Canopy Group 2 – Cheatham Hill ES, East Side ES, Palmer MS

Closed State & local contract opportunity Posted

Solicitation number
B27005
State
Georgia
Responses due

Opportunity facts

Jurisdiction
NIGP code
UNSPSC codes
Show all 15

Opportunity details come from cobbk12.bonfirehub.com. Updated .

About this opportunity

Cobb County School District is requesting bids for canopy construction and site work at three school locations—Cheatham Hill Elementary, East Side Elementary, and Palmer Middle School—with proposals due September 3, 2026.

Cheatham Hill Elementary requires demolition of approximately 1,600 square feet of existing concrete sidewalk and design-build installation of a new canopy extending from the existing structure along the drive aisle to the building end, approximately 245 feet long and 8 feet wide at two different heights. The scope includes demolition and replacement of approximately 2,200 square feet of concrete at the front entrance, replacement of the existing flagpole, and new curb and gutter at all new sidewalk areas.

East Side Elementary base bid calls for installation of a new canopy at the main entrance extending from the existing canopy toward the drive aisle exit, approximately 75 feet long and 10 feet wide. Alternate #1 adds an L-shaped canopy at the side entry and ASP doorway, approximately 80 feet in length by 10 feet wide.

Palmer Middle School requires design and installation of a new canopy system extending from the front entrance to the drive aisle and continuing along the drive aisle for the full length of the student pick-up area, approximately 270 feet long with varying width per drawings.

The source does not specify estimated contract value, contract term, evaluation criteria, incumbent contractor, question-due date, or pre-bid meeting schedule.

Opportunity text

This project includes canopy work at three Cobb County School District locations, as outlined below: • Cheatham Hill Elementary School: Demolish approximately 1,600 square feet of existing concrete sidewalk at the canopy extension area. Design and install a new canopy extending from the existing canopy along the drive aisle to the end of the school building; 2 different heights. The canopy will be approximately 245 feet long and 8 feet wide. Demolish and replace approximately 2,200 square feet of concrete at the front entrance and replace the existing flagpole. New curb and gutter required at all new sidewalk areas. • East Side Elementary School: Base Bid- Install a new canopy at the main entrance, extending from the existing canopy toward the drive aisle exit. The canopy will be approximately 75 feet long and 10 feet wide. Alternate #1: Add a new canopy at the side Entry Canopy / ASP Doorway, L-shaped configuration, approximately 80' in length by 10' wide. • Palmer Middle School: Design and install a new canopy system extending from the front entrance to the drive aisle, then continuing along the drive aisle for the full length of the student pick-up area. The canopy will be approximately 270 feet long; width varies - please refer to the drawings.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity