This is Addendum No. 1 to the solicitation for CBP FIS Renovation at Daniel K. Inouye International Airport, issued by the State of Hawaii Department of Transportation Airports Division on August 13, 2026. The addendum postpones the bid opening from August 14, 2026 at 2:00 p.m. HST to August 28, 2026 at 2:00 p.m. HST and modifies project specifications and plans. The scope consolidates Federal Inspection Services secondary screening operations through demolition, renovation, and system upgrades including mechanical, electrical, architectural, security, and telecommunications infrastructure. Work encompasses partition installation, flooring, ceiling and lighting replacements, creation of interview rooms, CBP holding rooms, triage podiums, and secured vestibules, along with mechanical equipment installation for exhaust requirements and electrical system upgrades. The project requires procurement and installation of furniture and equipment to support CBP operations. The addendum revises Section 09650 (Resilient Flooring), adds new Section 09670 (Fluid-Applied Flooring) and Section 09681 (Tile Carpeting), updates the proposal form, and replaces multiple plan sheets including the abbreviations and symbols legend, enlarged floor plan, finish schedules, signage schedule, and furniture and equipment plan. The completion time is 270 calendar days from the notice to proceed, with liquidated damages of $500 per day for delays.

The proposal schedule includes a lump sum bid for the CBP FIS Renovation with allowances totaling $695,000 for unforeseen conditions, security measures, furniture, equipment, and the security control system. Bidders must possess a valid State of Hawaii General Engineering "A" or General Building "B" license at the time of bidding. Bid security of 5% of the total amount bid is required, and proposals must be submitted and uploaded to HIePRO prior to the August 28, 2026 deadline; failure to upload the complete proposal to HIePRO is grounds for rejection. The project is subject to Hawaii Revised Statutes Chapter 103D procurement requirements, and contractor personnel requiring access to secure areas must obtain required security credentials. All security equipment is subject to CBP review and approval. The addendum includes pre-bid meeting minutes from July 16, 2026, responses to requests for information, and updated construction documents prepared by GHD Inc. (architecture) and Coffman Engineers (mechanical, electrical, and structural engineering).

View the file

Other files

File Type Posted
FINAL SPECIFICATIONS w NTB CO1433 33.pdf PDF
FINAL PLANS CO1433 33.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CBP FIS RENOVATION

DANIEL K. INOUYE INTERNATIONAL AIRPORT

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

AUGUST 13, 2026

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

AIRPORTS

ADDENDUM NO. 1

FOR

CBP FIS RENOVATION

DANIEL K. INOUYE INTERNATIONAL AIRPORT

HONOLULU, OAHU, HAWAII

STATE PROJECT NO. CO1433-33

August 13, 2026

This Addendum shall make the following amendment(s) to the Solicitation:

A. NOTICE TO BIDDERS

1. Prospective bidders are hereby notified that receiving of bids, scheduled for

August 14, 2026, at 2:00 p.m., Hawaii Standard Time (HST), is HEREBY

POSTPONED until August 28, 2026, at 2:00 p.m., HST.

The attached NOTICE TO BIDDERS dated r08/13/2026, shall be incorporated and made a part of the NOTICE TO BIDDERS.

B. TABLE OF CONTENTS

1. Delete TABLE OF CONTENTS, in its entirety and replace it with attached TABLE OF

CONTENTS, dated r08/13/2026.

C. SPECIFICATIONS

1. Delete SECTION 09650 RESILIENT FLOORING in its entirety and replace it with attached SECTION 09650 RESILIENT FLOORING, dated r08/13/2026.

2. Add and make a part of the specifications the attached SECTION 09670

FLUID-APPLIED FLOORING, dated r08/13/2026.

3. Add and make a part of the specifications the attached SECTION 09681 TILE

CARPETING, dated r08/13/2026.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

AUGUST 13, 2026

D. PROPOSAL

1. Delete PROPOSAL dated r07/01/26, in its entirety, and replace it with attached

PROPOSAL, dated r08/13/2026.

E. PLANS

1. Delete PLANS SHEET NO. A-001 ABBREVIATIONS AND SYMBOLS LEGEND and replace it with attached PLANS SHEET NO. ADD. 1 A-001 ABBREVIATIONS

AND SYMBOLS LEGEND.

2. Delete PLANS SHEET NO. A-104 ENLARGED FLOOR PLAN – CBP FLOORING and replace it with attached PLANS SHEET NO. ADD. 1 A-104 ENLARGED FLOOR

PLAN – CBP FLOORING.

3. Delete PLANS SHEET NO. A-601 FINISH SCHEDULES and replace it with attached

PLANS SHEET NO. ADD. 1 A-601 FINISH SCHEDULES.

4. Delete PLANS SHEET NO. A-603 SIGNAGE SCHEDULE AND MOUNTING

HEIGHTS and replace it with attached PLANS SHEET NO. ADD. 1 A-603 SIGNAGE

SCHEDULE AND MOUNTING HEIGHTS.

5. Delete PLANS SHEET NO. A-604 FURNITURE & EQUIPMENT PLAN AND

FURNITURE SCHEDULE and replace it with attached PLANS SHEET NO. ADD. 1

A-604 FURNITURE & EQUIPMENT PLAN AND FURNITURE SCHEDULE.

The following is provided for information.

F. PRE-BID MEETING MINUTES

1. The attached PRE-BID MEETING MINUTES and ATTENDANCE SHEET are provided for information.

G. RESPONSES TO REQUESTS FOR INFORMATION (RFI’S/QUESTIONS)

1. The attached RESPONSES TO REQUESTS FOR INFORMATION are provided for information.

Please acknowledge receipt of this ADDENDUM NO. 1 by recording the date of its receipt in the space provided on the PAGE P-4 of the Proposal.

CURT T. OTAGURO

Deputy Director of Transportation for Airports

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

r08/13/2026

NOTICE TO BIDDERS

Hawaii Revised Statutes (HRS), Chapter 103D

The receiving of bids for CBP FIS RENOVATION, DANIEL K. INOUYE

INTERNATIONAL AIRPORT, HONOLULU, OAHU, HAWAII,

PROJECT NO. CO1433-33, will begin as of the HIePRO Release Date. Bidders shall register and submit complete bids through HIePRO only. Refer to the following HIePRO link for important information on Vendor Registration: https://hiepro.ehawaii.gov/welcome.html.

The solicitation plans, specifications, proposal, and additional documents designated or incorporated by reference shall be available in HIePRO.

