (CS3), Contract 26CSP006, with proposals due July 16, 2026. A mandatory VetHUB subcontracting plan demonstrating good-faith effort to recruit and utilize Texas-certified service-disabled veteran businesses is required; responses lacking a completed plan are rejected as material failures to comply. Respondents must divide contract work into reasonable lots and notify a minimum of two certified VetHUBs for each subcontracting opportunity in writing, allowing at least seven business days for response. The subcontracting plan becomes part of the awarded contract and may not be modified without prior written approval from UT Austin's Vendor Management Office. Prime contractors must submit a Prime Contractor Progress Assessment Report with each payment application, documenting all first, second, and third-tier subcontractor payments. The scope encompasses structural and electrical system repairs to a continuously operational university facility. Evaluation criteria assess contractor qualifications (maximum 65 of 100 points), construction team qualifications, technical and management competence, past experience with the University of Texas System, OSHA safety program and record, project execution plan and scheduling, quality control and commissioning program, project close-out capability, and warranty and service support program. Respondents must demonstrate experience on similarly complex facilities maintaining continuous operation during construction, such as universities, hospitals, laboratories, or semiconductor facilities. Both the project superintendent and project manager must maintain current 30-hour OSHA certification. Key personnel must commit to the project for its duration unless an equally qualified substitute receives owner approval. Respondents must provide resumes for all key personnel, subcontractor lists with performance history, customer references from at least three completed projects within the past five years, preliminary Critical Path Method schedules, quality control methodologies, and warranty service plans. The preproposal conference was held June 12, 2026; a second site visit is scheduled June 17, 2026 at 10:00 a.m. at CS3. Questions and addenda requests were due June 23, 2026 at noon. Detailed project drawings and the complete RFP are accessible through UT Box links. Contact UTVETHUB-hsp@austin.utexas.edu for Vendor Management Office inquiries.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
ESBD_522306_1780500483432_Link to RFP CS3 CP2000534 26CSP006.pdf | 22KB | 6/15/26 | ||
ESBD_522306_1780500658401_Section 8.docx | 30KB | Document | 6/15/26 | |
ESBD_522306_1780500766495_Exhibit H with SP and PAR (0526).pdf | 865KB | 6/15/26 | ||
ESBD_522306_1781526236029_26CSP006 Preproposal Sign-in--.pdf | 203KB | 6/15/26 | ||
ESBD_522306_1780500599833_Link to Drawings CS3 CP2000534 26CSP006.pdf | 22KB | 6/15/26 |