Construction - Logan/ Mingo AFRC HVAC System Replacement
- The West Virginia Department of Administration Purchasing Division, on behalf of the Adjutant General's Office, is soliciting bids for complete HVAC system removal and replacement at CFMO Building 1707 (1707 Coonskin Drive, Charleston, Kanawha County, West Virginia) under CRFQ 0603 ADJ2600000022, with bids due July 21, 2026 at 1:30 PM EST. The mandatory pre-bid meeting was held June 17, 2026; vendor technical questions were due June 22, 2026. The scope encompasses demolition of existing boilers,...
- The West Virginia Department of Administration Purchasing Division, on behalf of the Adjutant General's Office, is requesting quotes for replacement of two rooftop units on the Drill Hall in Building 1703 at the JFHQ Coonskin Armory in Charleston, under CRFQ 0603 ADJ2600000023, with bids due July 22, 2026, at 1:30 p.m. EST. The scope includes removal of existing RTUs and installation of two AAON model RN-018-C-A-8 units (18-ton, air-cooled, 206 MBH cooling / 270 MBH natural gas heating,...
- The West Virginia Department of Administration Purchasing Division is requesting quotes for HVAC system replacement at CFMO Building 1707 in Charleston, West Virginia, under CRFQ ADJ2600000022, with bids due July 21, 2026 at 1:30 p.m. EST. The mandatory pre-bid meeting was held June 17, 2026; vendor technical questions were due June 22, 2026. Addendum 4, issued July 13, is the most recent modification. The scope is complete removal of existing HVAC equipment and installation of a new system...
- The West Virginia Department of Administration Purchasing Division is requesting sealed quotations for the replacement of two rooftop units in the Drill Hall at JFHQ Coonskin Armory in Charleston, West Virginia, with bids due July 16, 2026 at 1:30 p.m. EST under CRFQ ADJ2600000023. The mandatory pre-bid meeting was held June 24, 2026; vendor technical questions were due June 30, 2026. The scope includes labor, materials, tools, equipment, supplies, and supervision to remove two existing RTUs and...
- The West Virginia Department of Administration, General Services Division is requesting quotes for the removal and replacement of a rooftop HVAC unit at State Building 88 in Charleston under ARFQ 0211 GSD2700000002, with bids due July 27, 2026 at 10:30 a.m. and a mandatory pre-bid meeting on July 16, 2026 at 10:00 a.m. The scope involves replacing an existing 5-ton heat pump (Model# PHD360000K000C1) with a new unit compatible with the building's Trane Tracer Ensemble building automation...
The West Virginia Department of Administration Purchasing Division, on behalf of the Adjutant General's Office, issued CRFQ 0603 ADJ2600000024 for HVAC system replacement at the Logan/Mingo Armed Forces Readiness Center — a solicitation that has been cancelled as of July 16, 2026, via Addendum 2. The project scope required complete removal of the existing HVAC system and installation of a Variable Refrigerant Flow multi-split system with Mitsubishi Electric and Trane equipment, including 7 outdoor units (capacities 96,000–168,000 BTU/h), 62 indoor units (ceiling cassettes, wall-mounted, and ducted configurations), 7 branch controllers, and approximately 2,839 linear feet of refrigerant piping. Contractors were required to provide all labor, materials, permits, electrical and natural gas connections, direct digital controls (ASI Controls or equivalent), independent air balance certification, eight hours of on-site staff training, and as-built drawings within 30 days of completion. All work must comply with Davis-Bacon and Related Act wage rates, domestic steel/aluminum/glass requirements, and Army Force Protection standards. Contractors were required to have successfully completed at least five similar HVAC projects and provide references demonstrating this experience. The mandatory pre-bid meeting was scheduled for June 30, 2026, at the facility in Holden, West Virginia. Under Addendum 1, the technical question deadline was extended to July 10, 2026, and the bid opening was rescheduled to July 21, 2026, at 1:30 PM EST. Bids were to be submitted as firm fixed lump-sum amounts to the Department of Administration Purchasing Division in Charleston. A 5 percent bid bond was required at submission; apparent successful bidders were to provide 100 percent performance bonds and 100 percent labor/material payment bonds. Liquidated damages of $1,500 per day plus a one-time $1,250 Staff Judge Advocate review fee applied for missed completion dates. The contract award was to go to the lowest qualified responsible bidder and would continue until project completion. Addendum 2, issued July 16, 2026, cancels the entire solicitation with no further modifications. All provisions of the original solicitation and prior addenda remain in full force and effect except as modified by the cancellation notice. Vendors must acknowledge receipt of all addenda, including Addendum 2, to avoid disqualification.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Final_CRFQ_0603_ADJ2600000024_1_WV_CRFQ_FORM.PDF | 732KB | 7/16/26 | ||
Drawings MEP ALL Logan-Mingo.pdf | 1MB | 7/16/26 | ||
CRFQ ADJ26_24 Solicitation Documents.pdf | 23MB | 7/16/26 | ||
Final_CRFQ_0603_ADJ2600000024_3_WV_CRFQ_FORM.PDF | 729KB | 7/16/26 | ||
Addendum 2.pdf | 248KB | 7/16/26 |