HIePRO OFFER DUE DATE & TIME scheduled for August 14, 2026, at 2:00 p.m., Hawaii Standard Time (HST), is HEREBY POSTPONED until August 28, 2026, at

2:00 p.m., HST. Bidders shall submit and upload the complete proposal to HIePRO prior to the offer due date and time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not include confidential and/or proprietary documents as part of their proposal. The record of each bidder and their respective proposal shall be open to public inspection. FAILURE TO

UPLOAD THE PROPOSAL TO HIePRO SHALL BE GROUNDS FOR REJECTION.

CURT T. OTAGURO

Deputy Director of Transportation for Airports

CBP FIS RENOVATION ADDENDUM NO. 1

DANIEL K. INOUYE INTERNATIONAL AIRPORT TABLE OF CONTENTS

STATE PROJECT NO. CO1433-33 TOC 1 of 3

TABLE OF CONTENTS

Page

Instructions for Contractor’s Licensing ............................................................................... HAI

Special Provisions .............................................................................................. SP-1 to SP-5

Wage Rate Schedule (Not physically included in the Bid Documents)

SPECIFICATIONS PART I - GENERAL PROVISIONS

SPECIFICATION PART II – TECHNICAL PROVISIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01010 DESCRIPTION OF WORK ........................................... 01010-1 to 01010-6 SECTION 01210 ALLOWANCES ............................................................. 01210-1 to 01210-3 SECTION 01300 SUBMITTALS ............................................................... 01300-1 to 01300-8 SECTION 01310 PROJECT MANAGEMENT AND COORDINATION ...... 01310-1 to 01310-4 SECTION 01330 SUBMITTAL PROCEDURES ........................................ 01330-1 to 01330-8 SECTION 01400 CONTRACTOR QUALITY CONTROL PROGRAM .......01400-1 to 01400-8 SECTION 01524 CONSTRUCTION WASTE MANAGEMENT ..................01524-1 to 01524-8 SECTION 01533 BARRICADES ................................................................................ 01533-1

SECTION 01560 GENERAL ENVIRONMENTAL, HEALTH,

AND SAFETY CONTROLS .......................................................... 01560-1 to 01560-4

SECTION 01561 CONSTRUCTION SITE POLLUTION

CONTROLS ................................................................................ 01561-1 to 01561-12

SECTION 01562 MANAGEMENT OF CONTAMINATED

MEDIA, SOIL DISPOSAL, AND SOIL REUSE ............................ 01562-1 to 01562-14 SECTION 01565 SECURITY MEASURES ............................................... 01565-1 to 01565-2 SECTION 01580 TEMPORARY FACILITIES AND UTILITIES ................. 01580-1 to 01580-2 SECTION 01581 PROJECT IDENTIFICATION ........................................ 01581-1 to 01581-3 SECTION 01600 PRODUCT REQUIREMENTS ...................................... 01600-1 to 01600-4

SECTION 01611 VOLATILE ORGANIC COMPOUND (VOC)

CONTENT RESTRICTIONS ......................................................... 01611-1 to 01611-3 SECTION 01700 EXECUTION AND CLOSEOUT REQUIREMENTS .... 01700-1 to 01700-12

SECTION 01715 EXISTING CONDITIONS – HAZARDOUS

MATERIALS SURVEY .................................................................. 01715-1 to 01715-3

ATTACHMENT 1 – HAZARDOUS MATERIALS SURVEY REPORT IN

SUPPORT OF THE STATE OF HAWAII DEPARTMENT OF

TRANSPORTATION-AIRPORTS DIVISION STATE PROJECT

NO. DO33 – CO1433-33 – CBP FIS RENOVATION ......................................... 1 to 30

ATTACHMENT 2 – STATE OF HAWAII DEPARTMENT OF TRANSPORTATION

AIRPORTS DIVISION HAZARDOUS MATERIALS REVIEW FORM

ATTACHMENT 3 – ARSENIC IN CANEC CEILINGS AND WALLBOARD

IN HAWAII .......................................................................................................... 1 to 3 SECTION 01780 CLOSEOUT SUBMITTALS .............................................01780-1 to 01780-5

SECTION 01800 SPECIAL REQUIREMENTS FOR CONTRACTORS

ON THE AOA ............................................................................... 01800-1 to 01800-8

STATE PROJECT NO. CO1433-33 TOC 2 of 3

DIVISION 2 – EXISTING CONDITIONS

SECTION 02070 DEMOLITION AND REMOVAL .................................... 02070-1 to 02070-6 SECTION 02410 SELECTIVE DEMOLITION ........................................... 02410-1 to 02410-6

DIVISION 3 – CONCRETE

SECTION 03730 CONCRETE REPAIR ................................................. 03730-1 to 03730-10

DIVISION 4 (Not Used)

DIVISION 5 – METALS

SECTION 05120 STRUCTURAL STEEL ................................................. 05120-1 to 05120-9

DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES

SECTION 06100 ROUGH CARPENTRY ................................................ 06100-1 to 06100-2

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

SECTION 07520 MODIFIED BITUMINOUS MEMBRANE ROOFING ..... 07520-1 to 07520-4 SECTION 07620 SHEET METAL FLASHING AND TRIM ....................... 07620-1 to 07620-3 SECTION 07920 JOINT SEALANTS ....................................................... 07920-1 to 07920-4

DIVISION 8 – DOORS AND FRAMES

SECTION 08111 HOLLOW METAL DOORS AND FRAMES .................. 08111-1 to 08111-5 SECTION 08431 ALUMINUM-FRAMED STOREFRONTS ....................... 08431-1 to 08431-5 SECTION 08710 DOOR HARDWARE .................................................... 08710-1 to 08710-7 SECTION 08800 GLAZING ..................................................................... 08800-1 to 08800-5

DIVISION 9 – FINISHES

SECTION 09211 GYPSUM BOARD ASSEMBLIES ................................ 09211-1 to 09211-4 SECTION 09221 NON-STRUCTURAL METAL FRAMING ...................... 09221-1 to 09221-4 SECTION 09510 ACOUSTICAL CEILINGS ............................................ 09510-1 to 09510-4 SECTION 09650 RESILIENT FLOORING ............................................... 09650-1 to 09650-5 SECTION 09670 FLUID APPLIED FLOORING ....................................... 09670-1 to 09670-3 SECTION 09681 TILE CARPETING ....................................................... 09681-1 to 09681-3 SECTION 09911 EXTERIOR PAINTING ................................................. 09911-1 to 09911-5 SECTION 09912 INTERIOR PAINTING ................................................... 09912-1 to 09912-7

DIVISION 10 – SPECIALTIES

SECTION 10142 PANEL SIGNAGE ........................................................ 10142-1 to 10142-3

DIVISION 11 – EQUIPMENT

STATE PROJECT NO. CO1433-33 TOC 3 of 3

SECTION 11150 SECURITY CONTROL SYSTEM ................................ 11150-1 to 11150-12

DIVISION 12 (Not Used)

