Addendum 1 BDC02-26/27 Blue Spring - Restroom Replacement

Closed State & local contract opportunity Posted

Solicitation number
ITB-16987
State
Florida
Responses due

Opportunity facts

Jurisdiction
NIGP codes
Show all 15
UNSPSC codes
Show all 20
Point of contact

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

The Florida Department of Environmental Protection (FDEP) Bureau of Design and Construction has issued Addendum 1 to BDC02-26/27 for Blue Spring State Park restroom replacement, with bids due October 6, 2026. Addendum 1 clarifies a 15% workforce utilization requirement that is central to the original bid specifications and must be acknowledged by signature and included with bid submission; failure to do so may result in bid rejection.

The 15% requirement applies to employees whose work counts toward the mandate. Employees need not be on the contractor's direct payroll at bid opening and may be hired after award is posted. Work performed by general contractors, project managers, superintendents, supervisors, schedulers, procurement, and administrative personnel qualifies toward the 15% calculation. All types of construction work—including concrete, masonry, carpentry, finishes, roofing, and other direct construction activities—qualify. The 15% is calculated based on total contract value rather than on construction labor costs, labor hours, or construction work value alone.

Bids must be submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida 32399-3000.

Opportunity text

September 16, 2026

NOTICE TO APPLICANTS

ADDENDUM NO. ONE (1)

Blue Spring State Park - Restroom Replacement

DEP BID NO. BDC02-26/27

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

1. Question: Must the employees whose work will be counted toward the required 15% be directly employed by [Contractor] and on its direct payroll at the time of Bid Opening, or may employees hired after Bid Opening or after award to perform construction work on the project also be counted toward the 15% requirement?

Answer: The employees do not have to be employed at the time of the Bid Opening. They may be hired after the award is posted.

2. Question: Can work performed by [Contractor's] General Contractor, Project Manager, Superintendent/Supervisor, scheduler, or procurement/purchasing personnel be included in the calculation of the 15%?

Answer: Yes, they can be included in the calculation.

3. Question: Can project management and administrative personnel be included in the calculation, or must the 15% consist exclusively of employees performing physical construction work?

Answer: Yes, they can be included in the calculation.

4. Question: If the 15% must include physical construction work, could you please clarify what types of construction work would qualify? For example, would concrete, masonry/block, carpentry, finishes, roofing, or other construction activities performed directly by [Contractor] employees qualify toward the 15% requirement?

Answer: All types of construction work are included.

5. Question: Is the 15% calculated based on the total contract value, the value of the construction work, labor costs, labor hours, or another methodology?

Answer: It is based on the total contract value.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.