This document comprises construction plans and specifications for the CBP FIS Renovation project (CO1433-33) at Daniel K. Inouye International Airport in Honolulu, Hawaii, prepared by the State of Hawaii Department of Transportation Airports. The project scope involves consolidating Customs and Border Protection (CBP) secondary screening operations within a secured ground floor area through comprehensive demolition, renovation, and system upgrades. The work encompasses architectural modifications including partition installation, flooring and ceiling replacement, door and lighting upgrades, mechanical equipment installation for interview room exhaust requirements, electrical system upgrades with new interior lighting and conduit work, security infrastructure improvements, and telecommunications provisions. The renovation includes creation of multiple interview rooms, a CBP holding room, triage podium, secured entry vestibules, and a secured corridor system, along with installation of ATDS-compliant security equipment including CCTV cameras, duress alarms, occupancy sensors, and audio/visual recording devices. The construction documents indicate an April 2026 completion date and include 61 sheets of plans covering structural support framing, demolition sequences, architectural layouts, reflected ceiling plans, wall sections, interior elevations, partition details, and finish specifications across multiple building levels.
The project requires continuous coordination with CBP representatives and the designated state representative to maintain airport operations and ensure compliance with federal security requirements and restricted area access protocols. Contractor personnel requiring access to secure areas must obtain required security credentials prior to work commencement, and all security equipment must be submitted for CBP review and approval. The work includes mandatory protection of existing facilities and utilities, coordination of hazardous material abatement if encountered, temporary barriers and signage during construction, and special inspection requirements for structural steel work, high-strength bolting, and welding in accordance with IBC 2018 standards as adopted by Hawaii. The project team includes GHD Inc. for architecture, Coffman Engineers for mechanical, electrical, and structural engineering, with design approval by the State of Hawaii Department of Transportation Director. All contractor work must comply with federal, state, and local codes, and the general contractor bears sole responsibility for work division among subcontractors and field verification of all existing conditions prior to construction commencement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL SPECIFICATIONS w NTB CO1433 33.pdf | ||
| FINAL ADDENDUM NO 1 CO1433 33.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EWA
CONCOURSE
FIRE
STATION
GAT
E
Upolu Airport
Waimea-Kohala Airport
Hilo International Airport
Kalaupapa Airport Molokai Airport
Kahului Airport
Lanai Airport
Hana Airport
Dillingham Airfield
Lihue Airport
Port Allen Airport
Kapalua Airport
Kalaeloa Airport
Daniel K. Inouye International Airport
Ellison Onizuka Kona International Airport At Keahole
HAWAII
MAUI
KAHOOLAWE
LANAI
MOLOKAI
OAHU
KAUAI
NIIHAU
P a c i f i c O c e a n
P a c i f i c O c e a n
North
South
EastWest
NENW
SESW
AIRPORT VICINITY MAP
PROJECT SITE
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
JV JV/AQ JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
PLANS FOR
AT
PROJECT TEAM
ARCHITECTURE:
GHD INC
55 MERCHANT ST
SUITE 1400
HONOLULU, HI 96813
(808) 550-0844
MECHANICAL:
COFFMAN ENGINEERS
745 FORT STREET MALL
SUITE 400
HONOLULU, HI 96813
(808) 687-8884
ELECTRICAL:
COFFMAN ENGINEERS
745 FORT STREET MALL
SUITE 400
HONOLULU, HI 96813
(808) 687-8884
JASON DAVIS
ARCHITECT
NICK ALLDAY
MECHANICAL ENGINEER
JEREMY DOW
ELECTRICAL ENGINEER
DEPARTMENT OF TRANSPORTATION
STATE OF HAWAII
APPROVED:
FOR DIRECTOR OF TRANSPORTATION DATE
STRUCTURAL:
COFFMAN ENGINEERS
745 FORT STREET MALL
SUITE 400
HONOLULU, HI 96813
(808) 687-8884
COLIN T.K. KODAMA
STRUCTURAL ENGINEER
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
G-001
TITLE SHEET
CO1433-33
CBP FIS RENOVATION
2026.04.18
1 61
CBP FIS RENOVATION
PROJECT NO. CO1433-33
CBP FIS RENOVATION
GENERAL ARCHITECTURAL NOTES:
1. DRAWING FORMAT: THESE CONSTRUCTION DOCUMENTS HAVE BEEN PRODUCED
AT DRAWING SCALES THAT RELATE TO THEIR FULL-SIZE FORMAT (22"X34"). ANY
DEVIATIONS TO THIS FORMAT SIZE WILL PRODUCE DRAWINGS OUTSIDE OF THE
SCALE LIMITS INDICATED. DRAWING REPRODUCTIONS AT ANY FORMAT SHOULD
NOT BE SCALED FOR DIMENSIONAL ACCURACY. USE GRAPHIC SCALES
ACCORDINGLY.
2. THE ORGANIZATION OF THESE DRAWINGS IS NOT INTENDED TO CONTROL THE
DIVISION OF WORK AMONG THE SUB-CONTRACTORS. THE DIVISION OF WORK
SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
3. IN CASE OF DIFFERENCE BETWEEN DRAWINGS AND SPECIFICATIONS, THE
SPECIFICATIONS SHALL GOVERN.
4. CONTRACT DOCUMENTS CONSIST OF A COMBINATION OF DRAWINGS AND
SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIREMENTS
CONTAINED THEREIN. SPECIFICATIONS AND DRAWINGS ARE COMPLEMENTARY,
AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL.
PERFORMANCE BY THE GENERAL CONTRACTOR SHALL BE REQUIRED ONLY TO
THE EXTENT CONSISTENT WITH THE CONTRACT DOCUMENTS AND REASONABLY
INFERABLE FROM THEM AS NECESSARY TO PRODUCE THE INTENDED RESULTS.
VARYING LEVEL OF DETAIL BETWEEN DRAWINGS AND SPECIFICATIONS, OR
AMONGST PLANS, ELEVATIONS, SECTIONS, DETAILS, AND SCHEDULES, DOES
NOT CONSTITUTE OMISSION OF INFORMATION, NOR DOES IT RELIEVE THE
GENERAL CONTRACTOR FROM OBLIGATION TO CONTRACT DOCUMENTS.
5. THE INTENT OF THE DRAWINGS IS TO PRODUCE THE INTENDED RESULTS UNDER
RECOGNIZED STANDARDS EVEN IF NOT SHOWN, BUT REASONABLY INFERABLE
THEREFROM. THE CONTRACTOR SHALL CHECK ALL DRAWINGS FURNISHED TO
HIM/HER IMMEDIATELY UPON THEIR RECEIPT AND SHALL PROMPTLY NOTIFY THE
DEPARTMENT OF TRANSPORTATION AIRPORTS (DOTA) OF ANY DISCREPANCIES.
LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE
DRAWINGS, AND DETAILS TAKE PRECEDENCE OVER ALL. THE CONTRACTOR
SHALL COMPARE ALL DRAWINGS AND VERIFY THE DETAILS BEFORE LAYOUT OF
THE WORK.
6. THE CONTRACTOR SHALL VERIFY ALL PROJECT-RELATED NEW AND EXISTING
CONDITIONS, DIMENSIONS, PRIOR TO THE COMMENCEMENT OF WORK
PROMPTLY NOTIFY THE DEPARTMENT OF TRANSPORTATION AIRPORTS (DOTA) IN
WRITING OF ANY DISCREPANCIES. FIELD VERIFICATION AND OBSERVATIONS ARE
RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR
IS RESPONSIBLE FOR COORDINATION OF THE FIELD VERIFIED INFORMATION,
CONFIRMATION THAT THE FIELD VERIFIED INFORMATION IS CORRECT, AND
DISTRIBUTED TO THE APPROPRIATE SUBCONTRACTORS, VENDORS, AND THE
DEPARTMENT OF TRANSPORTATION (DOTA).
7. INFORMATION INDICATED ON THESE DRAWINGS HAS BEEN OBTAINED FROM A
LIMITED AMOUNT OF FIELD INVESTIGATION AND AVAILABLE RESOURCES AT THE
TIME THE DRAWINGS WERE PREPARED. THE GENERAL CONTRACTOR SHALL
VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE JOB SITE. THE
CONTRACTOR SHALL NOTIFY THE TECHNICAL REPRESENTATIVE OF THE
CONTRACTING OFFICE OF ANY DISCREPANCIES, OMISSIONS, AND CONFLICTS
BEFORE COMMENCING WORK.
8. ELECTRONIC PLAN DOCUMENTS FOR USE BY THE GENERAL CONTRACTOR FOR
USE ON THIS SPECIFIC PROJECT WILL BE CONDITIONALLY GRANTED THROUGH
PERMISSION OF THE ARCHITECT UPON SIGNED RELEASE.
9. WORK SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL
CODES, REGULATIONS, AND AUTHORITY HAVING JURISDICTION REQUIREMENTS.
10. CONTRACTOR SHALL MAINTAIN CONTINUOUS OPERATION OF EXISTING
FACILITIES UNLESS SPECIFICALLY APPROVED OTHERWISE BY THE APPROVED
STATE REPRESENTATIVE AND AUTHORIZED CBP REPRESENTATIVE.
PROTECTION OF EXISTING CONDITIONS:
1. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES, UTILITIES,
COMMUNICATIONS SYSTEMS, AND SECURITY INFRASTRUCTURE FROM DAMAGE
DURING CONSTRUCTION.
2. CONTRACTOR SHALL REPAIR OR REPLACE DAMAGE TO EXISTING FACILITIES
CAUSED BY CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO THE STATE.
CBP SECURITY REQUIREMENTS:
1. WORK WITHIN AREAS CONTROLLED BY U.S. CUSTOMS AND BORDER PROTECTION
(CBP) SHALL COMPLY WITH ALL APPLICABLE FEDERAL SECURITY
REQUIREMENTS.
2. CONTRACTOR PERSONNEL REQUIRING ACCESS TO RESTRICTED OR STERILE
AREAS SHALL OBTAIN REQUIRED SECURITY CREDENTIALS PRIOR TO
PERFORMING WORK.
3. ACCESS TO SECURE AREAS MAY REQUIRE ESCORT BY AUTHORIZED PERSONNEL
AS DETERMINED BY CBP OR FACILITY SECURITY.
4. CONTRACTOR SHALL MAINTAIN REQUIRED SEPARATION BETWEEN PUBLIC,
STERILE, AND SECURED ZONES AT ALL TIMES DURING CONSTRUCTION
ACTIVITIES.
5. CONTRACTOR SHALL COORDINATE WORK SEQUENCING TO AVOID
INTERFERENCE WITH CBP INSPECTION, SCREENING, AND PROCESSING
OPERATIONS.
6. PHOTOGRAPHY OR RECORDING WITHIN SECURE AREAS IS PROHIBITED UNLESS
AUTHORIZED BY THE AUTHORIZED STATE REPRESENTATIVE AND AUTHORIZED
CBP REPRESENTATIVE.
COORDINATION AND OPERATIONS:
1. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH THE
AUTHORIZED STATE REPRESENTATIVE, AUTHORIZED CBP REPRESENTATIVE,
AND FACILITY OPERATIONS TO MINIMIZE OPERATIONAL DISRUPTIONS.
2. CONTRACTOR SHALL SCHEDULE IN ADVANCE ALL UTILITY INTERRUPTIONS,
SYSTEM SHUTDOWNS, OR WORK IMPACTING OPERATIONS AS APPROVED BY THE
AUTHORIZED CBP REPRESENTATIVE.
3. CONTRACTOR SHALL MAINTAIN CLEAR ACCESS TO OPERATIONAL SPACES,
EMERGENCY ROUTES, AND REQUIRED CIRCULATION PATHS AT ALL TIMES.
4. CONTRACTOR SHALL PROVIDE TEMPORARY BARRIERS, PROTECTION, AND
SIGNAGE AS REQUIRED TO SAFELY SEPARATE CONSTRUCTION FROM OCCUPIED
SPACES AS APPROVED BY THE AUTHORIZED STATE REPRESENTATIVE.
HAZARDOUS MATERIALS:
1. HAZARDOUS MATERIALS INVESTIGATIONS AND LIMITED SAMPLING ARE
DOCUMENTED IN THE HAZARDOUS MATERIALS REPORT INCLUDED IN THE
PROJECT SPECIFICATIONS. CONTRACTOR SHALL REVIEW AND COMPLY WITH
REPORT FINDINGS AND SPECIFICATIONS REQUIREMENTS.
2. THE HAZARDOUS MATERIALS REPORT REFLECTS CONDITIONS OBSERVED IN
ACCESSIBLE AREAS AT THE TIME OF INVESTIGATION AND NOT INTENDED TO
REPRESENT A COMPREHENSIVE SURVEY OF ALL MATERIALS.
3. IF SUSPECT MATERIALS ARE NOT IDENTIFIED IN THE REPORT ARE
ENCOUNTERED, CONTRACTOR SHALL STOP WORK IN THE AFFECTED AREA AND
NOTIFY THE AUTHORIZED STATE REPRESENTATIVE AND THE DEPARTMENT OF
TRANSPORTATION AIRPORTS ENVIRONMENTAL DIVISION (DOTA AIR-EE).
4. ADDITIONAL SAMPLING OR TESTING SHALL NOT BE PERFORMED WITHOUT PRIOR
WRITTEN AUTHORIZATION FROM TITHE AUTHORIZED STATE REPRESENTATIVE.
SHEET INDEX
SHEET NUMBER SHEET NAME
G-001 TITLE SHEET
G-002 SHEET INDEX
S-001 GENERAL STRUCTURAL NOTES
S-101 EF-8 SUPPORT FRAMING PLANS AND SECTIONS
S-102 EF-9 SUPPORT FRAMING PLANS AND SECTIONS
S-501 CONNECTION DETAILS
A-001 ABBREVIATIONS AND SYMBOLS LEGEND
A-002 ACCESSIBILITY COMPLIANCE AND MOUNTING HEIGHTS
AD101 OVERALL FIRST FLOOR DEMOLITION PLAN
AD102 ENLARGED SECOND FLOOR DEMOLITION PLAN - CBP
AD111 OVERALL FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
AD112 ENLARGED FIRST FLOOR DEMOLITION RCP - CBP
AD113 ENLARGED FIRST FLOOR DEMOLITION RCP - EXTERIOR
AD121 DEMOLITION ROOF PLAN
A-101 OVERALL FIRST FLOOR PLAN
A-102 OVERALL SECOND FLOOR PLAN
A-103 ENLARGED FLOOR PLAN - CBP
A-104 ENLARGED FLOOR PLAN - CBP FLOORING
A-105 ENLARGED FLOOR PLAN - CBP SECURITY PLAN
A-106 ENLARGED FLOOR PLAN - SECOND FLOOR ENTRY
A-111 OVERALL FIRST FLOOR REFLECTED CEILING PLAN
A-112 ENLARGED REFLECTED CEILING PLAN - CBP
A-113 ENLARGED REFLECTED CEILING PLAN - EXTERIOR
A-121 ROOF PLAN
A-301 SECTIONS
A-302 SECTIONS
A-401 PARTITION TYPES
A-402 WALL SECTIONS
A-403 INTERIOR ELEVATIONS
A-404 INTERIOR ELEVATIONS
A-405 INTERIOR ELEVATIONS
A-406 INTERIOR ELEVATIONS
A-407 INTERIOR ELEVATIONS
A-501 DETAILS
A-502 CEILING DETAILS
A-503 STOREFRONT AND DOOR DETAILS
A-504 CASEWORK DETAILS
A-601 FINISH SCHEDULES
A-602 DOOR, STOREFRONT, AND FRAMED ACRYLIC PARTITION SCHEDULE
A-603 SIGNAGE SCHEDULE AND MOUNTING HEIGHTS
A-604 FURNITURE & EQUIPMENT PLAN AND FURNITURE SCHEDULE
A-901 CBP SECONDARY SCREENING
M-001 MECHANICAL LEGEND, ABBREVIATION AND NOTES
MD101 1ST FLOOR MECHANICAL DEMO PLAN
MD102 ROOF MECHANICAL DEMO PLAN
M-101 1ST FLOOR MECHANICAL PLAN
M-102 ROOF MECHANICAL PLAN
M-601 MECHANICAL EQUIPMENT SCHEDULES AND DETAILS
E-001 ABBREVIATIONS, SYMBOLS LEGEND, AND SCHEDULES
E-010 ELECTRICAL NOTES
ED101 OVERALL 1ST FLOOR DEMOLITION PLAN
ED401 1ST FLOOR DEMOLITION FLOOR PLAN
ED402 ENLARGED ROOF DEMOLITION PLAN
ED403 1ST FLOOR DEMOLITION REFLECTED CEILING PLAN
E-101 OVERALL 1ST FLOOR PLAN
E-102 OVERALL 2ND FLOOR PLAN
E-103 OVERALL ROOF PLAN
E-401 ENLARGED POWER AND SIGNAL PLAN
E-402 ENLARGED PLANS
E-403 ENLARGED REFLECTED CEILING PLAN
E-701 PANEL SCHEDULES
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
G-002
SHEET INDEX
CO1433-33
CBP FIS RENOVATION
2026.04.18
2 61
SCOPE OF WORK STATEMENT
DESIGN INTENT IS TO RELOCATE CUSTOMS AND BORDER PROTECTION (CBP) SECURED
SECONDARY SCREENING TO THE GROUND FLOOR.
PROJECT SCOPE FOR CBP SECONDARY SCREENING IS TO CONSOLIDATE CBP'S WORK
AREA WITHIN A SECURED AREA ON THE GROUND FLOOR. WORK AREA WILL INCLUDE CBP
HOLDING ROOM, INTERVIEW COUNTERS, INTERVIEW ROOMS,AND RE-PURPOSING
EXISTING ROOMS. EXISTING ROOMS THAT WILL BE RE-PURPOSED MAY HAVE SOME
RECONSTRUCTION TO MEET SECURITY REQUIREMENTS. THIS PROJECT WILL PROVIDE
AND INSTALL FURNITURE AND EQUIPMENT AS INDICATED.
RENOVATIONS INVOLVE REMOVAL AND REPLACEMENT OF CEILING SYSTEMS, FLOORING,
DOORS, WALLS, INTERIOR LIGHTING, AND ELECTRICAL AND MECHANICAL EQUIPMENT.
EMERGENCY EGRESS WILL BE INCLUDED AND SHALL BE APPROVED BY DOTA FIRE
MARSHAL PRIOR TO CONSTRUCTION. GROUND FLOOR IT ROOM WILL BE INCLUDED IN
SCOPE OF WORK TO ENSURE PROPER CABLING FOR TELECOMMUNICATIONS IS
PROVIDED AS REQUIRED.
MECHANICAL TO PROVIDE NEW EQUIPMENT, DUCTS, AND PIPING AS REQUIRED FOR
INTERVIEW ROOM EXHAUST REQUIREMENTS. PROVIDE ELECTRICAL CONNECTIONS FOR
EQUIPMENT, NEW INTERIOR LIGHTING AND ASSOCIATED CONDUIT BACK TO EXISTING
PANELS.
PROVIDE REQUIRED FURNITURE AND EQUIPMENT AS INDICATED TO SUPPORT CBP
OPERATIONS WITHIN THE SECONDARY SCREENING AREA.
NOTE: ALL SECURITY EQUIPMENT (INCLUDING CCTV CAMERAS, MICROPHONES, DURESS
ALARMS AND RECEIVERS, FURNITURE, OCCUPANCY SENSORS, AND RELATED DEVICES)
SHALL BE SUBMITTED TO THE CBP REPRESENTATIVE FOR REVIEW AND FINAL APPROVAL.
ALL EQUIPMENT SHALL COMPLY WITH ATDS REQUIREMENTS PRIOR TO PROCUREMENT
AND INSTALLATION.
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION.
GENERAL STRUCTURAL NOTES:
STRUCTURAL STEEL:
1. THE CONTRACTOR MUST VERIFY ALL FIELD DIMENSIONS AND CONDITIONS PRIOR TO
STARTING WORK. ALL DISCREPANCIES SHALL BE PROMPTLY REPORTED TO THE
ENGINEER.
2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING
DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT OR STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY WORK SO
INVOLVED.
3. ALL WORK SHALL CONFORM TO THE IBC 2018 AS AMENDED AND ADOPTED BY THE
STATE OF HAWAII.
4. STRUCTURAL DRAWINGS WHERE INDICATED HAVE BEEN DRAWN TO APPROXIMATE
SCALE. UNLESS DRAWING SPECIFICALLY PROVIDES A DIMENSION, THE CONTRACTOR
SHALL NOT USE OR SCALE STRUCTURAL DRAWINGS TO DETERMINE DIMENSIONS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SHORING. THE CONTRACTOR
SHALL PROVIDE TEMPORARY ERECTION BRACING AND SHORING FOR ALL
STRUCTURAL MEMBERS AS REQUIRED FOR STABILITY OF THE STRUCTURE DURING
ALL PHASES OF CONSTRUCTION.
1. ALL STEEL WORK MUST CONFORM TO AISC 360, "SPECIFICATION FOR STRUCTURAL
STEEL BUILDINGS" AS PUBLISHED BY THE AISC.
2. ALL STRUCTURAL WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A-992.
3. STEEL PIPE MUST CONFORM TO ASTM A53, GRADE B. ALL PIPE DIAMETERS NOTED ON
DRAWINGS ARE NOMINAL.
4. OTHER SHAPES AND PLATES MUST CONFORM TO ASTM A-36.
5. ALL WELDS MUST CONFORM AWS D1.1, "STRUCTURAL WELDING CODE-STEEL" OF THE
AMERICAN WELDING SOCIETY AND BE DONE BY CERTIFIED WELDERS.
6. UNLESS NOTED OTHERWISE, ALL BOLTED CONNECTIONS MUST BE MADE WITH ASTM
A325 BOLTS.
7. HOT-DIP GALVANIZE ALL STEEL SHAPES, PLATES AND BOLTS AFTER FABRICATION,
GALVANIZING MUST BE IN ACCORDANCE WITH ASTM A123. TOUCH UP FIELD WELDS
WITH ZINC-RICH PAINT.
8. PRIOR TO FABRICATION, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR
REVIEW. DO NOT BEGIN FABRICATION UNTIL AFTER THE STRUCTURAL ENGINEER HAS
REVIEWED THE SUBMITTAL.
9. DUE TO THE NATURE OF THE WORK, WELDS NOTED ON THE DRAWINGS MAY BE SHOP
OR FIELD WELDS, AT THE CONTRACTORS PREFERENCE.
DESIGN CRITERIA:
1. LIVE LOADS:
ROOF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 PSF
2. RISK CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . III
3. WIND DESIGN DATA:
BASIC WIND SPEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 MPH NOMINAL WIND SPEED. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116 MPH
EXPOSURE CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . C
TOPOGRAPHIC FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0
INTERNAL PRESSURE COEFFICIENT . . . . . . . . . . . . . . . . . . 0.18
2. EARTHQUAKE LOAD CRITERIA:
IMPORTANCE FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.25
MAPPED SPECTRAL ACCELERATIONS . . . . . . . . . . . . . . . . .SS=0.57, S1=0.164
SITE CLASS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D (DEFAULT)
DESIGN SPECTRAL ACCELERATION PARAMETERS . . . . . .SDS=0.511, SD1=0.248
SEISMIC DESIGN CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . D
AB ANCHOR BOLT
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
ALT ALTERNATE, ALTERNATING
ARCH ARCHITECTURAL OR ARCHITECT
ASTM AMERICAN SOCIETY OF TESTING
MATERIALS
BAL BALANCE
BLDG BUILDING
BLKG BLOCKING
BLW BELOW
BM BEAM
BOT BOTTOM
BRG BEARING
BP BRACE POINT
BS BOTH SIDES
BTWN BETWEEN
C CHANNEL
CANT CANTILEVER
CFS COLD FORMED STEEL
CIP CAST-IN-PLACE
CJ CONSTRUCTION, CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECT, CONNECTION
CONT CONTINUOUS
CTR CENTER, CENTERED
DBL DOUBLE
DEG, ° DEGREE
DEMO DEMOLITION
DET DETAIL
DIA, Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIST DISTANCE
DL DEAD LOAD
DN DOWN
DWG DRAWING
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV, EL ELEVATION
EMBED EMBEDMENT, EMBEDDED
EQ EQUAL
EQUIP EQUPMENT
ES EACH SIDE
EW EACH WAY
EXP EXPANSION
EXST, (E) EXISTING
EXT EXTERIOR
FFE FINISH FLOOR ELEVATION
FIN FINISH, FINISHED
FLG FLANGE
FLR FLOOR
FOC FACE OF CONCRETE
FP FULL PENETRATION
FT FOOT, FEET
FTG FOOTING
GA GAGE, GAUGE
GALV GALVANIZE, GALVANIZED
GB GRADE BEAM
GL GRIDLINE
GYP BD GYPSUM BOARD
HDR HEADER
HORIZ HORIZONTAL
HS HIGH STRENGTH
HSB HIGH STRENGTH BOLT
HSS HOLLOW STRUCTURAL SECTION
HT HEIGHT
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCHES
INFO INFORMATION
INT INTERIOR
JT JOINT
KIP 1000 POUNDS
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
L ANGLE, LENGTH
LG LONG
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OH OPPOSITE HAND
OL OUTSIDE LAYER
OPNG OPENING
OPP OPPOSITE
PL PLATE
PREFAB PREFABRICATED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PUR PURLINS
R OR RAD RADIUS
RD ROOF DRAIN
REINF REINFORCEMENT, REINFORCING
REQD REQUIRED
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SMRF SPECIAL MOMENT RESISTING FRAME
SOG SLAB-ON-GRADE
SP SPACE, SPACES
SPECS SPECIFICATION, SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUCT STRUCTURAL
SYMM SYMMETRICAL
T&B TOP AND BOTTOM
TEMP TEMPERATURE STEEL REINFORCEMENT
THK THICK, THICKNESS
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF SLAB, TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSVERSE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
W WIDE, WIDTH
WF WIDE FLANGE
WJ WALL JOINT
WP WORK POINT
WT WEIGHT
SPECIAL INSPECTION:
1. SPECIAL INSPECTION MUST BE PROVIDED IN ACCORDANCE WITH IBC
CHAPTER 17 FOR THE FOLLOWING ITEMS:
STEEL
MATERIAL VERIFICATION
HIGH-STRENGTH BOLTING - BEARING CONNECTIONS
WELDING - FIELD WELDS
2. CONTRACTOR MUST NOTIFY THE SPECIAL INSPECTOR WHEN ITEMS
REQUIRING INSPECTION ARE READY FOR INSPECTION. DO NOT
CONCEAL WORK UNTIL INSPECTIONS HAVE BEEN COMPLETED AND
REMEDIAL WORK COMPLETED.
3. THE OWNER MUST HIRE THE SPECIAL INSPECTOR. DOCUMENTING
INSPECTIONS AND FINAL REPORTING MUST CONFORM TO THE
REQUIREMENTS OF IBC CHAPTER 17.
ABBREVIATIONS:
STATE OF HAWAII
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
DEPARTMENT OF TRANSPORTATION
AIRPORTS
CONSTRUCTION
DOCUMENTS
APRIL 2026
CBP FIS RENOVATION
CO1433-33
2026.04.18
P:
\H
O N
\2 5J
O
BS
\2
O T
D O
TA
-D
O
C
BP
F
IS
R
EN
O \0
.0 D
W G
S\ S\
_S
-0
.D W
G
This work was prepared by me or under my supervision.
DANIEL K. INOUYE INTERNATIONAL AIRPORT
AT
HONOLULU, OAHU, HAWAII
GENERAL
STRUCTURAL
NOTES
3 OF 61 SHEETS
S-001
Licensed Expiration Date 04/30/2028
CBP FIS RENOVATION
GENERAL
STRUCTURAL
NOTES
1' -0
A S-101
EF-8 SUPPORT-TOP FRAMING PLAN
SCALE: 3/4" = 1'-0"
SPRING ISOLATORS
SHOWN DASHED
S-101
S-101
CENTERLINE OF SPRING
ISOLATORS AND PIPE
POSTS BELOW, TYP
B S-101
EF-8 SUPPORT-ROOF LEVEL FRAMING PLAN
SCALE: 3/4" = 1'-0"
VE
R
IF
Y
S-101
S-101
VERIFY
CENTERLINE OF PIPE
POSTS AND SPRING
ISOLATORS ABOVE, TYP
(E) BOX TRUSS
TOP CHORD
(E) BOX TRUSS
TOP CHORD
S-101
EF-8 SUPPORT FRAME SECTION
SCALE: 3/4" = 1'-0"
W 8x
W 8x
PIPE 2 1/2 STD
POST TYP
W8x15 W8x15
(E) BOX TRUSS
BOT CHORD
(E) BOX TRUSS
TOP CHORD
REMOVE (E) STEEL
ROOF DECK AS
REQUIRED TO DO THE
WORK. REPLACE WITH
1 1/2" x 20 GAGE
STEEL ROOF DECK
S-101
EF-8 SUPPORT FRAME SECTION
SCALE: 3/4" = 1'-0"
REMOVE (E) STEEL ROOF
DECK AS REQUIRED TO DO
THE WORK. REPLACE
WITH 1 1/2" x 20 GAGE
STEEL ROOF DECK
(E) STEEL ROOF
DECKING
(E) BOX TRUSS(E) BOX TRUSS
W8x15
W6x12
W6x12
W 6x
W 6x
VE
R
IF
Y
6" TY
P
VERIFY
1' -0
VERIFY
SPRING ISOLATORS,
SEE MECH
W6x15
PIPE 2 1/2 STD
POST TYP
W6x12 W6x12
6" 6"
PIPE 2 1/2 STD
POST TYP
SPRING ISOLATORS,
SEE MECH, TYP
PIPE 2 1/2 STD
POST, TYP
VERIFY
W6x12
W6x15
W6x15
L4x4x1/4L4x4x1/4 L4x4x1/4 L4x4x1/4
S-101
S-101
NOTE:
SEE MECHANICAL PLANS FOR
LOCATION OF EXHAUST FAN
EF-8.
S-101
TYP CONNECTION DETAIL
SCALE: 3" = 1'-0"
1/4
1/4
W8x
PIPE 2 1/2
STD
1 1/4" 1 1/2" 1/2"
1 1/4"
1 1/4"
2"
(2) 5/8" DIA
BOLTS
1/4" PLATE
3/16
W6x
S-101
TYP CONNECTION DETAIL
SCALE: 3" = 1'-0"
W8x
(E) BOX TRUSS TOP
CHORD (L4x3x1/4)
L4x4x1/4
(E) BOX TRUSS
WEB (L2x2x1/4)
BOTH SIDES
OF LEG 1/4
TOP & BOT
OF WEB TO
ANGLE LEG
1/4
BOTH SIDES
OF LEG 1/4
COPE LEG OF ANGLE
5"
3"COPE TOP
AND BOT
FLANGES
W6x
STATE OF HAWAII
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
DEPARTMENT OF TRANSPORTATION
AIRPORTS
CONSTRUCTION
DOCUMENTS
APRIL 2026
CBP FIS RENOVATION
CO1433-33
2026.04.18
P:
\H
O N
\2 5J
O
BS
\2
O T
D O
TA
-D
O
C
BP
F
IS
R
EN
O \0
.0 D
W G
S\ S\
_S
-1
.D W
G
This work was prepared by me or under my supervision.
DANIEL K. INOUYE INTERNATIONAL AIRPORT
AT
HONOLULU, OAHU, HAWAII
EF-8 SUPPORT
FRAMING PLANS AND
SECTIONS
4 OF 61 SHEETS
S-101
EF-8 SUPPORT
FRAMING PLANS AND
SECTIONS
4 OF 61 SHEETS
S-101
3"=1'-0" 12"6"0 3" 9"
41 20 3/4"=1'-0"
Licensed Expiration Date 04/30/2028
CBP FIS RENOVATION
EF-8 SUPPORT
FRAMING PLANS AND
SECTIONS
EF-8 SUPPORT
FRAMING PLANS AND
SECTIONS
VE
R
IF
Y
1' -0
A S-102
EF-9 SUPPORT-TOP FRAMING PLAN
SCALE: 3/4" = 1'-0"
W6x15
W6x15
W 6x
W 6x
E27
E27
E27
SPRING
ISOLATORS
SHOWN DASHED
S-102
S-102
VERIFY 6"
TYP
CENTERLINE OF
SPRING
ISOLATORS AND
PIPE POSTS
BELOW, TYP
B S-102
EF-9 SUPPORT-ROOF LEVEL FRAMING PLAN
SCALE: 3/4" = 1'-0"
VE
R
IF
Y
S-102
S-102
VERIFY
CENTERLINE OF
PIPE POSTS AND
SPRING
ISOLATORS
ABOVE, TYP
(E) BOX TRUSS
TOP CHORD
(E) BOX TRUSS
TOP CHORD
S-102
EF-9 SUPPORT FRAME SECTION
SCALE: 3/4" = 1'-0"
W 8x
W 8x
VERIFY VERIFY
SPRING ISOLATORS,
SEE MECH
PIPE 2 1/2 STD
POST TYP
W6x15
PIPE 2 1/2 STD
POST TYP
W8x15 W8x15
W6x12
W6x12
(E) BOX TRUSS
BOT CHORD
(E) BOX TRUSS
TOP CHORD
REMOVE (E) STEEL
ROOF DECK AS
REQUIRED TO DO THE
WORK. REPLACE WITH
1 1/2" x 20 GAGE
STEEL ROOF DECK 1'
-0
S-102
EF-9 SUPPORT FRAME SECTION
SCALE: 3/4" = 1'-0"
REMOVE (E) STEEL
ROOF DECK AS
REQUIRED TO DO THE
WORK. REPLACE WITH
1 1/2" x 20 GAGE
STEEL ROOF DECK (E) STEEL ROOF
DECKING
(E) BOX TRUSS(E) BOX TRUSS
W8x15
SPRING ISOLATORS,
SEE MECH
PIPE 2 1/2 STD
POST TYP
E
VERIFY
W6x12
W6x15
VERIFY
W6x15
L4x4x1/4 L4x4x1/4L4x4x1/4
L4x4x1/4
S-101
S-101 SIM
NOTE:
SEE MECHANICAL PLANS
FOR LOCATION OF
EXHAUST FAN EF-9.
STATE OF HAWAII
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
DEPARTMENT OF TRANSPORTATION
AIRPORTS
CONSTRUCTION
DOCUMENTS
APRIL 2026
CBP FIS RENOVATION
CO1433-33
2026.04.18
P:
\H
O N
\2 5J
O
BS
\2
O T
D O
TA
-D
O
C
BP
F
IS
R
EN
O \0
.0 D
W G
S\ S\
_S
-1
.D W
G
This work was prepared by me or under my supervision.
DANIEL K. INOUYE INTERNATIONAL AIRPORT
AT
HONOLULU, OAHU, HAWAII
EF-9 SUPPORT
FRAMING PLANS AND
SECTIONS
5 OF 61 SHEETS
S-102
EF-9 SUPPORT
FRAMING PLANS AND
SECTIONS
5 OF 61 SHEETS
S-10241 20
3/4"=1'-0"
Licensed Expiration Date 04/30/2028
CBP FIS RENOVATION
EF-9 SUPPORT
FRAMING PLANS AND
SECTIONS
EF-9 SUPPORT
FRAMING PLANS AND
SECTIONS
UNISTRUT P3000
HDG CHANNEL OR
EQUAL AT TOP AND
BOT OF DUCT
PIPE 2 STD
(E) STEEL DECK
(E) BOX TRUSS
(E) BOX TRUSS
TOP CHORD
(L4x3x1/4)
(E) BOX TRUSS
TOP CHORD
(L4x3x1/4)
1' -0
" M
IN
PIPE 2 STD
VE
R
IF
Y
CONDITION WITH DUCTS PARALLEL TO THE (E) BOX TRUSS CONDITION WITH DUCTS PERPENDICULAR TO THE (E) BOX TRUSS
1/4TYP
UNISTRUT P3000
HDG CHANNEL OR
EQUAL AT TOP
AND BOT OF DUCT
PIPE 2 STD
(E) STEEL DECK
REMOVE AND REPLACE AS
REQ'D TO INSTALL THE
PIPES.
(E) BOX TRUSS
TOP CHORD
(L4x3x1/4)
1' -0
" M
IN
PIPE 2 STD
VE
R
IF
Y
1/4TYP
VERIFY
3/8" DIA U-BOLT, TYP
1/8" CAP PLATE, TYP
3/8" DIA U-BOLT, TYP
1/8" CAP PLATE, TYP
1 1/2"
TYP
REMOVE AND
REPLACE AS REQ'D
TO INSTALL THE
PIPES, TYP
S-501
TYPICAL DUCT SUPPORT FRAMING
NOT TO SCALE
NOTE:
SEE MECHANICAL DRAWINGS FOR
APPROXIMATE LOCATIONS OF DUCT
SUPPORTS. ADJUST LOCATIONS AS
NEEDED TO ALIGN POSTS WITH
EXISTING BOX TRUSS TOP CHORD.
1/4
1' -0
(E) STEEL ROOF
DECKING
PIPE 1 STD
(E) L4x3x1/4 BOX
TRUSS TOP CHORD
1/8" CAP PLATE WITH
HALF-CIRCLE FROM
1/8" DIA STEEL BAR
WELDED TO PIPE
WELD TRHOUGH
(E) DECK
30-DEG MIN, 50-DEG
MAX, BOTH HORZ AND
VERT
1/8" DIA, TYPE 316 SS AIRCRAFT
CABLE. PROVIDE CRIMPS,
TURNBUCKLES, THIMBLE AND
OTHER ACCESSORIES NEEDED TO
INSTALL THE GUY TAUT WITHOUT
OVER TIGHTENING
NOTE:
1. SEE MECHANICAL DRAWINGS FOR
LOCATION OF EXHAUST FAN WITH
STACK.
2. AIRCRAFT WIRE AND ALL THE
COMPONENTS OF THE GUY MUST BE
TYPE 316 STAINLESS STEEL.
3. FOUR GUY WIRES REQUIRED AT EACH
STACK.
S-501
TYP GUY WIRE CONNECTION DETAIL
SCALE: 3" = 1'-0"
STATE OF HAWAII
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
DEPARTMENT OF TRANSPORTATION
AIRPORTS
CONSTRUCTION
DOCUMENTS
APRIL 2026
CBP FIS RENOVATION
CO1433-33
2026.04.18
P:
\H
O N
\2 5J
O
BS
\2
O T
D O
TA
-D
O
C
BP
F
IS
R
EN
O \0
.0 D
W G
S\ S\
_S
-5
.D W
G
This work was prepared by me or under my supervision.
DANIEL K. INOUYE INTERNATIONAL AIRPORT
AT
HONOLULU, OAHU, HAWAII
CONNECTION DETAILS
6 OF 61 SHEETS
S-501
CONNECTION DETAILS
6 OF 61 SHEETS
S-501
3"=1'-0" 12"6"0 3" 9"
Licensed Expiration Date 04/30/2028
CONNECTION DETAILSCONNECTION DETAILS
SYMBOLS LEGEND
ROOM DESIGNATION WALL TYPE
DOOR DESIGNATION GRIDLINE
SIGNAGE DESIGNATION
EXTERIOR ELEVATION DESIGNATION
WINDOW / LOUVER DESIGNATION
DETAIL DESIGNATION
REVISION DESIGNATION
BUILDING SECTION DESIGNATION
PLAN KEYNOTE
INTERIOR ELEVATION DESIGNATION
BREAK LINE
MATCHLINE
NORTH ARROW / PLAN NORTH
DATUM DESIGNATION
TITLE DESIGNATION
XX
XX
1 VIEW NAME 1
A101
SHT_NO
DET_NO
A101
X'XX" AFF CEILING HEIGHT DESIGNATION
XXXX
RM NO
ROOM NAME
XXXX
FURNITURE DESIGNATION
XXx
WALL SECTION DESIGNATION
XX
DET_NO
SHT_NO
SIM
LEVEL NAME
ELEVATION
GRAPHIC SCALE
1t
PLAN
NORTH
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
DETAIL SECTION DESIGNATION
ABBREVIATIONS LEGEND
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTADIENE STYRENE
ABV ABOVE
A/C AIR CONDITIONING
AC ASPHALTIC CONCRETE
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
ADDL ADDITIONAL
ADF ACCESSIBLE DRINKING FOUNTAIN
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AFS ABOVE FINISH SLAB
AGGR AGGREGATE
ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
A
B
BBQ BARBEQUE
BD BOARD
BFF BELOW FINISH FLOOR
BKBD BACK BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOD BOTTOM OF DECK
BOT F BOTTOM FACE
BOT BOTTOM
BR BEDROOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CFCI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CG CORNER GUARD
CMPST COMPOSITE
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COP COPPER
CORR CORRIDOR
CPT CARPET
CSK COUNTERSINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
CULT CULTURED
CW COLD WATER PIPING
D
D DEEP/DEPTH
DBL DOUBLE
DEG DEGREE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E
E EAST
EA EACH
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
ES EACH SIDE
EQ EQUAL
EQUIP EQUIPMENT
EOS EDGE OF SLAB
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
(E) EXISTING
F FAHRENHEIT
FA FIRE ALARM
FAB FABRICATE
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE, FIXTURES AND
EQUIPMENT
FGL FIBERGLASS
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FLR SK FLOOR SINK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIRE PROOF
FR FRAME
FRP FIBERGLASS REINFORCED
PLASTIC
FRT FIRE RETARDANT
FRZ FREEZER
FT FEET
FTD FACIAL TISSUE DISPENSER
FTG FOOTING
FURG FURRING
FUT FUTURE
G NATURAL GAS
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GEN GENERAL
GFGI GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
GFRG GLASSFIBER REINFORCED GYPSUM
GFRC GLASSFIBER REINFORCED CONCRETE
GL GLASS/GLAZING
GLU LAM GLUE LAMINATED WOOD
GPM GALLONS PER MINUTE
GRAN GRANITE
GSB GYPSUM SHEATHING BOARD
GTV GATE VALVE
GWT GLAZED WALL TILE
GYP GYPSUM
GWB GYPSUM WALL BOARD
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HS HAND SINK
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
F
G
H
I
ID INSIDE DIAMETER
INCL INCLUDED
IMP INSULATED METAL PANEL
IN INCH
INFO INFORMATION
INSUL INSULATION/INSULATED
INT INTERIOR
INV INVERT
J-BOX JUNCTION BOX
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCK DOWN
KIT KITCHEN
KO KNOCK-OUT
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LB POUND
LBF/SF POUNDS PER SQUARE FOOT
LDG LANDING
LF LINEAR FOOT
LH LEFT HAND
LKR LOCKER
LLV LONG LEG VERTICAL
LOC LOCATION
LT LIGHT
LR LIVING ROOM
LVR LOUVER
M METER
M2 SQUARE METER
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBR MASTER BEDROOM
MC MEDICINE CABINET
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MI MIRROR
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOULDING
MM MILLIMETER
MO MASONRY OPENING
MOD MODULE
MP METAL PANEL
MR MOISTURE RESISTANT
MTD MOUNTED
MTL METAL
MTG MOUNTING
MULL MULLION
MUN MUNTIN
MW MICROWAVE
N NORTH
NFS NON-FROST SUSCEPTIBLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OBS OBSCURE
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED / OWNER INSTALLED
OFD OVERFLOW DRAIN
OH OVER HANG
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OVHD OVER HEAD
J
K
L
M
N
O
P
PA PUBLIC ACCESS
PC PIECE
PCC PRECAST CONCRETE
PEND PENDANT
PERIM PERIMETER
PH PENTHOUSE
PLAS PLASTER
PLBG PLUMBING
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PROP PROPERTY
PREFAB PREFABRICATE
PT PAINT
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER
AND RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
R RISER
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RB HK ROBE HOOK
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFRIGERATOR
REFL REFLECTED
REG REGISTER
REINF REINFORCE
RECS RECOMMENDATIONS
REQD REQUIRED
RESIL RESILIENT
REST REST ROOM
REV REVISION
RTF RUBBER TILE FLOOR
RFG ROOFING
RLG RAILING
RH RIGHT HAND
RND ROUND
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKET
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCD SEAT COVER DISPENSER
SCP SCUPPER
SCR SHOWER CURTAIN ROD
SCRN SCREEN
SD SMOKE DETECTOR
SECT SECTION
SED SEE ELECTRICAL DRAWINGS
SF SQUARE FEET
SFNT STOREFRONT
SHT SHEET
SHR SHOWER
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SL SLOPE
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPC SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SSD SEE STRUCTURAL DRAWINGS
SST STAINLESS STEEL
SMD SEE MECHANICAL DRAWINGS
SMLS SEAMLESS
SS SOLID SURFACE
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURR SURROUND
SUSP SUSPENDED
SVCE SERVICE
SW SWITCH
SYMM SYMMETRICAL
SYS SYSTEM
Q
R
S
T
T TREAD
TB TOWEL BAR
TBD TO BE DETERMINED
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
T&G TONGUE AND GROOVE
THRES THRESHOLD
THRU THROUGH
THK THICKNESS
TK BD TACK BOARD
TMPD TEMPERED
TOC TOP OF CURB
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TS TUBE STEEL
TSH TOWEL SHELF
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
TLT TOILET
UBC UNIFORM BUILDING CODE
UC UNDERCUT
UNGD UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS OTHERWISE NOTED
UR URINAL
VAR VARIES
VB VALVE BOX
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VOL VOLUME
VP VENEER PLASTER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WIDE
W/ WITH
WC WALL COVERING
WCLR WATER COOLER
WD WOOD
WDSP WASTE DISPOSER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
W/O WITHOUT
WP WATERPROOF / WATERPROOFING
WR WATER REPELLENT
WSCT WAINSCOT
WSP WET STAND PIPE
WT WEIGHT
WWF WELDED WIRE FABRIC
U
V
W
MATERIALS LEGEND
CONCRETESAND, MORTAR, PLASTER,
TILE, BACKER BOARD
EARTH (UNCLASSIFIED FILL)
CLASSIFIED COMPACTED
FILL
EARTH (UNDISTURBED)
CMU
INSULATION - RIGID BOARD
WOOD - FINISHED, TRIM
GYPSUM BOARD
PLYWOOD
INSULATION - BATT
ACOUSTIC CEILING PANEL
STEEL
ALUMINUM
GLAZING, GLASS
CARPET
FLOORING - CERAMIC TILE
OR RESILIENT
DEMOLITION EXISTING (TO REMAIN)
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
A-001
ABBREVIATIONS AND
SYMBOLS LEGEND
CO1433-33
CBP FIS RENOVATION
2026.04.18
7 61
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
FIG. 404.2.4.1
MANEUVERING CLEARANCE AT SWINGING DOORS
(B) FRONT APPROACH, PUSH SIDE (C) HINGE APPROACH, PULL SIDE (D) HINGE APPROACH, PULL SIDE (E) HINGE APPROACH, PUSH SIDE (G) LATCH APPROACH, PUSH SIDE(F) LATCH APPROACH, PULL SIDE
FIG. 404.2.4.2
MANEUVERING CLEARANCE AT SLIDING AND FOLDING DOORS
(A) FRONT APPROACH (B) POCKET OR HINGE APPROACH (C) STOP OR LATCH APPROACH
FIG. 404.2.6
TWO DOORS IN A SERIES
(A) (B)
(1
0)
(1
5)
(1
5)
(610)
(1370)
(A) FRONT APPROACH, PULL SIDE
DOORS AND DOORWAYS
48" MIN. 48" MIN.54" MIN.
M
IN
"M
IN
M
IN
24" MIN.
(A) CIRCULAR (B) T-SHAPED
(A) FORWARD (B) PARALLEL
FIG. 304.3
SIZE OF WHEELCHAIR TURNING SPACE
FIG. 405.5
POSITION OF CLEAR FLOOR OR GROUND SPACE
(1525) (1525)
(305) (915) (305)
(760) (1220)
(9
(1
5)
(7
(1
0)
(A) FORWARD APPROACH (B) PARALLEL APPROACH
FIG. 305.7
MANEUVERING CLEARANCE IN AN ALCOVE
(915) (1525)
(1
0) (7
(X
(X
CLEAR FLOOR SPACE
60" MIN. 60" MIN.
M
IN
48" MIN.
M
IN
30" MIN.
M
IN
M
IN
12" MIN. 36" MIN. 12" MIN.
M
IN
36" MIN. 60" MIN.
M
IN
X
5"
X
4"
(3
(1
0)
FIG. 308.2.1
UNOBSTRUCTED FORWARD REACH
FIG. 308.2.2
OBSTRUCTED HIGH FORWARD REACH
(1
0)
(510) (510-635)
(1
0)
(1
0)
(255)
FIG. 308.3.1
UNOBSTRUCTED SIDE REACH
FIG. 308.3.2
OBSTRUCTED HIGH SIDE REACH
(610)
(1
0)
REACH RANGES
M
IN
M A
X
M A
X
20" MAX.
M A
X
(1
0)
20" - 25"
M A
X
M A
X
10" MAX.
M A
X
24" MAX.
FIG. 602.5
DRINKING FOUNTAIN SPOUT LOCATION
(A) PARALLEL APPROACH (B) FORWARD APPROACH
(380)(125)
(90)
FIG. 609.3
SPACING OF GRAB BARS
(38)
(3
15" max.5" max.
3 1/2" max.
m in
. 1 1/2"
M
IN
18" MIN 12" MIN 48
M
IN
36" MIN 60
M
IN
42" MIN 54
M
IN
M
IN
54" MIN
M
IN
24" MIN
M
IN
24" MIN
(1220) 4' - 0"
(1220) 4' - 0"
LEGEND - ACCESSIBILITY COMPLIANCE
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
A-002
ACCESSIBILITY
COMPLIANCE AND
MOUNTING HEIGHTS
CO1433-33
CBP FIS RENOVATION
2026.04.18
8 61
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
A
E
F
B
C
D
E26E28 E27E30 E29E32 E31E34 E33E35E36E37E38
D
E
E.2
E.5
F
UP
UP
C1
AD102
24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0"
0"
D00
CUSTOMS
INSPECTION AREA
BAGGAGE CLAIM
MEN RR WOMEN RR
E25
DEMOLITION SCOPE
LEGEND:
ROOM DESIGNATION
EXIST CONSTRUCTION TO
REMAIN
ROOM
NAME
ARCHITECTURAL DEMOLITION NOTES
1. VISIT THE SITE WITH SUBCONTRACTORS PRIOR TO SUBMITTING A PROPOSAL TO BECOME FAMILIAR WITH ALL EXISTING FIELD CONDITIONS AND REPORT ANY DISCREPANCIES TO THE DESIGNATED STATE
REPRESENTATIVE.
2. PROVIDE ALL NECESSARY PROTECTION MEASURES TO SAFEGUARD THE PUBLIC, SURROUNDING BUILDINGS, AND AIRPORT OPERATIONS DURING CONSTRUCTION ACTIVITIES.
3. VERIFY THE LOCATION OF ALL EXISTING UNDERGROUND AND OVERHEAD UTILITIES TO SAFEGUARD AGAINST THE INTERRUPTION OF SERVICES TO THE PUBLIC AND AIRPORT.
4. STATE HAS THE FIRST RIGHT OF REFUSAL OF ALL SALVAGEABLE ITEMS. ALL EXISTING PERSONAL PROPERTY TO BE REMOVED BY OTHERS PRIOR TO DEMOLITION. ALL REMAINING ITEMS ARE PROPERTY OF THE
STATE. GENERAL CONTRACTOR SHALL COORDINATE WITH STATE THE SALVAGE OF FIXTURES, FURNISHINGS, DOORS, AND MISCELLANEOUS EQUIPMENT.
5. WHILE AN ATTEMPT HAS BEEN MADE TO SHOW THE FULL EXTENT OF ITEMS TO BE DEMOLISHED AND REMOVED, IT IS THE RESPONSIBILITY OF CONTRACTOR TO CONDUCT ON-SITE EXAMINATIONS AND FAMILIARIZE
THEMSELVES WITH THE ACTUAL SITE CONDITIONS. ADDITIONAL ITEMS, NOT SHOWN TO BE REMOVED, INTERFERING WITH THE COMPLETE REMOVAL OF THE EXISTING BUILDING COMPONENTS, SHALL BE REMOVED
WITHOUT ADDITIONAL COSTS TO THE STATE.
6. THE SITE HAS THE LIKELIHOOD TO IDENTIFY THE PRESENCE OF HAZMAT, AND HAS SUBSEQUENTLY BEEN CLEARED FOR THE AREAS OF WORK - CARE SHOULD BE EXERCISED IN THE REMOVAL OF WORK TO PREVENT THE RELEASE OF TOXIC SUBSTANCES. SHOULD TOXIC SUBSTANCES, SUCH AS ASBESTOS BE ENCOUNTERED, THE OWNER AND ARCHITECT SHALL BE NOTIFIED. UPON AUTHORIZATION, THE DISPOSAL OF SAME SHALL CONFORM TO ALL GOVERNING CODES AND REGULATIONS. DISPOSAL SHALL BE DONE ONLY BY CONTRACTORS LICENSED FOR THIS WORK.
7. DURING DEMOLITION AND CONSTRUCTION OPERATIONS, PROVIDE ALL NECESSARY PROTECTION AND SAFE PASSAGE FOR THE PUBLIC. SUCH AS BUT NOT LIMITED TO: BARRICADES, TEMPORARY PARTITIONS, DUST BARRIERS, SIGNS, ETC. ERECT AND MAINTAIN THESE BARRIERS TO THE SATISFACTION OF THE STATE AND ARCHITECT AND ALL APPLICABLE RULES AND REGULATIONS.
8. TAKE PRECAUTIONS AS TO MINIMIZE DAMAGE TO ITEMS TO REMAIN, INCLUDING ALL UTILITIES. DURING DEMOLITION AND CONSTRUCTION OPERATIONS, ITEMS NOT SPECIFICALLY NOTED FOR REMOVAL THAT ARE DAMAGED, SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE STATE.
1/16" = 1'-0"AD101
1 OVERALL FIRST FLOOR DEMOLITION PLAN
KEYNOTES
D00 REFER TO ENLARGED PLAN FOR DEMOLITION SCOPE NOTES
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
AD101
OVERALL FIRST
FLOOR DEMOLITION
PLAN
CO1433-33
CBP FIS RENOVATION
2026.04.18
9 61
0' 8' 16' 32'
N
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
ENLARGED DEMOLITION PLAN NOTES
1. REFER TO SHEET G-002 FOR GENERAL PROJECT NOTES
2. REFER TO SHEET AD101 FOR GENERAL ARCHITECTURAL DEMOLITION
NOTES.
3. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL
DWGS FOR ADDITIONAL DEMOLITION INFORMATION AND WORK.
4. COORDINATE REMOVAL AND ABATEMENT OF HAZARDOUS AND
ASBESTOS CONTAINING MATERIALS IF FOUND.
5. COORDINATE REMOVAL, DISPOSAL, AND / OR RELOCATION OF EXISTING
FURNITURE WITH DESIGNATED STATE REPRESENTATIVE.
6. COORDINATE REMOVAL AND DISPOSAL OF EXISTING FIXTURES,
EQUIPMENT, AND OTHER BUILDING COMPONENTS INDICATED FOR
DEMOLITION. REFER TO ELECTRICAL, MECHANICAL, PLUMBING, AND
STRUCTURAL DWGS FOR ADDITIONAL DEMOLITION INFORMATION.
7. REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN
CORRESPOND TO REFERENCE ELEVATION [0'-0"] FOR THIS FLOOR LEVEL.
DEVIATIONS AND VARIANCES IN THIS ELEVATION MAY EXIST.
8. EXISTING EQUIPMENT TO REMAIN: CONTRACTOR TO PROTECT EXISTING
EQUIPMENT TO REMAIN FROM ENVIRONMENT DURING THE DURATION OF
CONSTRUCTION.
DEMOLITION SCOPE
LEGEND:
ROOM DESIGNATION
EXIST CONSTRUCTION TO
REMAIN
ROOM
NAME
E26E28 E27E29
E.2
E.5
ELEV #3
ELEC RM
1-27
EXISTING OFFICE #2
1-26
EXISTING OFFICE #1
1-12
TRASH RM
1-24
INTERVIEW RM #6
1-23
SEARCH ROOM
1-22
STORAGE
1-21
SECURED
RESTROOM
1-20
EXISTING OFFICE #3
D14
D15 D15
D03
D15
D05
D40
D40
D40D39
D01
D03
D33
D34
D33
D07
TYP.
S
IN
G
LE
P A
N E
L
D08
D33
D33
D07
1-25
INTERVIEW RM #7
1-40
CUSTOMS
INSPECTION AREA
1-40
CUSTOMS
INSPECTION AREA
24' - 0" 24' - 0" 24' - 0"
D03
D03
D03
D03
D06
D08
D34 D34 D34
D34
D34
D34
D08 D08 D08
EXIST WORK AREA
EXIST INSPECTION AREA
EXIST HALLWAY
1-19
SECURED
CORRIDOR #1
1-43
SECURED
CORRIDOR #3
EXIST LANDINGEXIST STAIR FROM 2F
EXIST ESCALATOR FROM 2F
D15
D05 D40
KEYNOTES
D01 REMOVE 42" (VIF) PRECAST CONC. PANEL - PREP FLOOR FOR
FLOORING INSTALLATION
D03 REMOVE FURRING OR PARTITION AS INDICATED INCLUDING
WALL FINISHES - REMOVE INSULATION AND WALL BASE AS
OCCURS
D05 REMOVE DOOR, DOOR FRAME, AND ALL ASSOCIATED
HARDWARE - REMOVE THRESHOLDS AND TRANSITION STRIPS
D06 REMOVE WINDOW, WINDOW FRAME, TRIM, BLINDS, DRAPES,
AND ANY ASSOCIATED HARDWARE
D07 REMOVE FINISH TO FACE OF STUD
D08 REMOVE FLOORING, BASE , GROUT, MORTAR AND ADHESIVE
FROM EXIST CONC SLAB
D14 UNINSTALL HANDRAIL AND ASSOCIATED HARDWARE -
COORDINATE WITH DESIGNATED STATE REPRESENTATIVE FOR
FINAL STORAGE LOCATION OR DISPOSAL
D15 UNINSTALL AIRPORT EQUIPMENT AND ALL ASSOCIATED
HARDWARE - COORDINATE WITH DESIGNATED STATE
REPRESENTATIVE FOR FINAL STORAGE LOCATION OR
DISPOSAL
D33 EXIST AIRPORT EQUIPMENT TO BE RELOCATED BY DOTA
D34 EXIST FURNITURE TO BE RELOCATED BY DOTA
D39 EXIST WINDOW TO REMAIN - PROTECT IN PLACE
D40 EXIST DOOR TO REMAIN - PROTECT IN PLACE
1/4" = 1'-0"AD102
1 ENLARGED DEMOLITION FLOOR PLAN
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
AD102
ENLARGED SECOND
FLOOR DEMOLITION
PLAN - CBP
CO1433-33
CBP FIS RENOVATION
2026.04.18
10 61
N
0" 4' 8' 16'
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
E26E28 E27E30 E29E32 E31E34 E33E35E36E37E38
D
E
E.2
E.5
F
G
AD112
D00
24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0"
0"
AD113
D00
E25 E24
DEMOLITION SCOPE
LEGEND:
ROOM DESIGNATION
EXIST CONSTRUCTION TO
REMAIN
ROOM
NAME
ARCHITECTURAL RCP DEMOLITION NOTES
1. REFER TO SHEET G-002 FOR GENERAL PROJECT NOTES.
2. REFER TO SHEET AD101 FOR GENERAL ARCHITECTURAL DEMOLITION NOTES.
3. REFER TO ENLARGED DEMOLITION PLANS FOR ADDITIONAL INFORMATION.
4. COORDINATE REMOVAL AND ABATEMENT OF HAZARDOUS AND ASBESTOS CONTAINING MATERIALS.
5. COORDINATE REMOVAL OF FURNITURE, FIXTURES, AND EQUIPMENT WITH DESIGNATED STATE REPRESENTATIVE AND
DESIGNATED CBP REPRESENTATIVE. REFER TO MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL DWGS FOR
ADDITIONAL DEMOLITION INFORMATION AND WORK.
6. FIELD VERIFY ALL DIMENSIONS AND VERTICAL CONTROL PRIOR TO THE COMMENCEMENT OF WORK. PROMPTLY NOTIFY THE DESIGNATED STATE REPRESENTATIVE OR CONTRACTING OFFICER IN WRITING OF ANY DISCREPANCIES IN NEW AND / OR EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL ABOVE CEILING WORK.
7. ALL CEILING LAYOUT PLANS SHOW MOST MAJOR MECHANICAL AND ELECTRICAL DEVICES. SEE MECHANICAL AND ELECTRICAL DWGS FOR ADDITIONAL MECHANICAL AND ELECTRICAL DEVICES INCLUDED IN THE CEILING CONFIGURATION.
8. PROVIDE TEMPORARY LATERAL SUPPORT AND UPLIFT RESTRAINT AT ALL SUSPENDED EQUIPMENT TO REMAIN AS REQUIRED FOR CEILING REPLACEMENT. COORDINATE LOCATIONS WITH ABOVE CEILING DEVICES AND RELATED
CLEARANCES. REFER TO ELECTRICAL AND MECHANICAL DWGS FOR ADDITIONAL INFORMATION.
9. CONTRACTOR TO PROTECT EXISTING EQUIPMENT TO REMAIN FROM THE ENVIRONMENT DURING THE DURATION OF
CONSTRUCTION.
1/16" = 1'-0"AD111
1 OVERALL FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
KEYNOTES
D00 REFER TO ENLARGED PLAN FOR DEMOLITION SCOPE NOTES
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
AD111
OVERALL FIRST
FLOOR DEMOLITION
REFLECTED CEILING
PLAN
CO1433-33
CBP FIS RENOVATION
2026.04.18
11 61
N
0' 8' 16' 32'
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
E26E28 E27E29
E.2
E.5
D42
D42
D42
D12
D12
D03 D12
D12
TYP
D43
D07
D42
D01
D07
8' - 0" AFF8' - 0" AFF 8' - 0" AFF 8' - 0" AFF
7' - 9" AFF
7' - 9" AFF
7' - 9" AFF
24' - 0" 24' - 0" 24' - 0"
7' - 9" AFF
8' - 2" AFF
D43
EXIST SOFFIT
1' - 7 1/4"
10 1/2"
5'
D42 D42 D42 D42
8' - 0" AFF8' - 0" AFF
8' - 10" AFF
8' - 10" AFF
D23TYP
1-27
EXISTING OFFICE #2
1-26
EXISTING OFFICE #1
1-12
TRASH RM
1-24
INTERVIEW RM #6
1-23
SEARCH ROOM
1-22
STORAGE
1-21
SECURED
RESTROOM
1-20
EXISTING OFFICE #3
1-25
INTERVIEW RM #7
1-40
CUSTOMS
INSPECTION AREA
1-40
CUSTOMS
INSPECTION AREA
EXIST WORK AREA
EXIST INSPECTION AREA
EXIST HALLWAY 1-19
SECURED
CORRIDOR #1
1-43
SECURED
CORRIDOR #3
EXIST LANDING
D12
D12
EXIST SOFFIT TO
REMAIN - PROTECT
IN PLACE
DEMOLISH AND REMOVE
EXIST WD CEILING TO
CONTROL JOINT
TYP
D23
D23
ENLARGED DEMOLITION PLAN NOTES
1. REFER TO SHEET G-002 FOR GENERAL PROJECT NOTES
2. REFER TO SHEET AD101 FOR GENERAL ARCHITECTURAL DEMOLITION
NOTES.
3. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL
DWGS FOR ADDITIONAL DEMOLITION INFORMATION AND WORK.
4. COORDINATE REMOVAL AND ABATEMENT OF HAZARDOUS AND
ASBESTOS CONTAINING MATERIALS IF FOUND.
5. COORDINATE REMOVAL, DISPOSAL, AND / OR RELOCATION OF EXISTING
FURNITURE WITH DESIGNATED STATE REPRESENTATIVE.
6. COORDINATE REMOVAL AND DISPOSAL OF EXISTING FIXTURES,
EQUIPMENT, AND OTHER BUILDING COMPONENTS INDICATED FOR
DEMOLITION. REFER TO ELECTRICAL, MECHANICAL, PLUMBING, AND
STRUCTURAL DWGS FOR ADDITIONAL DEMOLITION INFORMATION.
7. REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN
CORRESPOND TO REFERENCE ELEVATION [0'-0"] FOR THIS FLOOR LEVEL.
DEVIATIONS AND VARIANCES IN THIS ELEVATION MAY EXIST.
8. EXISTING EQUIPMENT TO REMAIN: CONTRACTOR TO PROTECT EXISTING
EQUIPMENT TO REMAIN FROM ENVIRONMENT DURING THE DURATION OF
CONSTRUCTION.
DEMOLITION SCOPE
LEGEND:
ROOM DESIGNATION
EXIST CONSTRUCTION TO
REMAIN
ROOM
NAME
1/4" = 1'-0"AD112
1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - CBP
KEYNOTES
D01 REMOVE 42" (VIF) PRECAST CONC. PANEL - PREP FLOOR FOR
FLOORING INSTALLATION
D03 REMOVE FURRING OR PARTITION AS INDICATED INCLUDING WALL
FINISHES - REMOVE INSULATION AND WALL BASE AS OCCURS
D07 REMOVE FINISH TO FACE OF STUD
D12 REMOVE LIGHT FIXT AND ASSOCIATED WIRING AND CONDUIT -
REFER TO ELEC DWGS
D23 REMOVE EXIST CEILING SYSTEM INCLUDING FINISH, FRAMING,
GRID, SUPPORTS, AND HANGERS
D42 EXIST CEILING TO REMAIN - PROTECT IN PLACE
D43 EXIST LIGHT FIXT AND ASSOCIATED WIRING AND CONDUIT TO
REMAIN - PROTECT IN PLACE - REFER TO ELEC DWGS
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
AD112
ENLARGED FIRST
FLOOR DEMOLITION
RCP - CBP
CO1433-33
CBP FIS RENOVATION
2026.04.18
12 61
N
0" 4' 8' 16'
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
ENLARGED DEMOLITION PLAN NOTES
1. REFER TO SHEET G-002 FOR GENERAL PROJECT NOTES
2. REFER TO SHEET AD101 FOR GENERAL ARCHITECTURAL DEMOLITION
NOTES.
3. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL
DWGS FOR ADDITIONAL DEMOLITION INFORMATION AND WORK.
4. COORDINATE REMOVAL AND ABATEMENT OF HAZARDOUS AND
ASBESTOS CONTAINING MATERIALS IF FOUND.
5. COORDINATE REMOVAL, DISPOSAL, AND / OR RELOCATION OF EXISTING
FURNITURE WITH DESIGNATED STATE REPRESENTATIVE.
6. COORDINATE REMOVAL AND DISPOSAL OF EXISTING FIXTURES,
EQUIPMENT, AND OTHER BUILDING COMPONENTS INDICATED FOR
DEMOLITION. REFER TO ELECTRICAL, MECHANICAL, PLUMBING, AND
STRUCTURAL DWGS FOR ADDITIONAL DEMOLITION INFORMATION.
7. REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN
CORRESPOND TO REFERENCE ELEVATION [0'-0"] FOR THIS FLOOR LEVEL.
DEVIATIONS AND VARIANCES IN THIS ELEVATION MAY EXIST.
8. EXISTING EQUIPMENT TO REMAIN: CONTRACTOR TO PROTECT EXISTING
EQUIPMENT TO REMAIN FROM ENVIRONMENT DURING THE DURATION OF
CONSTRUCTION.
DEMOLITION SCOPE
LEGEND:
ROOM DESIGNATION
EXIST CONSTRUCTION TO
REMAIN
ROOM
NAME
E26
E
D1
E25 E24
24' - 0" 24' - 0"
0"
D12
D50
D51
D52
D53
D54
D56
D55
D56
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
AD113
ENLARGED FIRST
FLOOR DEMOLITION
RCP - EXTERIOR
CO1433-33
CBP FIS RENOVATION
2026.04.18
13 61
KEYNOTES
D12 REMOVE LIGHT FIXT AND ASSOCIATED WIRING AND CONDUIT - REFER
TO ELEC DWGS
D50 DEMOLISH AND REMOVE EXIST WD CEILING TO CONTROL JOINT
D51 EXIST SOFFIT TO REMAIN - PROTECT IN PLACE
D52 UNINSTALL AND STORE EXIST WD PLANK CEILING FINISH AND LIGHTING
FOR REINSTALLATION - EXTENT AS REQUIRED FOR INSTALLATION OF
NEW EXHAUST DUCTWORK
D53 UNINSTALL AND STORE EXIST RECESSED LIGHTING FOR
REINSTALLATION
D54 DEMOLISH AND REMOVE GYP BD CEILING AS REQUIRED TO INSTALL
NEW EXHAUST DUCTWORK
D55 PROVIDE ROUTE FOR EXHAUST DUCTWORK ABOVE EXIST SOFFIT
FRAMING - PRESERVE LOWER SOFFIT IN PLACE
D56 UNINSTALL SOFFIT LIGHT FIXTURES - STORE FOR REUSE
1/4" = 1'-0"AD113
1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - EXTERIOR
N
0' 2' 4' 8'
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
M
ARCHITECTURAL DEMOLITION ROOF PLAN NOTES
1. REFER TO SHEET G-002 FOR GENERAL PROJECT NOTES.
2. REFER TO SHEET AD101 FOR GENERAL ARCHITECTURAL DEMOLITION NOTES.
3. REFER TO ENLARGED DEMOLITION PLANS FOR ADDITIONAL INFORMATION.
4. FIELD VERIFY ALL DIMENSIONS AND VERTICAL CONTROL PRIOR TO THE COMMENCEMENT OF WORK.
PROMPTLY NOTIFY THE DESIGNATED STATE REPRESENTATIVE IN WRITING OF ANY DISCREPANCIES IN NEW AND/OR EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL ABOVE
CEILING WORK.
5. PROVIDE TEMPORARY LATERAL SUPPORT AND UPLIFT RESTRAINT AT ALL SUSPENDED EQUIPMENT TO REMAIN AS REQUIRED FOR CEILING AND ROOF WORK. COORDINATE LOCATIONS WITH ABOVE CEILING DEVICES AND RELATED CLEARANCES. REFER TO STRUCT, ELEC, AND MECH DWGS FOR ADDITIONAL
DEMOLITION INFORMATION.
6. PROTECT EQUIPMENT INDICATED TO REMAIN FROM THE ENVIRONMENT DURING THE DURATION OF
CONSTRUCTION.
7. COORDINATE REMOVAL AND ABATEMENT OF HAZARDOUS AND ASBESTOS CONTAINING MATERIALS.
8. COORDINATE REMOVAL AND DISPOSAL OF FURNITURE, FIXTURES, AND EQUIPMENT WITH DESIGNATED
STATE REPRESENTATIVE - REFER TO STRUCT, ELEC, MECH, AND PLUMB DWGS FOR ADDITIONAL
DEMOLITION INFORMATION.
DEMOLITION SCOPE
LEGEND:
ROOM DESIGNATION
EXIST CONSTRUCTION TO
REMAIN
ROOM
NAME
E26E28 E27E30 E29E32 E31E34 E33E35E36E37E38
E
E.2
E.5
F
G
G.2
G.5
E25 E24
EF-7
(NOT IN
SCOPE)
EF-5
(NOT IN
SCOPE)
DEMOLISH AND REMOVE EXIST
EF-8 - ROOF CURB TO BE
MODIFIED FOR DUCTWORK
AND EF INSTALLATION - REFER
TO MECH DWGS
24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0"
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
JV AQ/JV JV/EE/MM JD
SHEETSOF
CONSTRUCTION
DOCUMENTS
APRIL 2026
AD121
DEMOLITION ROOF
PLAN
CO1433-33
CBP FIS RENOVATION
2026.04.18
14 61
0' 8' 16' 32'
N
1/16" = 1'-0"AD121
1 DEMOLITION ROOF PLAN
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
E
E.2
E.5
F
G
1-40
1-11
ELEV #3
1-12
1-12A
1-13
1-36
1-34
1-35
1-33
1-26
1-27
UP
UP
1-22 1-21
1-20
1-25 1-24
1-23
1-32
1-39
1-19
N00
C1
A-301
A-301
A-302
1-44
24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0"
A-103
1-30
1-29
1-16 1-14
1-31
1-17
1-15
0"
1-28
A-301
A-301
A-302
1-37
1-38
1-42
ELEV E1
ELEV E2
E25 E24
1-43 1-41
NEW
CONSTRUCTION
LEGEND:
ROOM TAG W/
NUMBER
MATCHLINE
PARTITION TYPE
TAG - REFER TO
PARTITION TYPES
DOOR DESIGNATION -
REFER TO DOOR
SCHED
EXIST CONSTRUCTION
TO REMAIN
P-X
XXXX
ROOM NAME
GENERAL ARCHITECTURAL NOTES
1. PROVIDE…