DIVISION 13 – SPECIAL CONSTRUCTION

SECTION 13281 REMOVAL AND DISPOSAL OF

ASBESTOS CONTAINING MATERIALS .................................... 13281-1 to 13281-23 SECTION 13282 LEAD PAINT CONTROL MEASURES ....................... 13282-1 to 13282-18

SECTION 13284 REMOVAL AND DISPOSAL OF ARSENIC-CONTAINING BUILDING

PRODUCTS ............................................................................... 13284-1 to 13284-16 SECTION 13288 TESTING AND AIR MONITORING ............................ 13288-1 to 13288-12 SECTION 13851 ADDRESSABLE FIRE ALARM SYSTEM ................... 13851-1 to 13851-22

DIVISION 14 (Not Used)

DIVISION 15 – MECHANICAL

SECTION 15011 GENERAL MECHANICAL PROVISIONS ..................... 15011-1 to 15011-9 SECTION 15600 AIR CONDITIONING AND VENTILATION ................. 15600-1 to 15600-20

DIVISION 16 – ELECTRICAL

SECTION 16050 ELECTRICAL WORK ................................................. 16050-1 to 16050-13 SECTION 16510 LIGHTING ..................................................................... 16510-1 to 16510-5 SECTION 16711 PATHWAYS FOR COMMUNICATIONS SYSTEMS ... 16711-1 to 16711-10

SECTION 16713 SLEEVE AND SLEEVE SEALS FOR

COMMUNICATIONS PATHWAYS AND CABLING ....................... 16713-1 to 16713-5 SECTION 16717 COMMUNICATIONS HORIZONTAL CABLING ......... 16717-1 to 16717-15

APPENDIX A: CONTRACTOR-PROCURED EQUIPMENT LIST ...................................... A-1

Requirements of Chapter 104, HRS (eH104-3, Rev 05/24) ............................................ 1 to 2

Proposal .................................................................................................................. P-1 to P-8

Proposal Schedule ................................................................................................ P-9 to P-10

Surety Bid Bond

FORMS

Sample Contract Performance Bond (Surety) Performance Bond Labor and Material Payment Bond (Surety) Labor and Material Payment Bond Chapter 104, HRS Compliance Certificate Certification of Compliance for Employment of State Residents Provisions to be Included in Construction Procurement Solicitation

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

RESILIENT FLOORING

09650-1 r08/13/2026

SECTION 09650 – RESILIENT FLOORING

PART 1 – GENERAL

1.01 RELATED DOCUMENTS

The General Provisions for Construction Projects (2016), Special Provisions and General Requirements of the Specifications, apply to the work specified in this Section

1.02 REFERENCE STANDARDS

A. ASTM E648 - Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source; 2025a.

B. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring; 2022.

C. ASTM F1861 - Standard Specification for Resilient Wall Base; 2021 (Reapproved 2025).

D. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride; 2023.

E. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes; 2019a.

F. ASTM F3261 - Standard Specification for Resilient Flooring in Modular Format with Rigid Polymeric Core; 2020.

G. NFPA 253 - Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source; 2023.

H. RFCI (RWP) - Recommended Work Practices for Removal of Resilient Floor Coverings; 2018.

1.03 SUBMITTALS

A. See SECTION 01300 - SUBMITTALS.

B. Verification Samples: Submit two samples, 6 by 6 inch (___ by ___ mm) in size illustrating color and pattern for each resilient flooring product specified.

C. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) test reports.

D. Installer's Qualification Statement.

E. Maintenance Data: Include maintenance procedures, recommended maintenance materials, and suggested schedule for cleaning, stripping, and re-waxing.

6 66 6

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

RESILIENT FLOORING

09650-2 r08/13/2026

F. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.

1. See Section 01600 - PRODUCT REQUIREMENTS, for additional provisions.

2. Extra Flooring Material: 100 square feet (_____ square meters) of each type and color.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Upon receipt, immediately remove any shrink-wrap and check materials for damage and the correct style, color, quantity and run numbers.

B. Store all materials off of the floor in an acclimatized, weather-tight space.

PART 2 – PRODUCTS

2.01 TILE FLOORING

A. Resilient Tile with Rigid Polymeric Core: Printed film type, with transparent or translucent wear layer; polymeric rigid core with or without backing.

1. Manufacturers:

a. HMTX Industries, LLC; Elemental Multi-Layer 0.55 : www.hmtxcommercial.com/#sle.

b. Karndean Designflooring; Karndean Korlok Select: www.karndean.com/#sle.

2. Minimum Requirements: Comply with ASTM F3261, Class I; Type B - Embossed;

Grade 1 - Commercial.

3. Critical Radiant Flux (CRF): Minimum 0.45 watt per square centimeter, when tested in accordance with ASTM E648.

4. Plank Tile Size: 6 by 36 inches (150 by 914 mm).

5. Wear Layer Thickness: 0.020 inch (0.5 mm).

6. Total Thickness: 0.26 inch (6.5 mm).

7. Color: As indicated on drawings.

B. Static Control Tile - Type RES-2: Homogeneous; color and pattern throughout thickness.

1. Manufacturers:

a. Flexco Corporation; Delane ESD Vinyl: www.flexcofloors.com/#sle.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

RESILIENT FLOORING

09650-3 r08/13/2026

b. Roppe Corporation; ESD Vinyl Static Control Tile: www.roppe.com/#sle.

2. Critical Radiant Flux (CRF): Minimum 0.45 watt per square centimeter, when tested in accordance with ASTM E648 or NFPA 253.

3. Tile Size: 12 by 12 inch (305 by 305 mm).

4. Total Thickness: 0.125 inch (3 mm).

5. Color: To be selected by Architect from manufacturer's full range.

2.02 RESILIENT BASE

A. Resilient Base: ASTM F1861, Type TP, rubber, thermoplastic; provide cove base at resilient or solid flooring and straight base at carpet tile flooring.

1. Height: 4 inches (100 mm).

2. Thickness: 0.125 inch (3.2 mm).

3. Finish: Satin.

4. Length: Roll.

5. Color: To be selected by Architect from manufacturer's full range.

6. Accessories: Premolded external corners and internal corners.

2.03 ACCESSORIES

A. Primers, Adhesives, and Seam Sealer: Waterproof; types recommended by flooring manufacturer.

B. Adhesive for Vinyl Flooring: as recommended by flooring manufacturer.

C. Moldings, Transition and Edge Strips: Same material as flooring.

D. Copper Grounding Strips: Type and size as recommended by static control flooring manufacturer.

PART 3 – EXECUTION

3.01 EXAMINATION

A. Verify that surfaces are flat to tolerances acceptable to flooring manufacturer, free of cracks that might telegraph through flooring, clean, dry, and free of curing compounds, surface hardeners, and other chemicals that might interfere with bonding of flooring to substrate.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

RESILIENT FLOORING

09650-4 r08/13/2026

B. Verify that wall surfaces are smooth and flat within the tolerances specified for that type of work, are dust-free, and are ready to receive resilient base.

C. Cementitious Subfloor Surfaces: Verify that substrates are ready for resilient flooring installation by testing for moisture and alkalinity (pH).

1. Test as Follows:

a. Alkalinity (pH): ASTM F710.

b. Internal Relative Humidity: ASTM F2170.

c. Moisture Vapor Emission: ASTM F1869.

2. Obtain instructions if test results are not within limits recommended by resilient flooring manufacturer and adhesive materials manufacturer.

3.02 PREPARATION

A. Remove existing resilient flooring and flooring adhesives; follow the recommendations of RFCI (RWP).

B. Prepare floor substrates as recommended by flooring and adhesive manufacturers.

C. Remove subfloor ridges and bumps. Fill minor low spots, cracks, joints, holes, and other defects with subfloor filler to achieve smooth, flat, hard surface.

D. Prohibit traffic until filler is fully cured.

E. Clean substrate.

3.03 INSTALLATION - GENERAL

A. Starting installation constitutes acceptance of subfloor conditions.

B. Install in accordance with manufacturer's written instructions.

C. Adhesive-Applied Installation:

1. Fit joints and butt seams tightly.

2. Set flooring in place, press with heavy roller to attain full adhesion.

D. Where type of floor finish, pattern, or color are different on opposite sides of door, terminate flooring under centerline of door.

E. Install edge strips at unprotected or exposed edges, where flooring terminates, and where indicated.

1. Resilient Strips: Attach to substrate using adhesive.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

RESILIENT FLOORING

09650-5 r08/13/2026

F. Scribe flooring to walls, columns, cabinets, floor outlets, and other appurtenances to produce tight joints.

3.04 INSTALLATION - TILE FLOORING

Mix tile from container to ensure shade variations are consistent when tile is placed, unless otherwise indicated in manufacturer's installation instructions.

3.05 INSTALLATION - RESILIENT BASE

A. Fit joints tightly and make vertical. Maintain minimum dimension of 18 inches (45 mm) between joints.

B. Install base on solid backing. Bond tightly to wall and floor surfaces.

3.06 CLEANING

A. Remove excess adhesive from floor, base, and wall surfaces without damage.

B. Clean in accordance with manufacturer's written instructions.

3.07 PROTECTION

Prohibit traffic on resilient flooring for 48 hours after installation.

PART 4 – MEASUREMENT AND PAYMENT

4.01 BASIS OF MEASUREMENT AND PAYMENT

Work under this section will not be measured nor paid for separately but shall be considered incidental to and included in the prices bid for the various items of work in this project.

END OF SECTION

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

FLUID-APPLIED FLOORING

09670-1 r08/13/2026

SECTION 09670 – FLUID-APPLIED FLOORING

PART 1 – GENERAL

1.01 RELATED DOCUMENTS

The General Provisions for Construction Projects (2016), Special Provisions and General Requirements of the Specifications, apply to the work specified in this Section.

1.02 REFERENCE STANDARDS

A. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring; 2022.

B. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride; 2023.

C. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes; 2019a.

1.03 SUBMITTALS

A. See SECTION 01300 – SUBMITTALS.

B. Product Data: Provide data on specified products, describing physical and performance characteristics; sizes, patterns and colors available; and limitations.

C. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) test reports.

D. Manufacturer's Installation Instructions: Indicate special procedures, perimeter conditions requiring special attention, and application rate for each coat.

E. Manufacturer's Qualification Statement.

F. Maintenance Data: Include maintenance procedures, recommended maintenance materials, procedures for stain removal, repairing surface, and suggested schedule for cleaning.

1.04 DELIVERY, STORAGE, AND HANDLING

Store resin materials in a dry, secure area.

PART 2 – PRODUCTS

2.01 FLUID-APPLIED FLOORING SYSTEMS

A. Fluid-Applied Flooring Type EPX-1: Epoxy, with aggregate.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

FLUID-APPLIED FLOORING

09670-2 r08/13/2026

1. Aggregate: manufacturer's standard texture granules.

2. System Thickness: 40 mils (1 mm), nominal, dry film thickness (DFT).

3. Texture: Slip resistant.

4. Sheen: Gloss.

5. Color: As selected by Architect.

6. Products:

a. Mapei Corporation; Mapefloor System 31: www.mapei.com/#sle.

b. PPG Flooring; 912 LV Epoxy Primer/Sealer with 610 SL Self-Leveling Epoxy and Epoxy Siloxane FLR650-0 Series, Gloss: www.pittsburghpaintsco.com/#sle and www.ppgpmc.com/home.aspx/#sle.

c. TNEMEC; 1/16" to 1/8" Pigmented High-Wear System: www.tnemec.com/#sle.

d. Westcoat Specialty Coating Systems; Double Broadcast Epoxy Dubro Quartz: www.westcoat.com/#sle.

PART 3 – EXECUTION

3.01 EXAMINATION

A. Verify that subfloor surfaces are dust-free and free of substances that could impair bonding of materials to subfloor surfaces.

B. Cementitious Subfloor Surfaces: Verify that substrates are ready for fluid-applied flooring installation by testing for moisture and alkalinity (pH).

1. Test as Follows:

a. Alkalinity (pH): ASTM F710.

b. Internal Relative Humidity: ASTM F2170.

c. Moisture Vapor Emission: ASTM F1869.

2. Obtain instructions if test results are not within limits recommended by fluid-applied flooring manufacturer.

3.02 PREPARATION

A. Remove subfloor ridges and bumps. Fill low spots, cracks, joints, holes, and other defects with subfloor filler.

B. Vacuum clean substrate.

C. Apply primer to surfaces required by flooring manufacturer.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

FLUID-APPLIED FLOORING

09670-3 r08/13/2026

3.03 INSTALLATION - FLOORING

A. Apply in accordance with manufacturer's instructions.

B. Apply each coat to minimum thickness required by manufacturer.

C. Finish to smooth level surface.

3.04 PROTECTION

A. Prohibit traffic on floor finish for 48 hours after installation.

B. Barricade area to protect flooring until fully cured.

PART 4 – MEASUREMENT AND PAYMENT

4.01 BASIS OF MEASUREMENT AND PAYMENT

Work under this section will not be measured nor paid for separately but shall be considered incidental to and included in the prices bid for the various items of work in this project.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

TILE CARPETING

09681-1 r08/13/2026

SECTION 09681 – TILE CARPETING

PART 1 – GENERAL

1.01 RELATED DOCUMENTS

The General Provisions for Construction Projects (2016), Special Provisions and General Requirements of the Specifications, apply to the work specified in this Section.

