FINAL ADDENDUM NO 1 CO1433 33.pdf
PDF 3 MB Posted
- Attached to
- CO1433-33 CBP FIS Renovation
- Solicitation number
- B27000018
- Issued by
- Hawaii
About this file
This is Addendum No. 1 to the solicitation for CBP FIS Renovation at Daniel K. Inouye International Airport, issued by the State of Hawaii Department of Transportation Airports Division on August 13, 2026. The addendum postpones the bid opening from August 14, 2026 at 2:00 p.m. HST to August 28, 2026 at 2:00 p.m. HST and modifies project specifications and plans. The scope consolidates Federal Inspection Services secondary screening operations through demolition, renovation, and system upgrades including mechanical, electrical, architectural, security, and telecommunications infrastructure. Work encompasses partition installation, flooring, ceiling and lighting replacements, creation of interview rooms, CBP holding rooms, triage podiums, and secured vestibules, along with mechanical equipment installation for exhaust requirements and electrical system upgrades. The project requires procurement and installation of furniture and equipment to support CBP operations. The addendum revises Section 09650 (Resilient Flooring), adds new Section 09670 (Fluid-Applied Flooring) and Section 09681 (Tile Carpeting), updates the proposal form, and replaces multiple plan sheets including the abbreviations and symbols legend, enlarged floor plan, finish schedules, signage schedule, and furniture and equipment plan. The completion time is 270 calendar days from the notice to proceed, with liquidated damages of $500 per day for delays.
The proposal schedule includes a lump sum bid for the CBP FIS Renovation with allowances totaling $695,000 for unforeseen conditions, security measures, furniture, equipment, and the security control system. Bidders must possess a valid State of Hawaii General Engineering "A" or General Building "B" license at the time of bidding. Bid security of 5% of the total amount bid is required, and proposals must be submitted and uploaded to HIePRO prior to the August 28, 2026 deadline; failure to upload the complete proposal to HIePRO is grounds for rejection. The project is subject to Hawaii Revised Statutes Chapter 103D procurement requirements, and contractor personnel requiring access to secure areas must obtain required security credentials. All security equipment is subject to CBP review and approval. The addendum includes pre-bid meeting minutes from July 16, 2026, responses to requests for information, and updated construction documents prepared by GHD Inc. (architecture) and Coffman Engineers (mechanical, electrical, and structural engineering).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL SPECIFICATIONS w NTB CO1433 33.pdf | ||
| FINAL PLANS CO1433 33.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CBP FIS RENOVATION
DANIEL K. INOUYE INTERNATIONAL AIRPORT
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
AUGUST 13, 2026
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
ADDENDUM NO. 1
FOR
CBP FIS RENOVATION
DANIEL K. INOUYE INTERNATIONAL AIRPORT
HONOLULU, OAHU, HAWAII
STATE PROJECT NO. CO1433-33
August 13, 2026
This Addendum shall make the following amendment(s) to the Solicitation:
A. NOTICE TO BIDDERS
1. Prospective bidders are hereby notified that receiving of bids, scheduled for
August 14, 2026, at 2:00 p.m., Hawaii Standard Time (HST), is HEREBY
POSTPONED until August 28, 2026, at 2:00 p.m., HST.
The attached NOTICE TO BIDDERS dated r08/13/2026, shall be incorporated and made a part of the NOTICE TO BIDDERS.
B. TABLE OF CONTENTS
1. Delete TABLE OF CONTENTS, in its entirety and replace it with attached TABLE OF
CONTENTS, dated r08/13/2026.
C. SPECIFICATIONS
1. Delete SECTION 09650 RESILIENT FLOORING in its entirety and replace it with attached SECTION 09650 RESILIENT FLOORING, dated r08/13/2026.
2. Add and make a part of the specifications the attached SECTION 09670
FLUID-APPLIED FLOORING, dated r08/13/2026.
3. Add and make a part of the specifications the attached SECTION 09681 TILE
CARPETING, dated r08/13/2026.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
AUGUST 13, 2026
D. PROPOSAL
1. Delete PROPOSAL dated r07/01/26, in its entirety, and replace it with attached
PROPOSAL, dated r08/13/2026.
E. PLANS
1. Delete PLANS SHEET NO. A-001 ABBREVIATIONS AND SYMBOLS LEGEND and replace it with attached PLANS SHEET NO. ADD. 1 A-001 ABBREVIATIONS
AND SYMBOLS LEGEND.
2. Delete PLANS SHEET NO. A-104 ENLARGED FLOOR PLAN – CBP FLOORING and replace it with attached PLANS SHEET NO. ADD. 1 A-104 ENLARGED FLOOR
PLAN – CBP FLOORING.
3. Delete PLANS SHEET NO. A-601 FINISH SCHEDULES and replace it with attached
PLANS SHEET NO. ADD. 1 A-601 FINISH SCHEDULES.
4. Delete PLANS SHEET NO. A-603 SIGNAGE SCHEDULE AND MOUNTING
HEIGHTS and replace it with attached PLANS SHEET NO. ADD. 1 A-603 SIGNAGE
SCHEDULE AND MOUNTING HEIGHTS.
5. Delete PLANS SHEET NO. A-604 FURNITURE & EQUIPMENT PLAN AND
FURNITURE SCHEDULE and replace it with attached PLANS SHEET NO. ADD. 1
A-604 FURNITURE & EQUIPMENT PLAN AND FURNITURE SCHEDULE.
The following is provided for information.
F. PRE-BID MEETING MINUTES
1. The attached PRE-BID MEETING MINUTES and ATTENDANCE SHEET are provided for information.
G. RESPONSES TO REQUESTS FOR INFORMATION (RFI’S/QUESTIONS)
1. The attached RESPONSES TO REQUESTS FOR INFORMATION are provided for information.
Please acknowledge receipt of this ADDENDUM NO. 1 by recording the date of its receipt in the space provided on the PAGE P-4 of the Proposal.
CURT T. OTAGURO
Deputy Director of Transportation for Airports
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
r08/13/2026
NOTICE TO BIDDERS
Hawaii Revised Statutes (HRS), Chapter 103D
The receiving of bids for CBP FIS RENOVATION, DANIEL K. INOUYE
INTERNATIONAL AIRPORT, HONOLULU, OAHU, HAWAII,
PROJECT NO. CO1433-33, will begin as of the HIePRO Release Date. Bidders shall register and submit complete bids through HIePRO only. Refer to the following HIePRO link for important information on Vendor Registration: https://hiepro.ehawaii.gov/welcome.html.
The solicitation plans, specifications, proposal, and additional documents designated or incorporated by reference shall be available in HIePRO.
HIePRO OFFER DUE DATE & TIME scheduled for August 14, 2026, at 2:00 p.m., Hawaii Standard Time (HST), is HEREBY POSTPONED until August 28, 2026, at
2:00 p.m., HST. Bidders shall submit and upload the complete proposal to HIePRO prior to the offer due date and time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not include confidential and/or proprietary documents as part of their proposal. The record of each bidder and their respective proposal shall be open to public inspection. FAILURE TO
UPLOAD THE PROPOSAL TO HIePRO SHALL BE GROUNDS FOR REJECTION.
CURT T. OTAGURO
Deputy Director of Transportation for Airports
CBP FIS RENOVATION ADDENDUM NO. 1
DANIEL K. INOUYE INTERNATIONAL AIRPORT TABLE OF CONTENTS
STATE PROJECT NO. CO1433-33 TOC 1 of 3
TABLE OF CONTENTS
Page
Instructions for Contractor’s Licensing ............................................................................... HAI
Special Provisions .............................................................................................. SP-1 to SP-5
Wage Rate Schedule (Not physically included in the Bid Documents)
SPECIFICATIONS PART I - GENERAL PROVISIONS
SPECIFICATION PART II – TECHNICAL PROVISIONS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01010 DESCRIPTION OF WORK ........................................... 01010-1 to 01010-6 SECTION 01210 ALLOWANCES ............................................................. 01210-1 to 01210-3 SECTION 01300 SUBMITTALS ............................................................... 01300-1 to 01300-8 SECTION 01310 PROJECT MANAGEMENT AND COORDINATION ...... 01310-1 to 01310-4 SECTION 01330 SUBMITTAL PROCEDURES ........................................ 01330-1 to 01330-8 SECTION 01400 CONTRACTOR QUALITY CONTROL PROGRAM .......01400-1 to 01400-8 SECTION 01524 CONSTRUCTION WASTE MANAGEMENT ..................01524-1 to 01524-8 SECTION 01533 BARRICADES ................................................................................ 01533-1
SECTION 01560 GENERAL ENVIRONMENTAL, HEALTH,
AND SAFETY CONTROLS .......................................................... 01560-1 to 01560-4
SECTION 01561 CONSTRUCTION SITE POLLUTION
CONTROLS ................................................................................ 01561-1 to 01561-12
SECTION 01562 MANAGEMENT OF CONTAMINATED
MEDIA, SOIL DISPOSAL, AND SOIL REUSE ............................ 01562-1 to 01562-14 SECTION 01565 SECURITY MEASURES ............................................... 01565-1 to 01565-2 SECTION 01580 TEMPORARY FACILITIES AND UTILITIES ................. 01580-1 to 01580-2 SECTION 01581 PROJECT IDENTIFICATION ........................................ 01581-1 to 01581-3 SECTION 01600 PRODUCT REQUIREMENTS ...................................... 01600-1 to 01600-4
SECTION 01611 VOLATILE ORGANIC COMPOUND (VOC)
CONTENT RESTRICTIONS ......................................................... 01611-1 to 01611-3 SECTION 01700 EXECUTION AND CLOSEOUT REQUIREMENTS .... 01700-1 to 01700-12
SECTION 01715 EXISTING CONDITIONS – HAZARDOUS
MATERIALS SURVEY .................................................................. 01715-1 to 01715-3
ATTACHMENT 1 – HAZARDOUS MATERIALS SURVEY REPORT IN
SUPPORT OF THE STATE OF HAWAII DEPARTMENT OF
TRANSPORTATION-AIRPORTS DIVISION STATE PROJECT
NO. DO33 – CO1433-33 – CBP FIS RENOVATION ......................................... 1 to 30
ATTACHMENT 2 – STATE OF HAWAII DEPARTMENT OF TRANSPORTATION
AIRPORTS DIVISION HAZARDOUS MATERIALS REVIEW FORM
ATTACHMENT 3 – ARSENIC IN CANEC CEILINGS AND WALLBOARD
IN HAWAII .......................................................................................................... 1 to 3 SECTION 01780 CLOSEOUT SUBMITTALS .............................................01780-1 to 01780-5
SECTION 01800 SPECIAL REQUIREMENTS FOR CONTRACTORS
ON THE AOA ............................................................................... 01800-1 to 01800-8
STATE PROJECT NO. CO1433-33 TOC 2 of 3
DIVISION 2 – EXISTING CONDITIONS
SECTION 02070 DEMOLITION AND REMOVAL .................................... 02070-1 to 02070-6 SECTION 02410 SELECTIVE DEMOLITION ........................................... 02410-1 to 02410-6
DIVISION 3 – CONCRETE
SECTION 03730 CONCRETE REPAIR ................................................. 03730-1 to 03730-10
DIVISION 4 (Not Used)
DIVISION 5 – METALS
SECTION 05120 STRUCTURAL STEEL ................................................. 05120-1 to 05120-9
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES
SECTION 06100 ROUGH CARPENTRY ................................................ 06100-1 to 06100-2
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
SECTION 07520 MODIFIED BITUMINOUS MEMBRANE ROOFING ..... 07520-1 to 07520-4 SECTION 07620 SHEET METAL FLASHING AND TRIM ....................... 07620-1 to 07620-3 SECTION 07920 JOINT SEALANTS ....................................................... 07920-1 to 07920-4
DIVISION 8 – DOORS AND FRAMES
SECTION 08111 HOLLOW METAL DOORS AND FRAMES .................. 08111-1 to 08111-5 SECTION 08431 ALUMINUM-FRAMED STOREFRONTS ....................... 08431-1 to 08431-5 SECTION 08710 DOOR HARDWARE .................................................... 08710-1 to 08710-7 SECTION 08800 GLAZING ..................................................................... 08800-1 to 08800-5
DIVISION 9 – FINISHES
SECTION 09211 GYPSUM BOARD ASSEMBLIES ................................ 09211-1 to 09211-4 SECTION 09221 NON-STRUCTURAL METAL FRAMING ...................... 09221-1 to 09221-4 SECTION 09510 ACOUSTICAL CEILINGS ............................................ 09510-1 to 09510-4 SECTION 09650 RESILIENT FLOORING ............................................... 09650-1 to 09650-5 SECTION 09670 FLUID APPLIED FLOORING ....................................... 09670-1 to 09670-3 SECTION 09681 TILE CARPETING ....................................................... 09681-1 to 09681-3 SECTION 09911 EXTERIOR PAINTING ................................................. 09911-1 to 09911-5 SECTION 09912 INTERIOR PAINTING ................................................... 09912-1 to 09912-7
DIVISION 10 – SPECIALTIES
SECTION 10142 PANEL SIGNAGE ........................................................ 10142-1 to 10142-3
DIVISION 11 – EQUIPMENT
STATE PROJECT NO. CO1433-33 TOC 3 of 3
SECTION 11150 SECURITY CONTROL SYSTEM ................................ 11150-1 to 11150-12
DIVISION 12 (Not Used)
DIVISION 13 – SPECIAL CONSTRUCTION
SECTION 13281 REMOVAL AND DISPOSAL OF
ASBESTOS CONTAINING MATERIALS .................................... 13281-1 to 13281-23 SECTION 13282 LEAD PAINT CONTROL MEASURES ....................... 13282-1 to 13282-18
SECTION 13284 REMOVAL AND DISPOSAL OF ARSENIC-CONTAINING BUILDING
PRODUCTS ............................................................................... 13284-1 to 13284-16 SECTION 13288 TESTING AND AIR MONITORING ............................ 13288-1 to 13288-12 SECTION 13851 ADDRESSABLE FIRE ALARM SYSTEM ................... 13851-1 to 13851-22
DIVISION 14 (Not Used)
DIVISION 15 – MECHANICAL
SECTION 15011 GENERAL MECHANICAL PROVISIONS ..................... 15011-1 to 15011-9 SECTION 15600 AIR CONDITIONING AND VENTILATION ................. 15600-1 to 15600-20
DIVISION 16 – ELECTRICAL
SECTION 16050 ELECTRICAL WORK ................................................. 16050-1 to 16050-13 SECTION 16510 LIGHTING ..................................................................... 16510-1 to 16510-5 SECTION 16711 PATHWAYS FOR COMMUNICATIONS SYSTEMS ... 16711-1 to 16711-10
SECTION 16713 SLEEVE AND SLEEVE SEALS FOR
COMMUNICATIONS PATHWAYS AND CABLING ....................... 16713-1 to 16713-5 SECTION 16717 COMMUNICATIONS HORIZONTAL CABLING ......... 16717-1 to 16717-15
APPENDIX A: CONTRACTOR-PROCURED EQUIPMENT LIST ...................................... A-1
Requirements of Chapter 104, HRS (eH104-3, Rev 05/24) ............................................ 1 to 2
Proposal .................................................................................................................. P-1 to P-8
Proposal Schedule ................................................................................................ P-9 to P-10
Surety Bid Bond
FORMS
Sample Contract Performance Bond (Surety) Performance Bond Labor and Material Payment Bond (Surety) Labor and Material Payment Bond Chapter 104, HRS Compliance Certificate Certification of Compliance for Employment of State Residents Provisions to be Included in Construction Procurement Solicitation
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
RESILIENT FLOORING
09650-1 r08/13/2026
SECTION 09650 – RESILIENT FLOORING
PART 1 – GENERAL
1.01 RELATED DOCUMENTS
The General Provisions for Construction Projects (2016), Special Provisions and General Requirements of the Specifications, apply to the work specified in this Section
1.02 REFERENCE STANDARDS
A. ASTM E648 - Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source; 2025a.
B. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring; 2022.
C. ASTM F1861 - Standard Specification for Resilient Wall Base; 2021 (Reapproved 2025).
D. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride; 2023.
E. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes; 2019a.
F. ASTM F3261 - Standard Specification for Resilient Flooring in Modular Format with Rigid Polymeric Core; 2020.
G. NFPA 253 - Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source; 2023.
H. RFCI (RWP) - Recommended Work Practices for Removal of Resilient Floor Coverings; 2018.
1.03 SUBMITTALS
A. See SECTION 01300 - SUBMITTALS.
B. Verification Samples: Submit two samples, 6 by 6 inch (___ by ___ mm) in size illustrating color and pattern for each resilient flooring product specified.
C. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) test reports.
D. Installer's Qualification Statement.
E. Maintenance Data: Include maintenance procedures, recommended maintenance materials, and suggested schedule for cleaning, stripping, and re-waxing.
6 66 6
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
RESILIENT FLOORING
09650-2 r08/13/2026
F. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.
1. See Section 01600 - PRODUCT REQUIREMENTS, for additional provisions.
2. Extra Flooring Material: 100 square feet (_____ square meters) of each type and color.
1.04 DELIVERY, STORAGE, AND HANDLING
A. Upon receipt, immediately remove any shrink-wrap and check materials for damage and the correct style, color, quantity and run numbers.
B. Store all materials off of the floor in an acclimatized, weather-tight space.
PART 2 – PRODUCTS
2.01 TILE FLOORING
A. Resilient Tile with Rigid Polymeric Core: Printed film type, with transparent or translucent wear layer; polymeric rigid core with or without backing.
1. Manufacturers:
a. HMTX Industries, LLC; Elemental Multi-Layer 0.55 : www.hmtxcommercial.com/#sle.
b. Karndean Designflooring; Karndean Korlok Select: www.karndean.com/#sle.
2. Minimum Requirements: Comply with ASTM F3261, Class I; Type B - Embossed;
Grade 1 - Commercial.
3. Critical Radiant Flux (CRF): Minimum 0.45 watt per square centimeter, when tested in accordance with ASTM E648.
4. Plank Tile Size: 6 by 36 inches (150 by 914 mm).
5. Wear Layer Thickness: 0.020 inch (0.5 mm).
6. Total Thickness: 0.26 inch (6.5 mm).
7. Color: As indicated on drawings.
B. Static Control Tile - Type RES-2: Homogeneous; color and pattern throughout thickness.
1. Manufacturers:
a. Flexco Corporation; Delane ESD Vinyl: www.flexcofloors.com/#sle.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
RESILIENT FLOORING
09650-3 r08/13/2026
b. Roppe Corporation; ESD Vinyl Static Control Tile: www.roppe.com/#sle.
2. Critical Radiant Flux (CRF): Minimum 0.45 watt per square centimeter, when tested in accordance with ASTM E648 or NFPA 253.
3. Tile Size: 12 by 12 inch (305 by 305 mm).
4. Total Thickness: 0.125 inch (3 mm).
5. Color: To be selected by Architect from manufacturer's full range.
2.02 RESILIENT BASE
A. Resilient Base: ASTM F1861, Type TP, rubber, thermoplastic; provide cove base at resilient or solid flooring and straight base at carpet tile flooring.
1. Height: 4 inches (100 mm).
2. Thickness: 0.125 inch (3.2 mm).
3. Finish: Satin.
4. Length: Roll.
5. Color: To be selected by Architect from manufacturer's full range.
6. Accessories: Premolded external corners and internal corners.
2.03 ACCESSORIES
A. Primers, Adhesives, and Seam Sealer: Waterproof; types recommended by flooring manufacturer.
B. Adhesive for Vinyl Flooring: as recommended by flooring manufacturer.
C. Moldings, Transition and Edge Strips: Same material as flooring.
D. Copper Grounding Strips: Type and size as recommended by static control flooring manufacturer.
PART 3 – EXECUTION
3.01 EXAMINATION
A. Verify that surfaces are flat to tolerances acceptable to flooring manufacturer, free of cracks that might telegraph through flooring, clean, dry, and free of curing compounds, surface hardeners, and other chemicals that might interfere with bonding of flooring to substrate.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
RESILIENT FLOORING
09650-4 r08/13/2026
B. Verify that wall surfaces are smooth and flat within the tolerances specified for that type of work, are dust-free, and are ready to receive resilient base.
C. Cementitious Subfloor Surfaces: Verify that substrates are ready for resilient flooring installation by testing for moisture and alkalinity (pH).
1. Test as Follows:
a. Alkalinity (pH): ASTM F710.
b. Internal Relative Humidity: ASTM F2170.
c. Moisture Vapor Emission: ASTM F1869.
2. Obtain instructions if test results are not within limits recommended by resilient flooring manufacturer and adhesive materials manufacturer.
3.02 PREPARATION
A. Remove existing resilient flooring and flooring adhesives; follow the recommendations of RFCI (RWP).
B. Prepare floor substrates as recommended by flooring and adhesive manufacturers.
C. Remove subfloor ridges and bumps. Fill minor low spots, cracks, joints, holes, and other defects with subfloor filler to achieve smooth, flat, hard surface.
D. Prohibit traffic until filler is fully cured.
E. Clean substrate.
3.03 INSTALLATION - GENERAL
A. Starting installation constitutes acceptance of subfloor conditions.
B. Install in accordance with manufacturer's written instructions.
C. Adhesive-Applied Installation:
1. Fit joints and butt seams tightly.
2. Set flooring in place, press with heavy roller to attain full adhesion.
D. Where type of floor finish, pattern, or color are different on opposite sides of door, terminate flooring under centerline of door.
E. Install edge strips at unprotected or exposed edges, where flooring terminates, and where indicated.
1. Resilient Strips: Attach to substrate using adhesive.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
RESILIENT FLOORING
09650-5 r08/13/2026
F. Scribe flooring to walls, columns, cabinets, floor outlets, and other appurtenances to produce tight joints.
3.04 INSTALLATION - TILE FLOORING
Mix tile from container to ensure shade variations are consistent when tile is placed, unless otherwise indicated in manufacturer's installation instructions.
3.05 INSTALLATION - RESILIENT BASE
A. Fit joints tightly and make vertical. Maintain minimum dimension of 18 inches (45 mm) between joints.
B. Install base on solid backing. Bond tightly to wall and floor surfaces.
3.06 CLEANING
A. Remove excess adhesive from floor, base, and wall surfaces without damage.
B. Clean in accordance with manufacturer's written instructions.
3.07 PROTECTION
Prohibit traffic on resilient flooring for 48 hours after installation.
PART 4 – MEASUREMENT AND PAYMENT
4.01 BASIS OF MEASUREMENT AND PAYMENT
Work under this section will not be measured nor paid for separately but shall be considered incidental to and included in the prices bid for the various items of work in this project.
END OF SECTION
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
FLUID-APPLIED FLOORING
09670-1 r08/13/2026
SECTION 09670 – FLUID-APPLIED FLOORING
PART 1 – GENERAL
1.01 RELATED DOCUMENTS
The General Provisions for Construction Projects (2016), Special Provisions and General Requirements of the Specifications, apply to the work specified in this Section.
1.02 REFERENCE STANDARDS
A. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring; 2022.
B. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride; 2023.
C. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes; 2019a.
1.03 SUBMITTALS
A. See SECTION 01300 – SUBMITTALS.
B. Product Data: Provide data on specified products, describing physical and performance characteristics; sizes, patterns and colors available; and limitations.
C. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) test reports.
D. Manufacturer's Installation Instructions: Indicate special procedures, perimeter conditions requiring special attention, and application rate for each coat.
E. Manufacturer's Qualification Statement.
F. Maintenance Data: Include maintenance procedures, recommended maintenance materials, procedures for stain removal, repairing surface, and suggested schedule for cleaning.
1.04 DELIVERY, STORAGE, AND HANDLING
Store resin materials in a dry, secure area.
PART 2 – PRODUCTS
2.01 FLUID-APPLIED FLOORING SYSTEMS
A. Fluid-Applied Flooring Type EPX-1: Epoxy, with aggregate.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
FLUID-APPLIED FLOORING
09670-2 r08/13/2026
1. Aggregate: manufacturer's standard texture granules.
2. System Thickness: 40 mils (1 mm), nominal, dry film thickness (DFT).
3. Texture: Slip resistant.
4. Sheen: Gloss.
5. Color: As selected by Architect.
6. Products:
a. Mapei Corporation; Mapefloor System 31: www.mapei.com/#sle.
b. PPG Flooring; 912 LV Epoxy Primer/Sealer with 610 SL Self-Leveling Epoxy and Epoxy Siloxane FLR650-0 Series, Gloss: www.pittsburghpaintsco.com/#sle and www.ppgpmc.com/home.aspx/#sle.
c. TNEMEC; 1/16" to 1/8" Pigmented High-Wear System: www.tnemec.com/#sle.
d. Westcoat Specialty Coating Systems; Double Broadcast Epoxy Dubro Quartz: www.westcoat.com/#sle.
PART 3 – EXECUTION
3.01 EXAMINATION
A. Verify that subfloor surfaces are dust-free and free of substances that could impair bonding of materials to subfloor surfaces.
B. Cementitious Subfloor Surfaces: Verify that substrates are ready for fluid-applied flooring installation by testing for moisture and alkalinity (pH).
