- Salt Lake County is requesting bids on construction of the Hunter Park Trail Connection, a new concrete trail with site preparation, grading, hardscape installation, and irrigation adjustments at Hunter Park, 3500 S 5905 W, West Valley City, Utah, with bids due July 22, 2026. Bidders must hold Utah State Department of Commerce licensing: a minimum B-100, E-100, or S330 general contractor license, plus S330 landscape contractor and S260 general concrete contractor licenses. All first-tier...
- Farmington City is requesting sealed bids for construction of the Lower Farmington Creek Trail Project, with bids due July 16, 2026 at 2:00 p.m. local time at Farmington City Hall, 160 South Main Street, Farmington, Utah. The scope encompasses improvements and reroutes to the existing Farmington Creek Trail, including new trail construction, trail restoration, switchbacks, rock steps and stairways, rock retaining walls, bench cuts, fill material, standard culverts with rock headwalls, stair...
The City of Bountiful, Utah is procuring services for three major infrastructure projects: street improvements, hiking trail construction, and water line replacement. The 2026 Miscellaneous Concrete project involves removal and replacement of existing street improvements including sidewalks, curbs, gutters, drive approaches, waterways, and storm drain facilities at random locations throughout Bountiful City, with an estimated project cost of $1,008,811.35 and substantial completion required by March 15, 2027. The 2026 Big Rock Hiking Trail Project encompasses construction of two separate Class 3 hiking trail segments on United States Forest Service-managed public lands in the Mueller Park area: Schedule 1 comprises approximately 250 feet of trail with significant rock retaining and tread armoring work (estimated cost $43,000), and Schedule 2 comprises approximately 1.1 miles of trail with limited rock work (estimated cost $64,000), with substantial completion by October 31, 2026. The 2026 Water Line Projects involve replacement of culinary water facilities in residential neighborhoods, including furnishing and installing water main pipe in 6-inch and 8-inch diameters, valves, fittings, fire hydrants, and service connections, with all testing, flushing, and abandonment of existing pipes required; this project is divided into four schedules (three defined locations plus contingency work) with an estimated total cost of $1,967,564.00 and substantial completion required by October 15, 2026. Sealed bids for the Miscellaneous Concrete project were due February 10, 2026, bids for the Big Rock Hiking Trail Project were due March 3, 2026, and bids for the Water Line Projects are due April 21, 2026, all at 2:00 p.m. at the City Engineer's office located at 795 South Main Street, Bountiful, Utah, or through the U3P Bonfire eProcurement website. Bidders must provide five percent bid security in the form of certified check, cashier's check, or bid bond, become familiar with site conditions, and comply with all technical specifications detailed in extensive project documents including standard drive approach designs, retaining wall specifications, trail design parameters per US Forest Service standards, and water line trench details. Award decisions will be made within seven days after bids are opened, and successful bidders must furnish performance and payment bonds equal to 100 percent of the contract price and maintain specified insurance coverage including general liability ($3,000,000 minimum per occurrence), workers' compensation, automobile liability ($3,000,000 minimum), and environmental liability ($2,000,000 per claim). The City of Bountiful has not designated any set-asides for disadvantaged enterprises, small businesses, or other restricted categories in these procurements. All qualified contractors holding appropriate Utah State licensing are eligible to respond; the projects are not federally funded and do not require prevailing wage compliance or specific wage rate payments. Contractors must obtain proper licensing from the Utah State Department of Commerce, Division of Occupational and Professional Licensing, and all subcontractors must similarly be licensed. No incumbent vendors or current contractors are identified in the available procurement documents. For the hiking trail projects, contractors must coordinate with the United States Forest Service, and work cannot commence until the Forest Service and Bountiful City execute an agreement granting construction approval; additionally, no work may be performed while snow covers the ground due to wildlife habitat protection requirements, and any archaeological findings on Forest Service property require work cessation until USFS approval is obtained. For water line projects, the contractor is responsible for materials testing coordination with the City Engineering Department and scheduling shut-downs with the Water Department, while asphalt patching will be performed by the City's Street Department. Liquidated damages apply at rates varying by project type ($50-$200 per day for late completion and $100-$200 per day for utility interruptions), and the City reserves the right to reject any or all bids and waive any informality in bidding as deemed in its best interests.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
5-Type B Drive Approach 8-2017.pdf | 110KB | 1/13/26 | ||
7-Type A Drive Approach 8-2017.pdf | 116KB | 1/13/26 | ||
2-2026 Storm Drain Projects Bid Package.pdf | 2MB | 6/30/26 | ||
10-Type E Drive Approach 8-2017.pdf | 122KB | 1/13/26 | ||
5-5 USFS Decision Memo Bountiful Trails - UWC DecisionMemo Final signed.pdf | 255KB | 2/13/26 |