1.02 REFERENCE STANDARDS

A. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring; 2022.

B. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride; 2023.

C. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes; 2019a.

1.03 SUBMITTALS

A. See SECTION 01300 - SUBMITTALS.

B. Product Data: Provide data on specified products, describing physical and performance characteristics; sizes, patterns, colors available, and method of installation.

C. Samples: Submit two carpet tiles illustrating color and pattern design for each carpet color selected.

D. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) test reports.

E. Manufacturer's Qualification Statement.

PART 2 – PRODUCTS

2.01 MATERIALS

Tile Carpeting, Type CPT-1: Tufted, manufactured in one color dye lot.

2.02 ACCESSORIES

A. Subfloor Filler: White premix latex; type recommended by flooring material manufacturer.

B. Edge Strips: Embossed aluminum, color as selected by Architect.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

TILE CARPETING

09681-2 r08/13/2026

C. Adhesives:

1. Compatible with materials being adhered; maximum VOC content of 50 g/L; CRI (GLP) certified; in lieu of labeled product, independent test report showing compliance is acceptable.

D. Carpet Tile Adhesive: Recommended by carpet tile manufacturer; releasable type.

PART 3 – EXECUTION

3.01 EXAMINATION

A. Verify that subfloor surfaces are dust-free and free of substances that could impair bonding of adhesive materials to subfloor surfaces.

B. Cementitious Subfloor Surfaces: Verify that substrates are ready for flooring installation by testing for moisture and alkalinity (pH).

1. Test as Follows:

a. Alkalinity (pH): ASTM F710.

b. Internal Relative Humidity: ASTM F2170.

c. Moisture Vapor Emission: ASTM F1869.

2. Obtain instructions if test results are not within limits recommended by flooring material manufacturer and adhesive materials manufacturer.

3.02 PREPARATION

A. Prepare floor substrates as recommended by flooring and adhesive manufacturers.

B. Remove subfloor ridges and bumps. Fill minor or local low spots, cracks, joints, holes, and other defects with subfloor filler.

C. Apply, trowel, and float filler to achieve smooth, flat, hard surface. Prohibit traffic until filler is cured.

D. Vacuum clean substrate.

3.03 INSTALLATION

A. Starting installation constitutes acceptance of subfloor conditions.

B. Install carpet tile in accordance with manufacturer's instructions.

C. Blend carpet from different cartons to ensure minimal variation in color match.

D. Cut carpet tile clean. Fit carpet tight to intersection with vertical surfaces without gaps.

STATE PROJECT NO. CO1433-33

ADDENDUM NO. 1

TILE CARPETING

09681-3 r08/13/2026

E. Lay carpet tile in square pattern, with pile direction parallel to next unit, set parallel to building lines.

F. Trim carpet tile neatly at walls and around interruptions.

G. Complete installation of edge strips, concealing exposed edges.

PART 4 – MEASUREMENT AND PAYMENT

4.01 BASIS OF MEASUREMENT AND PAYMENT

Work under this section will not be measured nor paid for separately but shall be considered incidental to and included in the prices bid for the various items of work in this project

ADDENDUM NO.1

r08/13/2026STATE PROJECT NO. CO1433-33

P-1

PROPOSAL TO THE

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

PROJECT:

PROJECT NO.:

CBP FIS Renovation Daniel K. Inouye International Airport Honolulu, Oahu, Hawaii

CO1433-33

COMPLETION TIME:

LIQUIDATED DAMAGES:

PROJECT MANAGER:

ELECTRONIC SUBMITTAL:

TWO HUNDRED SEVENTY (270) calendar days from the date indicated in the Notice to Proceed from the Department.

FIVE HUNDRED DOLLARS ($500.00) for each and every calendar day which the Contractor has delayed the completion of this project.

Ms. Erin Hashimoto Department of Transportation Airports Daniel K. Inouye International Airport 400 Rodgers Boulevard, Suite 700 Honolulu, HI 96819-1880 Phone: (808) 838-8803 Email: erin.a.hashimoto@hawaii.gov

Bidders shall submit and upload the complete proposal to HIePRO prior to the bid opening date and time. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. See SPECIAL PROVISIONS 2.8

PREPARATION AND DELIVERY

OF BID for complete details. FAILURE TO UPLOAD THE COMPLETE PROPOSAL TO HIePRO SHALL

BE GROUNDS FOR REJECTION OF THE BID.

AIR-HAR

P-2

Director of Transportation 869 Punchbowl Street Honolulu, Hawaii 96813

Dear Sir:

The undersigned Bidder declares the following:

1. It has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this proposal.

2. It has not been assisted or represented on this matter by any individual who has, in a State capacity, been involved in the subject matter of this contract within the past two years.

3. It has not and will not, either directly or indirectly offered or given a gratuity

(i.e. an entertainment or gift) to any State or County employee to obtain a contract or favorable treatment under a contract.

The undersigned Bidder further agrees to the following:

1. If this proposal is accepted, it shall execute a contract with the Department to provide all necessary labor, machinery, tools, equipment, apparatus and any other means of construction, to do all the work and to furnish all the materials specified in the contract in the manner and within the time therein prescribed in the contract, and that it shall accept in full payment therefore the sum of the unit and/or lump sum prices as set forth in the attached proposal schedule for the actual quantities of work performed and materials furnished and furnish satisfactory security in accordance with Section 103D-324, Hawaii Revised Statutes, within 10 days after the award of the contract or within such time as the Director of Transportation may allow after the undersigned has received the contract documents for execution, and is fully aware that non-compliance with the aforementioned terms will result in the forfeiture of the full amount of the bid guarantee required under Section 103D-323, Hawaii Revised Statutes.

2. That the quantities given in the attached proposal schedule are approximate only and are intended principally to serve as a guide in determining and comparing the bids.

3. That the Department does not either expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit portions of the work, as may be deemed necessary or advisable by the Director of Transportation, and that all increased or decreased quantities of work shall be performed at the unit prices set forth in the attached proposal schedule except as provided for in the specifications.

P-3

4. In case of a discrepancy between unit prices and the totals in said Proposal Schedule, the unit prices shall prevail.

5. Agrees to begin work within 10 working days after the date of notification to commence with the work, which date is in the notice to proceed, and shall finish the entire project within the time prescribed.

6. The Director of Transportation reserves the right to reject any or all bids and to waive any defects when in the Director’s opinion such rejections or waiver will be for the best interest of the public.

7. The undersigned Bidder further agrees to the following: Pursuant to HRS

§103D-405(d), any contractor (including consultants) paid for services to develop or prepare specifications or work statements shall be precluded from submitting an offer or receiving a contract for that particular solicitation. This includes the preparation of reports relied upon by HDOT in the development of the project scope.

