CO1433-33 CBP FIS Renovation
Closed State & local contract opportunity Posted
- Solicitation number
- B27000018
- State
- Hawaii
- Responses due
Opportunity facts
- Point of contact
-
- Rachael Hui Jin Park huijin.park@hawaii.gov (808) 587-2139
Opportunity details come from hiepro.ehawaii.gov. Updated .
About this opportunity
The State of Hawaii Department of Transportation Airports Division is requesting proposals for renovation of Customs and Border Protection Federal Inspection Services facilities at Daniel K. Inouye International Airport (HNL), with proposals due August 14, 2026 at 2:00 p.m. HST and a pre-bid conference on July 16, 2026 at 9:00 a.m. HST. Bidders must hold a valid State of Hawaii General Engineering "A" or General Building "B" license at time of bidding, and a minimum of 80 percent of the workforce must consist of Hawaii residents under HRS 103B-3. A five percent bid adjustment for apprenticeship preference applies under HRS 103-55.6.
The scope consolidates secondary screening operations through demolition, renovation, and system upgrades to mechanical, electrical, architectural, security, and telecommunications infrastructure within secured ground-floor areas. Work includes partition installation; flooring, ceiling, and lighting replacements; creation of multiple interview rooms, a CBP holding room, triage podium, and secured vestibules; mechanical equipment installation for exhaust requirements; electrical system upgrades; ATDS-compliant security infrastructure including CCTV, duress alarms, occupancy sensors, and audio/visual recording; and procurement, delivery, and installation of furniture and equipment to support CBP operations. All work must comply with federal, state, and local codes and IBC 2018 standards. Contractor personnel requiring access to secure areas must obtain required security credentials; all security equipment is subject to CBP review and approval.
The estimated construction cost is $2.4 million to $2.7 million. RFI questions and substitution requests are due July 23, 2026 at 2:00 p.m. HST through HIePRO. Bid security of at least five percent of the base bid and additive alternates is required. Proposals must be submitted and uploaded through HIePRO only; original hard copies are not required. The design team includes GHD Inc. (architecture) and Coffman Engineers (mechanical, electrical, and structural engineering).
Opportunity text
The scope of work consists of consolidating the Federal Inspection Services (FIS) Secondary Screening operational areas within the Customs and Border Protection (CBP) facilities at the Daniel K. Inouye International Airport (HNL) through demolition, removal and disposal, renovations, and upgrades to mechanical, electrical, architectural, security, and telecommunications systems, as well as emergency egress improvements and installation of controlled access features. Renovations include modifying existing exterior spaces and secured interior areas, including ceilings, flooring, walls, doors, painting, and lighting. Additionally, scope includes procurement, delivery, and installation of all furniture, equipment, and security equipment necessary to support CBP operational requirements.
Files
| File | Type | Posted |
|---|---|---|
| FINAL ADDENDUM NO 1 CO1433 33.pdf | ||
| FINAL PLANS CO1433 33.pdf | ||
| FINAL SPECIFICATIONS w NTB CO1433 33.pdf |