1. Test as Follows:
a. Alkalinity (pH): ASTM F710.
b. Internal Relative Humidity: ASTM F2170.
c. Moisture Vapor Emission: ASTM F1869.
2. Obtain instructions if test results are not within limits recommended by fluid-applied flooring manufacturer.
3.02 PREPARATION
A. Remove subfloor ridges and bumps. Fill low spots, cracks, joints, holes, and other defects with subfloor filler.
B. Vacuum clean substrate.
C. Apply primer to surfaces required by flooring manufacturer.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
FLUID-APPLIED FLOORING
09670-3 r08/13/2026
3.03 INSTALLATION - FLOORING
A. Apply in accordance with manufacturer's instructions.
B. Apply each coat to minimum thickness required by manufacturer.
C. Finish to smooth level surface.
3.04 PROTECTION
A. Prohibit traffic on floor finish for 48 hours after installation.
B. Barricade area to protect flooring until fully cured.
PART 4 – MEASUREMENT AND PAYMENT
4.01 BASIS OF MEASUREMENT AND PAYMENT
Work under this section will not be measured nor paid for separately but shall be considered incidental to and included in the prices bid for the various items of work in this project.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
TILE CARPETING
09681-1 r08/13/2026
SECTION 09681 – TILE CARPETING
PART 1 – GENERAL
1.01 RELATED DOCUMENTS
The General Provisions for Construction Projects (2016), Special Provisions and General Requirements of the Specifications, apply to the work specified in this Section.
1.02 REFERENCE STANDARDS
A. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring; 2022.
B. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride; 2023.
C. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes; 2019a.
1.03 SUBMITTALS
A. See SECTION 01300 - SUBMITTALS.
B. Product Data: Provide data on specified products, describing physical and performance characteristics; sizes, patterns, colors available, and method of installation.
C. Samples: Submit two carpet tiles illustrating color and pattern design for each carpet color selected.
D. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) test reports.
E. Manufacturer's Qualification Statement.
PART 2 – PRODUCTS
2.01 MATERIALS
Tile Carpeting, Type CPT-1: Tufted, manufactured in one color dye lot.
2.02 ACCESSORIES
A. Subfloor Filler: White premix latex; type recommended by flooring material manufacturer.
B. Edge Strips: Embossed aluminum, color as selected by Architect.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
TILE CARPETING
09681-2 r08/13/2026
C. Adhesives:
1. Compatible with materials being adhered; maximum VOC content of 50 g/L; CRI (GLP) certified; in lieu of labeled product, independent test report showing compliance is acceptable.
D. Carpet Tile Adhesive: Recommended by carpet tile manufacturer; releasable type.
PART 3 – EXECUTION
3.01 EXAMINATION
A. Verify that subfloor surfaces are dust-free and free of substances that could impair bonding of adhesive materials to subfloor surfaces.
B. Cementitious Subfloor Surfaces: Verify that substrates are ready for flooring installation by testing for moisture and alkalinity (pH).
1. Test as Follows:
a. Alkalinity (pH): ASTM F710.
b. Internal Relative Humidity: ASTM F2170.
c. Moisture Vapor Emission: ASTM F1869.
2. Obtain instructions if test results are not within limits recommended by flooring material manufacturer and adhesive materials manufacturer.
3.02 PREPARATION
A. Prepare floor substrates as recommended by flooring and adhesive manufacturers.
B. Remove subfloor ridges and bumps. Fill minor or local low spots, cracks, joints, holes, and other defects with subfloor filler.
C. Apply, trowel, and float filler to achieve smooth, flat, hard surface. Prohibit traffic until filler is cured.
D. Vacuum clean substrate.
3.03 INSTALLATION
A. Starting installation constitutes acceptance of subfloor conditions.
B. Install carpet tile in accordance with manufacturer's instructions.
C. Blend carpet from different cartons to ensure minimal variation in color match.
D. Cut carpet tile clean. Fit carpet tight to intersection with vertical surfaces without gaps.
STATE PROJECT NO. CO1433-33
ADDENDUM NO. 1
TILE CARPETING
09681-3 r08/13/2026
E. Lay carpet tile in square pattern, with pile direction parallel to next unit, set parallel to building lines.
F. Trim carpet tile neatly at walls and around interruptions.
G. Complete installation of edge strips, concealing exposed edges.
PART 4 – MEASUREMENT AND PAYMENT
4.01 BASIS OF MEASUREMENT AND PAYMENT
Work under this section will not be measured nor paid for separately but shall be considered incidental to and included in the prices bid for the various items of work in this project
ADDENDUM NO.1
r08/13/2026STATE PROJECT NO. CO1433-33
P-1
PROPOSAL TO THE
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
PROJECT:
PROJECT NO.:
CBP FIS Renovation Daniel K. Inouye International Airport Honolulu, Oahu, Hawaii
CO1433-33
COMPLETION TIME:
LIQUIDATED DAMAGES:
PROJECT MANAGER:
ELECTRONIC SUBMITTAL:
TWO HUNDRED SEVENTY (270) calendar days from the date indicated in the Notice to Proceed from the Department.
FIVE HUNDRED DOLLARS ($500.00) for each and every calendar day which the Contractor has delayed the completion of this project.
Ms. Erin Hashimoto Department of Transportation Airports Daniel K. Inouye International Airport 400 Rodgers Boulevard, Suite 700 Honolulu, HI 96819-1880 Phone: (808) 838-8803 Email: erin.a.hashimoto@hawaii.gov
Bidders shall submit and upload the complete proposal to HIePRO prior to the bid opening date and time. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. See SPECIAL PROVISIONS 2.8
PREPARATION AND DELIVERY
OF BID for complete details. FAILURE TO UPLOAD THE COMPLETE PROPOSAL TO HIePRO SHALL
BE GROUNDS FOR REJECTION OF THE BID.
AIR-HAR
P-2
Director of Transportation 869 Punchbowl Street Honolulu, Hawaii 96813
Dear Sir:
The undersigned Bidder declares the following:
1. It has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this proposal.
2. It has not been assisted or represented on this matter by any individual who has, in a State capacity, been involved in the subject matter of this contract within the past two years.
3. It has not and will not, either directly or indirectly offered or given a gratuity
(i.e. an entertainment or gift) to any State or County employee to obtain a contract or favorable treatment under a contract.
The undersigned Bidder further agrees to the following:
1. If this proposal is accepted, it shall execute a contract with the Department to provide all necessary labor, machinery, tools, equipment, apparatus and any other means of construction, to do all the work and to furnish all the materials specified in the contract in the manner and within the time therein prescribed in the contract, and that it shall accept in full payment therefore the sum of the unit and/or lump sum prices as set forth in the attached proposal schedule for the actual quantities of work performed and materials furnished and furnish satisfactory security in accordance with Section 103D-324, Hawaii Revised Statutes, within 10 days after the award of the contract or within such time as the Director of Transportation may allow after the undersigned has received the contract documents for execution, and is fully aware that non-compliance with the aforementioned terms will result in the forfeiture of the full amount of the bid guarantee required under Section 103D-323, Hawaii Revised Statutes.
2. That the quantities given in the attached proposal schedule are approximate only and are intended principally to serve as a guide in determining and comparing the bids.
3. That the Department does not either expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the Director of Transportation, and that all increased or decreased quantities of work shall be performed at the unit prices set forth in the attached proposal schedule except as provided for in the specifications.
P-3
4. In case of a discrepancy between unit prices and the totals in said Proposal Schedule, the unit prices shall prevail.
5. Agrees to begin work within 10 working days after the date of notification to commence with the work, which date is in the notice to proceed, and shall finish the entire project within the time prescribed.
6. The Director of Transportation reserves the right to reject any or all bids and to waive any defects when in the Director’s opinion such rejections or waiver will be for the best interest of the public.
7. The undersigned Bidder further agrees to the following: Pursuant to HRS
§103D-405(d), any contractor (including consultants) paid for services to develop or prepare specifications or work statements shall be precluded from submitting an offer or receiving a contract for that particular solicitation. This includes the preparation of reports relied upon by HDOT in the development of the project scope.
The Bidder acknowledges receipt of and certifies that it has completely examined the following listed items: the Hawaii Department of Transportation, Air and Water Transportation Facilities Division General Provisions for Construction Projects dated 2016, the Notice to Bidders, the Special Provisions, if any, the Technical Provisions, the Proposal, the Contract and Bond Forms, and the Project Plans.
In accordance with Section 103D-323, Hawaii Revised Statutes, this proposal is accompanied with a bid security in the amount of 5% of the total amount bid, in the form checked below. (Check applicable bid security submitted with bid.)
Surety Bid Bond (Use standard form), Cash, Cashier’s Check, Certified Check, or
(Fill in other acceptable security.)
P-4
The undersigned Bidder acknowledges receipt of any addendum issued by the Department by recording in the space below the date of receipt.
Addendum No. 1 Addendum No. 3
Addendum No. 2 Addendum No. 4
In accordance with Section 103D-302, Hawaii Revised Statutes, the undersigned as Bidder, has listed the name of each person or firm, who will be engaged by the Bidder on the project as a Subcontractor or Joint Contractor and the nature of work to be done by each. The Bidder must adequately and unambiguously disclose the unique nature and scope of the work to be performed by each Subcontractor or Joint Contractor. For each listed firm, the Bidder declares the respective firm is a Subcontractor or Joint Contractor and is subject to evaluation as a Subcontractor or Joint Contractor. It is understood that failure to comply with the aforementioned requirements may be cause for rejection of the bid submitted.
Name of Subcontractor Nature and Scope of Work
1.
2.
3.
4.
5.
6.
7.
8.
Name of Joint Contractor Nature and Scope of Work
1.
2.
3.
NOTES:
"None" or if left blank indicates no Subcontractor or Joint Contractor.
If more space is needed, attach additional sheets.
P-5
The undersigned hereby certifies that the bid prices contained in the attached proposal schedule have been carefully checked and are submitted as correct and final.
This declaration is made with the understanding that the undersigned is subject to the penalty of perjury under the laws of the United States and is in violation of the Hawaii Penal Code, Section 710-1063, unsworn falsification to authorities, of the Hawaii Revised Statutes, for knowingly rendering a false declaration.
Bidder (Company Name)
By Authorized Signature
Print Name and Title
Business Address
Business Telephone
Date
Contact Person (If different from above)
Phone: Email:
NOTE:
If Bidder is a CORPORATION, the legal name of the corporation shall be set forth above, the corporate seal affixed, together with the signature(s) of the officer(s) authorized to sign contracts for the corporation. Please attach to this page current (not more than six months old) evidence of the authority of the officer(s) to sign for the corporation.
If Bidder is a PARTNERSHIP, the true name of the partnership shall be set forth above, with the signature(s) of the general partner(s). Please attach to this page current (not more than six months old) evidence of the authority of the partner authorized to sign for the partnership.
If Bidder is an INDIVIDUAL, the bidder's signature shall be placed above.
If signature is by an agent, other than an officer of a corporation or a partner of a partnership, a POWER OF ATTORNEY must be on file with the Department before opening bids or submitted with the bid. Otherwise, the Department may reject the bid as irregular and unauthorized.
P-6 AIR-HAR
r08/13/2026
PREFERENCES
Bidders acknowledge that while preferences are considered in the evaluation of bids, the award of the contract will be in the amount of the bid offered exclusive of any preferences.
A. HAWAII BIDDER PREFERENCE
In accordance with HRS §103D-302, the Hawaii bidder preference is applicable to this solicitation for evaluation purposes only. Bidders desiring to qualify for the five per cent (5%) preference shall submit with their bid a completed Hawaii Bidder/Offeror Preference Certification Form (Form SPO-081) at or before the time set for receipt of bids. Certifications submitted for previous or other solicitations will not be accepted.
( ) Yes, the Bidder elects to receive the Hawaii Bidder Preference and has included the Form SPO-081 with the bid.
B. APPRENTICESHIP AGREEMENT PREFERENCE
In accordance with HRS §103-55.6, the estimated value of this public works contract is $250,000 or more and the apprenticeship agreement preference is applicable to this solicitation for evaluation purposes only. Bidders desiring to qualify for the five per cent (5%) preference shall submit with their bid a complete, valid CERTIFICATION OF BIDDER’S PARTICIPATION IN APPROVED APPRENTICESHIP PROGRAM UNDER ACT 17 (Certification Form 1) for each apprenticeable trade the Bidder will employ on the project.
( ) Yes, the Bidder elects to receive the Apprenticeship Agreement Preference and has attached Certification Form(s) 1 for each apprenticeable trade the Bidder will employ for this project (excluding subcontractors).
By submission of this offer, the Bidder certifies that it has indicated all apprenticeable trades that Bidder will employ for this project (excluding subcontractors) by listing the applicable trades below:
(Attach additional sheet if necessary.)
Form 1 Required. Failure to submit a valid Form 1 with the bid for every apprenticeable trade that Bidder will employ on the project will result in the preference being denied, regardless of whether the trade is listed above. If a Form 1 is submitted for a trade that is not listed above, the Form 1 will take
P-7 AIR-HAR
r08/13/2026 precedence over the listing and may be used to qualify Bidder for the preference.
Form 2 Required. If awarded the contract with the Apprenticeship Agreement Preference applied, then for the duration of the contract, the Bidder shall certify each month that work is being conducted on the project that the Contractor continues to be a participant in the relevant apprenticeship program for each trade it employs. Monthly certification shall be made on the Certification Form 2 and submitted to the
HDOT.
Failure to comply with the requirements of the Apprenticeship Agreement Preference program will subject the Contractor to sanctions pursuant to HRS §103-55.6.
C. HAWAII PRODUCTS PREFERENCE
Hawaii Products Preference shall not apply to this solicitation.
D. RECYCLED PRODUCT PREFERENCE
Recycled Product Preference shall not apply to this solicitation.
STATE OF HAWAII
Hawaii Bidder/Offeror
Preference Certification Form (As Defined in HRS103D-1001)
I, ______________________________________, ___________________________________ of (Authorized Officer’s Name) (Office or Position Held)
_________________________________________, certify the following:
(Name of Bidder/Offeror)
(1) That the Bidder/Offeror holds a valid commercial place of business located in the State of Hawaii at the following address:
and that the above-named office was opened on the following date: ______________, and has been staffed by the Bidder/Offeror or an employee of the Bidder/Offeror for not less than two (2) consecutive years immediately preceding the time and date set for the opening of bids or receipt of proposals;
(2) That the bid or proposal in response to IFB/RFP No. ___________________, is submitted under the name under which the Bidder/Offeror is authorized to do business in the State;
(3) That not less than fifty-one percent (51%) of the total direct labor hours required for performance of the contract will be performed within the State; and
(4) If the Bidder/Offeror is a joint venture, the Bidder/Offeror is composed entirely of parties meeting the requirements of paragraphs (1), (2), and (3).
I certify under penalty of perjury that the above statements are true. I agree to maintain the above qualifications throughout contract performance; any changes in eligibility shall be reported to the Contract Administrator or purchasing agency's contact person identified in the RFP/IFB. I acknowledge that failure to maintain the above qualifications triggers a price adjustment equal to the value of the preference applied and may constitute cause for debarment under HRS §103D-702.
Signature of Authorized Officer
Print Name and Title
Date
Form SPO-081 (Rev. 07/01/2026)
P-8 ADDENDUM NO. 1
r08/13/2026 r07.01.26
DANIEL K. INOUYE INTERNATIONAL AIRPORT P-9
STATE PROJECT NO. CO1433-33 r08/13/2026
CBP FIS RENOVATION
Daniel K. Inouye International Airport
Honolulu, Oahu, Hawaii
Project No. CO1433-33
PROPOSAL SCHEDULE
Item No.
Description Approx Qty Unit Unit Price Total
01010.1 CBP FIS Renovation Lump Sum Lump Sum Lump Sum $
01210.1 Unforeseen Conditions Allowance Allowance Allowance $ 300,000.00
01210.2 Security Measures Allowance Allowance Allowance $ 20,000.00
01210.3 Furniture Allowance Allowance Allowance $ 50,000.00
01210.4 Equipment Allowance Allowance Allowance $ 100,000.00
01210.5 Security Control System Allowance Allowance Allowance $ 200,000.00
01561.1 Construction Site Pollution Controls
LS LS LS $
01562.1 Management of Contaminated Media, Soil Disposal, and Soil Reuse
LS LS LS $
01562.2 Additional Management of Contaminated Media, Soil Disposal, and Soil Reuse
Allowance Allowance Allowance $ 25,000.00
TOTAL AMOUNT FOR COMPARISION OF BIDS $
DANIEL K. INOUYE INTERNATIONAL AIRPORT P-10
STATE PROJECT NO. CO1433-33 r08/13/2026
NOTES:
The bid prices herein shall include all labor, materials, equipment, and incidentals necessary to construct all items in place, including installation and testing of equipment, complete and ready for operation, all in accordance with the plans and specifications.
Note 1: Bids shall include all Federal, State, County and other applicable taxes and fees.
Note 2: The TOTAL AMOUNT FOR COMPARISON OF BIDS shall be used to determine the lowest responsible bidder.
Note 3: Bidders shall complete all unit prices and amounts. Failure to do so shall be grounds for rejection of bid.
Note 4: The State reserves the right to reject any or all Bids and to waive any defects in said Bids in the best interest of the State.
Note 5: Submission of a Bid is a warranty that the bidder has made an examination of the project site and is fully aware of all conditions to be encountered in performing the work and the requirements of the plans and specifications.
Note 6: The bidder's attention is directed to Section 2.11 - BID SECURITY of the General Provisions as amended by the Special Provisions.
Note 7: Bidder shall be paid for actual work performed as directed by the Engineer for allowance items.
Bidder shall not be paid overhead and profit for unused allowance funds.
Note 8: If the TOTAL AMOUNT FOR COMPARISION OF BIDS exceeds the funds available for the project, then the State reserves the right to negotiate with the lowest, responsive, responsible bidder as permitted under Section 103D-302, Hawaii Revised Statutes (HRS), to further reduce the scope of work and award a contract thereafter.
Note 9: Bidders shall submit and upload the complete proposal to HIePRO prior to the bid opening date and time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not include confidential and/or proprietary documents with the proposal. The record of each bidder and respective bid shall be open to public inspection. Original (wet ink, hard copy) proposal documents are not required to be submitted. Contract award shall be based on evaluation of proposals submitted and uploaded to HIePRO.
FAILURE TO UPLOAD THE COMPLETE PROPOSAL TO HIePRO SHALL BE GROUNDS
FOR REJECTION OF THE BID.
If there is a conflict between the specification document and the HIePRO solicitation, the specifications shall govern and control, unless otherwise specified.
SYMBOLS LEGEND
ROOM DESIGNATION WALL TYPE
DOOR DESIGNATION GRIDLINE
SIGNAGE DESIGNATION
EXTERIOR ELEVATION DESIGNATION
WINDOW / LOUVER DESIGNATION
DETAIL DESIGNATION
REVISION DESIGNATION
BUILDING SECTION DESIGNATION
PLAN KEYNOTE
INTERIOR ELEVATION DESIGNATION
BREAK LINE
MATCHLINE
NORTH ARROW / PLAN NORTH
DATUM DESIGNATION
TITLE DESIGNATION
XX
XX
1 VIEW NAME 1
A101
SHT_NO
DET_NO
A101
X'XX" AFF CEILING HEIGHT DESIGNATION
XXXX
RM NO
ROOM NAME
XXXX
FURNITURE DESIGNATION
XXx
WALL SECTION DESIGNATION
XX
DET_NO
SHT_NO
SIM
LEVEL NAME
ELEVATION
GRAPHIC SCALE
1t
PLAN
NORTH
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
DETAIL SECTION DESIGNATION
ABBREVIATIONS LEGEND
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTADIENE STYRENE
ABV ABOVE
A/C AIR CONDITIONING
AC ASPHALTIC CONCRETE
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
ADDL ADDITIONAL
ADF ACCESSIBLE DRINKING FOUNTAIN
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AFS ABOVE FINISH SLAB
AGGR AGGREGATE
ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
A
B
BBQ BARBEQUE
BD BOARD
BFF BELOW FINISH FLOOR
BKBD BACK BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOD BOTTOM OF DECK
BOT F BOTTOM FACE
BOT BOTTOM
BR BEDROOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CFCI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CFOI CONTRACTOR FURNISHED /
OWNER INSTALLED
CG CORNER GUARD
CMPST COMPOSITE
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COP COPPER
CORR CORRIDOR
CPT CARPET
CSK COUNTERSINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
CULT CULTURED
CW COLD WATER PIPING
D
D DEEP/DEPTH
DBL DOUBLE
DEG DEGREE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E
E EAST
EA EACH
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
ES EACH SIDE
EQ EQUAL
EQUIP EQUIPMENT
EOS EDGE OF SLAB
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
(E) EXISTING
F FAHRENHEIT
FA FIRE ALARM
FAB FABRICATE
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE, FIXTURES AND
EQUIPMENT
FGL FIBERGLASS
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FLR SK FLOOR SINK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIRE PROOF
FR FRAME
FRP FIBERGLASS REINFORCED
PLASTIC
FRT FIRE RETARDANT
FRZ FREEZER
FT FEET
FTD FACIAL TISSUE DISPENSER
FTG FOOTING
FURG FURRING
FUT FUTURE
G NATURAL GAS
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GEN GENERAL
GFGI GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
GFRG GLASSFIBER REINFORCED GYPSUM
GFRC GLASSFIBER REINFORCED CONCRETE
GL GLASS/GLAZING
GLU LAM GLUE LAMINATED WOOD
GPM GALLONS PER MINUTE
GRAN GRANITE
GSB GYPSUM SHEATHING BOARD
GTV GATE VALVE
GWT GLAZED WALL TILE
GYP GYPSUM
GWB GYPSUM WALL BOARD
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HS HAND SINK
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
F
G
H
I
ID INSIDE DIAMETER
INCL INCLUDED
IMP INSULATED METAL PANEL
IN INCH
INFO INFORMATION
INSUL INSULATION/INSULATED
INT INTERIOR
INV INVERT
J-BOX JUNCTION BOX
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCK DOWN
KIT KITCHEN
KO KNOCK-OUT
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LB POUND
LBF/SF POUNDS PER SQUARE FOOT
LDG LANDING
LF LINEAR FOOT
LH LEFT HAND
LKR LOCKER
LLV LONG LEG VERTICAL
LOC LOCATION
LT LIGHT
LR LIVING ROOM
LVR LOUVER
M METER
M2 SQUARE METER
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBR MASTER BEDROOM
MC MEDICINE CABINET
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MI MIRROR
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOULDING
MM MILLIMETER
MO MASONRY OPENING
MOD MODULE
MP METAL PANEL
MR MOISTURE RESISTANT
MTD MOUNTED
MTL METAL
MTG MOUNTING
MULL MULLION
MUN MUNTIN
MW MICROWAVE
N NORTH
NFS NON-FROST SUSCEPTIBLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OBS OBSCURE
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED / OWNER INSTALLED
OFD OVERFLOW DRAIN
OH OVER HANG
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OVHD OVER HEAD
J
K
L
M
N
O
P
PA PUBLIC ACCESS
PC PIECE
PCC PRECAST CONCRETE
PEND PENDANT
PERIM PERIMETER
PH PENTHOUSE
PLAS PLASTER
PLBG PLUMBING
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PROP PROPERTY
PREFAB PREFABRICATE
PT PAINT
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER
AND RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
R RISER
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RB HK ROBE HOOK
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFRIGERATOR
REFL REFLECTED
REG REGISTER
REINF REINFORCE
RECS RECOMMENDATIONS
REQD REQUIRED
RESIL RESILIENT
REST REST ROOM
REV REVISION
RTF RUBBER TILE FLOOR
RFG ROOFING
RLG RAILING
RH RIGHT HAND
RND ROUND
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKET
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCD SEAT COVER DISPENSER
SCP SCUPPER
SCR SHOWER CURTAIN ROD
SCRN SCREEN
SD SMOKE DETECTOR
SECT SECTION
SED SEE ELECTRICAL DRAWINGS
SF SQUARE FEET
SFNT STOREFRONT
SHT SHEET
SHR SHOWER
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SL SLOPE
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPC SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SSD SEE STRUCTURAL DRAWINGS
SST STAINLESS STEEL
SMD SEE MECHANICAL DRAWINGS
SMLS SEAMLESS
SS SOLID SURFACE
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURR SURROUND
SUSP SUSPENDED
SVCE SERVICE
SW SWITCH
SYMM SYMMETRICAL
SYS SYSTEM
Q
R
S
T
T TREAD
TB TOWEL BAR
TBD TO BE DETERMINED
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
T&G TONGUE AND GROOVE
THRES THRESHOLD
THRU THROUGH
THK THICKNESS
TK BD TACK BOARD
TMPD TEMPERED
TOC TOP OF CURB
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TS TUBE STEEL
TSH TOWEL SHELF
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
TLT TOILET
UBC UNIFORM BUILDING CODE
UC UNDERCUT
UNGD UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS OTHERWISE NOTED
UR URINAL
VAR VARIES
VB VALVE BOX
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VOL VOLUME
VP VENEER PLASTER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WIDE
W…