The Bidder acknowledges receipt of and certifies that it has completely examined the following listed items: the Hawaii Department of Transportation, Air and Water Transportation Facilities Division General Provisions for Construction Projects dated 2016, the Notice to Bidders, the Special Provisions, if any, the Technical Provisions, the Proposal, the Contract and Bond Forms, and the Project Plans.

In accordance with Section 103D-323, Hawaii Revised Statutes, this proposal is accompanied with a bid security in the amount of 5% of the total amount bid, in the form checked below. (Check applicable bid security submitted with bid.)

Surety Bid Bond (Use standard form), Cash, Cashier’s Check, Certified Check, or

(Fill in other acceptable security.)

P-4

The undersigned Bidder acknowledges receipt of any addendum issued by the Department by recording in the space below the date of receipt.

Addendum No. 1 Addendum No. 3

Addendum No. 2 Addendum No. 4

In accordance with Section 103D-302, Hawaii Revised Statutes, the undersigned as Bidder, has listed the name of each person or firm, who will be engaged by the Bidder on the project as a Subcontractor or Joint Contractor and the nature of work to be done by each. The Bidder must adequately and unambiguously disclose the unique nature and scope of the work to be performed by each Subcontractor or Joint Contractor. For each listed firm, the Bidder declares the respective firm is a Subcontractor or Joint Contractor and is subject to evaluation as a Subcontractor or Joint Contractor. It is understood that failure to comply with the aforementioned requirements may be cause for rejection of the bid submitted.

Name of Subcontractor Nature and Scope of Work

1.

2.

3.

4.

5.

6.

7.

8.

Name of Joint Contractor Nature and Scope of Work

1.

2.

3.

NOTES:

"None" or if left blank indicates no Subcontractor or Joint Contractor.

If more space is needed, attach additional sheets.

P-5

The undersigned hereby certifies that the bid prices contained in the attached proposal schedule have been carefully checked and are submitted as correct and final.

This declaration is made with the understanding that the undersigned is subject to the penalty of perjury under the laws of the United States and is in violation of the Hawaii Penal Code, Section 710-1063, unsworn falsification to authorities, of the Hawaii Revised Statutes, for knowingly rendering a false declaration.

Bidder (Company Name)

By Authorized Signature

Print Name and Title

Business Address

Business Telephone

Date

Contact Person (If different from above)

Phone: Email:

NOTE:

If Bidder is a CORPORATION, the legal name of the corporation shall be set forth above, the corporate seal affixed, together with the signature(s) of the officer(s) authorized to sign contracts for the corporation. Please attach to this page current (not more than six months old) evidence of the authority of the officer(s) to sign for the corporation.

If Bidder is a PARTNERSHIP, the true name of the partnership shall be set forth above, with the signature(s) of the general partner(s). Please attach to this page current (not more than six months old) evidence of the authority of the partner authorized to sign for the partnership.

If Bidder is an INDIVIDUAL, the bidder's signature shall be placed above.

If signature is by an agent, other than an officer of a corporation or a partner of a partnership, a POWER OF ATTORNEY must be on file with the Department before opening bids or submitted with the bid. Otherwise, the Department may reject the bid as irregular and unauthorized.

P-6 AIR-HAR

r08/13/2026

PREFERENCES

Bidders acknowledge that while preferences are considered in the evaluation of bids, the award of the contract will be in the amount of the bid offered exclusive of any preferences.

A. HAWAII BIDDER PREFERENCE

In accordance with HRS §103D-302, the Hawaii bidder preference is applicable to this solicitation for evaluation purposes only. Bidders desiring to qualify for the five per cent (5%) preference shall submit with their bid a completed Hawaii Bidder/Offeror Preference Certification Form (Form SPO-081) at or before the time set for receipt of bids. Certifications submitted for previous or other solicitations will not be accepted.

( ) Yes, the Bidder elects to receive the Hawaii Bidder Preference and has included the Form SPO-081 with the bid.

B. APPRENTICESHIP AGREEMENT PREFERENCE

In accordance with HRS §103-55.6, the estimated value of this public works contract is $250,000 or more and the apprenticeship agreement preference is applicable to this solicitation for evaluation purposes only. Bidders desiring to qualify for the five per cent (5%) preference shall submit with their bid a complete, valid CERTIFICATION OF BIDDER’S PARTICIPATION IN APPROVED APPRENTICESHIP PROGRAM UNDER ACT 17 (Certification Form 1) for each apprenticeable trade the Bidder will employ on the project.

( ) Yes, the Bidder elects to receive the Apprenticeship Agreement Preference and has attached Certification Form(s) 1 for each apprenticeable trade the Bidder will employ for this project (excluding subcontractors).

By submission of this offer, the Bidder certifies that it has indicated all apprenticeable trades that Bidder will employ for this project (excluding subcontractors) by listing the applicable trades below:

(Attach additional sheet if necessary.)

Form 1 Required. Failure to submit a valid Form 1 with the bid for every apprenticeable trade that Bidder will employ on the project will result in the preference being denied, regardless of whether the trade is listed above. If a Form 1 is submitted for a trade that is not listed above, the Form 1 will take

P-7 AIR-HAR

r08/13/2026 precedence over the listing and may be used to qualify Bidder for the preference.

Form 2 Required. If awarded the contract with the Apprenticeship Agreement Preference applied, then for the duration of the contract, the Bidder shall certify each month that work is being conducted on the project that the Contractor continues to be a participant in the relevant apprenticeship program for each trade it employs. Monthly certification shall be made on the Certification Form 2 and submitted to the

HDOT.

Failure to comply with the requirements of the Apprenticeship Agreement Preference program will subject the Contractor to sanctions pursuant to HRS §103-55.6.

C. HAWAII PRODUCTS PREFERENCE

Hawaii Products Preference shall not apply to this solicitation.

D. RECYCLED PRODUCT PREFERENCE

Recycled Product Preference shall not apply to this solicitation.

STATE OF HAWAII

Hawaii Bidder/Offeror

Preference Certification Form (As Defined in HRS103D-1001)

I, ______________________________________, ___________________________________ of (Authorized Officer’s Name) (Office or Position Held)

_________________________________________, certify the following:

(Name of Bidder/Offeror)

(1) That the Bidder/Offeror holds a valid commercial place of business located in the State of Hawaii at the following address:

and that the above-named office was opened on the following date: ______________, and has been staffed by the Bidder/Offeror or an employee of the Bidder/Offeror for not less than two (2) consecutive years immediately preceding the time and date set for the opening of bids or receipt of proposals;

(2) That the bid or proposal in response to IFB/RFP No. ___________________, is submitted under the name under which the Bidder/Offeror is authorized to do business in the State;

(3) That not less than fifty-one percent (51%) of the total direct labor hours required for performance of the contract will be performed within the State; and

(4) If the Bidder/Offeror is a joint venture, the Bidder/Offeror is composed entirely of parties meeting the requirements of paragraphs (1), (2), and (3).

I certify under penalty of perjury that the above statements are true. I agree to maintain the above qualifications throughout contract performance; any changes in eligibility shall be reported to the Contract Administrator or purchasing agency's contact person identified in the RFP/IFB. I acknowledge that failure to maintain the above qualifications triggers a price adjustment equal to the value of the preference applied and may constitute cause for debarment under HRS §103D-702.

Signature of Authorized Officer

Print Name and Title

Date

Form SPO-081 (Rev. 07/01/2026)

P-8 ADDENDUM NO. 1

r08/13/2026 r07.01.26

DANIEL K. INOUYE INTERNATIONAL AIRPORT P-9

STATE PROJECT NO. CO1433-33 r08/13/2026

CBP FIS RENOVATION

Daniel K. Inouye International Airport

Honolulu, Oahu, Hawaii

Project No. CO1433-33

PROPOSAL SCHEDULE

Item No.

Description Approx Qty Unit Unit Price Total

01010.1 CBP FIS Renovation Lump Sum Lump Sum Lump Sum $

01210.1 Unforeseen Conditions Allowance Allowance Allowance $ 300,000.00

01210.2 Security Measures Allowance Allowance Allowance $ 20,000.00

01210.3 Furniture Allowance Allowance Allowance $ 50,000.00

01210.4 Equipment Allowance Allowance Allowance $ 100,000.00

01210.5 Security Control System Allowance Allowance Allowance $ 200,000.00

01561.1 Construction Site Pollution Controls

LS LS LS $

01562.1 Management of Contaminated Media, Soil Disposal, and Soil Reuse

LS LS LS $

01562.2 Additional Management of Contaminated Media, Soil Disposal, and Soil Reuse

Allowance Allowance Allowance $ 25,000.00

TOTAL AMOUNT FOR COMPARISION OF BIDS $

DANIEL K. INOUYE INTERNATIONAL AIRPORT P-10

STATE PROJECT NO. CO1433-33 r08/13/2026

NOTES:

The bid prices herein shall include all labor, materials, equipment, and incidentals necessary to construct all items in place, including installation and testing of equipment, complete and ready for operation, all in accordance with the plans and specifications.

Note 1: Bids shall include all Federal, State, County and other applicable taxes and fees.

Note 2: The TOTAL AMOUNT FOR COMPARISON OF BIDS shall be used to determine the lowest responsible bidder.

Note 3: Bidders shall complete all unit prices and amounts. Failure to do so shall be grounds for rejection of bid.

Note 4: The State reserves the right to reject any or all Bids and to waive any defects in said Bids in the best interest of the State.

Note 5: Submission of a Bid is a warranty that the bidder has made an examination of the project site and is fully aware of all conditions to be encountered in performing the work and the requirements of the plans and specifications.

Note 6: The bidder's attention is directed to Section 2.11 - BID SECURITY of the General Provisions as amended by the Special Provisions.

Note 7: Bidder shall be paid for actual work performed as directed by the Engineer for allowance items.

Bidder shall not be paid overhead and profit for unused allowance funds.

Note 8: If the TOTAL AMOUNT FOR COMPARISION OF BIDS exceeds the funds available for the project, then the State reserves the right to negotiate with the lowest, responsive, responsible bidder as permitted under Section 103D-302, Hawaii Revised Statutes (HRS), to further reduce the scope of work and award a contract thereafter.

Note 9: Bidders shall submit and upload the complete proposal to HIePRO prior to the bid opening date and time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not include confidential and/or proprietary documents with the proposal. The record of each bidder and respective bid shall be open to public inspection. Original (wet ink, hard copy) proposal documents are not required to be submitted. Contract award shall be based on evaluation of proposals submitted and uploaded to HIePRO.

FAILURE TO UPLOAD THE COMPLETE PROPOSAL TO HIePRO SHALL BE GROUNDS

FOR REJECTION OF THE BID.

If there is a conflict between the specification document and the HIePRO solicitation, the specifications shall govern and control, unless otherwise specified.

SYMBOLS LEGEND

ROOM DESIGNATION WALL TYPE

DOOR DESIGNATION GRIDLINE

SIGNAGE DESIGNATION

EXTERIOR ELEVATION DESIGNATION

WINDOW / LOUVER DESIGNATION

DETAIL DESIGNATION

REVISION DESIGNATION

BUILDING SECTION DESIGNATION

PLAN KEYNOTE

INTERIOR ELEVATION DESIGNATION

BREAK LINE

MATCHLINE

NORTH ARROW / PLAN NORTH

DATUM DESIGNATION

TITLE DESIGNATION

XX

XX

1 VIEW NAME 1

A101

SHT_NO

DET_NO

A101

X'XX" AFF CEILING HEIGHT DESIGNATION

XXXX

RM NO

ROOM NAME

XXXX

FURNITURE DESIGNATION

XXx

WALL SECTION DESIGNATION

XX

DET_NO

SHT_NO

SIM

LEVEL NAME

ELEVATION

GRAPHIC SCALE

1t

PLAN

NORTH

DET_NO

SHT_NO

SIM

DET_NO

SHT_NO

SIM

DET_NO

SHT_NO

SIM

DETAIL SECTION DESIGNATION

ABBREVIATIONS LEGEND

AB ANCHOR BOLT

ABS ACRYLONITRILE BUTADIENE STYRENE

ABV ABOVE

A/C AIR CONDITIONING

AC ASPHALTIC CONCRETE

ACP ACOUSTICAL CEILING PANEL

AD AREA DRAIN

ADDL ADDITIONAL

ADF ACCESSIBLE DRINKING FOUNTAIN

ADJ ADJACENT

AFF ABOVE FINISH FLOOR

AFS ABOVE FINISH SLAB

AGGR AGGREGATE

ALUM ALUMINUM

ALT ALTERNATE

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

A

B

BBQ BARBEQUE

BD BOARD

BFF BELOW FINISH FLOOR

BKBD BACK BOARD

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BM BEAM

BOD BOTTOM OF DECK

BOT F BOTTOM FACE

BOT BOTTOM

BR BEDROOM

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CFCI CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

CFOI CONTRACTOR FURNISHED /

OWNER INSTALLED

CG CORNER GUARD

CMPST COMPOSITE

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

COND CONDITION

CONN CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUE/CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COP COPPER

CORR CORRIDOR

CPT CARPET

CSK COUNTERSINK

CT CERAMIC TILE

CTR CENTER

CUH CABINET UNIT HEATER

CULT CULTURED

CW COLD WATER PIPING

D

D DEEP/DEPTH

DBL DOUBLE

DEG DEGREE

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DN DOWN

DR DOOR

DS DOWNSPOUT

DSP DRY STANDPIPE

DW DISHWASHER

DWG DRAWING

DWR DRAWER

E

E EAST

EA EACH

EIFS EXTERIOR INSULATION FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

EPB ELECTRICAL PANEL BOARD

EPDM ETHYLENE PROPYLENE DIENE MONOMER

ES EACH SIDE

EQ EQUAL

EQUIP EQUIPMENT

EOS EDGE OF SLAB

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXP EXPOSED

EXPN EXPANSION

EXT EXTERIOR

(E) EXISTING

F FAHRENHEIT

FA FIRE ALARM

FAB FABRICATE

FB FLAT BAR

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE, FIXTURES AND

EQUIPMENT

FGL FIBERGLASS

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIN FINISH

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLG FLOORING

FLR FLOOR

FLUOR FLUORESCENT

FLR SK FLOOR SINK

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FOW FACE OF WALL

FP FIRE PROOF

FR FRAME

FRP FIBERGLASS REINFORCED

PLASTIC

FRT FIRE RETARDANT

FRZ FREEZER

FT FEET

FTD FACIAL TISSUE DISPENSER

FTG FOOTING

FURG FURRING

FUT FUTURE

G NATURAL GAS

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GEN GENERAL

GFGI GOVERNMENT FURNISHED /

GOVERNMENT INSTALLED

GFRG GLASSFIBER REINFORCED GYPSUM

GFRC GLASSFIBER REINFORCED CONCRETE

GL GLASS/GLAZING

GLU LAM GLUE LAMINATED WOOD

GPM GALLONS PER MINUTE

GRAN GRANITE

GSB GYPSUM SHEATHING BOARD

GTV GATE VALVE

GWT GLAZED WALL TILE

GYP GYPSUM

GWB GYPSUM WALL BOARD

H HIGH

HB HOSE BIBB

HC HOLLOW CORE

HCP HANDICAPPED

HD HEAD

HDBD HARDBOARD

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HORIZ HORIZONTAL

HS HAND SINK

HT HEIGHT

HVAC HEATING, VENTILATION AND

AIR CONDITIONING

HW HOT WATER

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

F

G

H

I

ID INSIDE DIAMETER

INCL INCLUDED

IMP INSULATED METAL PANEL

IN INCH

INFO INFORMATION

INSUL INSULATION/INSULATED

INT INTERIOR

INV INVERT

J-BOX JUNCTION BOX

JAN JANITOR

JST JOIST

JT JOINT

KD KNOCK DOWN

KIT KITCHEN

KO KNOCK-OUT

KW KILOWATT

KWH KILOWATT HOUR

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LB POUND

LBF/SF POUNDS PER SQUARE FOOT

LDG LANDING

LF LINEAR FOOT

LH LEFT HAND

LKR LOCKER

LLV LONG LEG VERTICAL

LOC LOCATION

LT LIGHT

LR LIVING ROOM

LVR LOUVER

M METER

M2 SQUARE METER

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MBR MASTER BEDROOM

MC MEDICINE CABINET

MECH MECHANICAL

MEMB MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MI MIRROR

MID MIDDLE

MIN MINIMUM

MISC MISCELLANEOUS

MLDG MOULDING

MM MILLIMETER

MO MASONRY OPENING

MOD MODULE

MP METAL PANEL

MR MOISTURE RESISTANT

MTD MOUNTED

MTL METAL

MTG MOUNTING

MULL MULLION

MUN MUNTIN

MW MICROWAVE

N NORTH

NFS NON-FROST SUSCEPTIBLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OBS OBSCURE

OC ON CENTER

OD OUTSIDE DIAMETER

OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED / OWNER INSTALLED

OFD OVERFLOW DRAIN

OH OVER HANG

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OVHD OVER HEAD

J

K

L

M

N

O

P

PA PUBLIC ACCESS

PC PIECE

PCC PRECAST CONCRETE

PEND PENDANT

PERIM PERIMETER

PH PENTHOUSE

PLAS PLASTER

PLBG PLUMBING

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

PNL PANEL

PR PAIR

PROP PROPERTY

PREFAB PREFABRICATE

PT PAINT

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER

AND RECEPTACLE

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

QT QUARRY TILE

R RISER

R RADIUS

RA RETURN AIR

RB RUBBER BASE

RB HK ROBE HOOK

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFRIGERATOR

REFL REFLECTED

REG REGISTER

REINF REINFORCE

RECS RECOMMENDATIONS

REQD REQUIRED

RESIL RESILIENT

REST REST ROOM

REV REVISION

RTF RUBBER TILE FLOOR

RFG ROOFING

RLG RAILING

RH RIGHT HAND

RND ROUND

RM ROOM

RO ROUGH OPENING

RWL RAIN WATER LEADER

S SOUTH

SA SUPPLY AIR

SAB SOUND ATTENUATION BLANKET

SB SPLASH BLOCK

SC SOLID CORE

SCHED SCHEDULE

SCD SEAT COVER DISPENSER

SCP SCUPPER

SCR SHOWER CURTAIN ROD

SCRN SCREEN

SD SMOKE DETECTOR

SECT SECTION

SED SEE ELECTRICAL DRAWINGS

SF SQUARE FEET

SFNT STOREFRONT

SHT SHEET

SHR SHOWER

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SL SLOPE

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SND SANITARY NAPKIN DISPENSER

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPC SPACING

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SQ SQUARE

SSD SEE STRUCTURAL DRAWINGS

SST STAINLESS STEEL

SMD SEE MECHANICAL DRAWINGS

SMLS SEAMLESS

SS SOLID SURFACE

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SURR SURROUND

SUSP SUSPENDED

SVCE SERVICE

SW SWITCH

SYMM SYMMETRICAL

SYS SYSTEM

Q

R

S

T

T TREAD

TB TOWEL BAR

TBD TO BE DETERMINED

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

T&G TONGUE AND GROOVE

THRES THRESHOLD

THRU THROUGH

THK THICKNESS

TK BD TACK BOARD

TMPD TEMPERED

TOC TOP OF CURB

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF SLAB

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TS TUBE STEEL

TSH TOWEL SHELF

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

TLT TOILET

UBC UNIFORM BUILDING CODE

UC UNDERCUT

UNGD UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS OTHERWISE NOTED

UR URINAL

VAR VARIES

VB VALVE BOX

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VOL VOLUME

VP VENEER PLASTER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WIDE

W…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .