Bergen County is soliciting bids on an emergency generator installation project at its Record Storage Facility (RGL Building) in Rockleigh, New Jersey, with proposals due August 11, 2026. The work must comply with the Public Labor Agreement and is subject to a single prime contract structure.
The scope includes installation of a ground-mounted emergency generator on a new concrete pad with bollards adjacent to the existing building, a new transfer switch with all related electrical connections and equipment, utility connections, repair of the building envelope at all penetrations to maintain a watertight enclosure, and repairs or replacement of any damaged site conditions including paving, curbs, and landscaping. The contractor must prepare detailed submittals including a schedule of values, construction schedule using Primavera P6 software with CPM analysis, manpower-loaded schedule, and monthly cash flow curves. Work shall commence upon receipt of the Notice to Proceed and be substantially complete within 90 days from the date of building permit issuance. Work is limited to normal business hours of 8 a.m. to 5 p.m., Monday through Friday, and must coordinate with ongoing campus operations and training activities.
The project includes a $20,000 contingency allowance. The contractor absorbs all increases in labor rates and material costs and is responsible for coordination with separate contractors and the owner. Payment applications must comply with the New Jersey Prompt Payment Act with 30-day payment terms and include certified payroll documentation, union dues verification, notarized waivers of lien from all subcontractors, and construction photographs. Retainage withholding applies, with punch list work representing five percent of the total contract sum and closeout work representing three percent, released proportionally as work is completed. Liquidated damages apply for delays beyond the contract completion date. The architect will charge contractors $155 per hour for excessive RFI re-reviews at the architect's discretion.
Opportunity text
Installation of a new ground mounted Emergency Generator on a new concrete pad with bollards directly adjacent to the existing building. Installation of a new transfer switch and all related electrical connections and equipment associated with the generator. Utility connections for the generator as shown. Repair to the existing building to maintain a watertight enclosure at all penetrations. Repairs and replacement of any damaged site conditions including paving, curbs or landscape as required. Repairs as required to the building interior.
Files
| File | Type | Posted |
|---|---|---|
| RGL Generator Project Manual.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity