Botanical Garden Conservatory
Closed State & local contract opportunity Posted
- Solicitation number
- PE-53900-RFP-2026-000000098
- State
- Georgia
- Responses due
Opportunity facts
- NIGP codes
- UNSPSC codes
- 72153100 Athletic and recreational facility construction services
- 72153103 Playground construction and equipment installation service
- 72153102 Indoor sport court construction service
- 95122306 Gymnasium
- 95122302 Sports ground
- 95121500 Commercial and entertainment buildings and structures
- 95121704 Prison building
- 95121503 Cafeteria
- 95121703 Court building
- 95121606 Railway station
Show all 48
- 95121701 Post office
- 72121105 Shopping center and mall construction service
- 72141401 Detention facility construction service
- 95121604 Bus garage
- 95121607 Railway depot
- 95121605 Automotive repair or servicing building
- 95121711 Civic center
- 72121408 Stadium construction service
- 72153106 Athletic field construction service
- 95122305 Spa
- 95122301 Stadium
- 95122303 Running track
- 72121100 Commercial and office building construction services
- 95121700 Public buildings and structures
- 72111104 New dormitory construction service
- 72111105 New hotel or motel construction service
- 72121101 Commercial and office building new construction service
- 72141128 Public square construction and or remodelling service
- 95121702 Police station
- 95121603 Bus station
- 95122106 Hostel
- 95121505 Shopping center
- 95121504 Shop building
- 95121714 Public changing room and shower facility
- 95121507 Market
- 95121706 Ambulance station
- 72141508 Blasting service except building demolition
- 72141510 Demolition services
- 95122300 Sports and health buildings and structures
- 95122304 Sports hall
- 72141400 Detention facility construction and repair services
- 72121104 Restaurant construction service
- 95121712 Art gallery
- 95121608 Underground railway station
- 95121501 Shopping mall
- 95121715 Public toilet facility
- 95121506 Theater
- 95121705 Fire station
- Point of contact
-
- Michelle Stewart mmstewart@georgiasouthern.edu (912) 478-5752
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Georgia Southern University, on behalf of the Board of Regents of the University System of Georgia, is requesting proposals for Construction Manager at-Risk (CM/GC) services for the Botanic Garden Conservatory in Statesboro, Georgia under RFP 26081, with proposals due August 17, 2026 at 2:00 p.m. A mandatory finalist site visit is scheduled for August 24, 2026, followed by finalist interviews on August 31, 2026.
The scope is preconstruction and construction management services for a new 4,000-square-foot climate-controlled glass conservatory with seating capacity of 175, including a Grand Hall, teaching stations, bride and groom suites, and public restrooms. The CM/GC must provide technical review, cost verification, value engineering, and schedule development during preconstruction, then manage construction. The delivery method requires engagement of a Design Professional and Commissioning Agent in addition to CM/GC services. Construction documents are anticipated in September 2026, with construction duration estimated at nine to twelve months.
The preliminary project cost limitation is approximately $8 million. The CM/GC must commit to a Guaranteed Maximum Price for all construction and site development under an Actual Cost plus Fixed Fee structure, operating as an open-book agreement where all savings return to the Owner. The project incorporates Energy Efficiency & Sustainable Construction Act requirements and Georgia Peach certification with commissioning.
Minimum qualifications include a current ratio of 1.0 or higher, Experience Modification Rating of 1.2 or less, valid Georgia General Contractor's License, and no debarment or suspension from any state or federal agency. The CM/GC must demonstrate bonding capacity of $42 million through an approved surety and carry Commercial General Liability Insurance with minimum limits of $1 million per occurrence and $2 million aggregate, plus commercial umbrella liability of at least $5 million per occurrence and general aggregate. Liquidated damages are estimated at $1,500 to $2,500 per day.
Evaluation weighting: relevance of experience and qualifications (20%), previous performance (15%), quality of management plan (15%), methodology presented at finalist interview (25%), and overall impression of firm and team (25%). Fee proposals are opened only for the highest-scoring firm after proposal and interview evaluations conclude.
Opportunity text
New Construction of a Conservatory
Files
| File | Type | Posted |
|---|---|---|
| 26081 RFP CM _ Botanical Garden Conservatory.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity