About this opportunity

The contract opportunity involves the repair of Cooling Tower 2 at the John J. Pershing VA Medical Center, including the removal and replacement of all leaking components, such as the complete coil assembly and associated piping connections. The contractor will also be responsible for conducting a thorough analysis of the entire system to ensure there are no additional leaking components, and cleaning all refrigeration piping with an approved product and drying with nitrogen. The period of performance is estimated to be approximately 120 calendar days after Notice to Proceed, with the solicitation expected to be posted on or about August 10, 2023.

Products and Services to be provided:

  1. Removal and replacement of all leaking components in Cooling Tower 2.
  2. Isolation and draining of condensing water piping necessary for the replacement.
  3. Thorough analysis of the entire system to identify any additional leaking components.
  4. Cleaning and drying of all refrigeration piping with an approved product and nitrogen.
  5. Verification of all steps of cleaning, drying, purging, and charging of refrigeration circuits.

Notice text

Pre-Solicitation Notice

Project Number 657A4-23-770 Repair Cooling Tower 2

NCO15 Contracting is asking for responsible vendors to meet the attached statement of work. This is a total set-aside for all SDVOSB vendors. The vendors must meet all evaluations factors as indicated in the solicitation document.

The Statement of Work is for performance of work associated with construction documents for the project 657A4-23-770 Repair Cooling Tower 2 at the John J. Pershing VA Medical Center, located at 1500 North Westwood Boulevard, Poplar Bluff, MO 63901. The contractor shall provide all services, materials, labor, supervision, safety, certification and expertise for items described in the provided Construction Documents; drawings and specifications. Work shall be phased in a manner that is not disruptive to Medical Center Operations.

Contractor shall remove and replace all leaking components to include the complete coil assembly and associated piping connections in cooling tower 2 (Building 1 roof over penthouse). Contractor shall provide all materials and means necessary to complete the service. In order to properly remove and replace said components, contractor shall isolate chiller 2 (Building 1 penthouse) by means of removing R-134a refrigerant, sealing refrigerant piping and circuits and maintaining a nitrogen charge to all refrigeration piping and circuits A and B to prevent moisture contamination of all refrigeration piping to include circuits A and B during the scope of the Project. Contractor must maintain operation of chiller 1 and cooling tower 1 during construction. Contractor shall also isolate and drain condensing water piping necessary to complete the replacement of the leaking component to include the refrigerant coil on cooling tower 2. Refrigerant from circuits A and B shall be drained into approved refrigerant cylinders with proper labeling meeting the requirements of the EPA. It is anticipated that Seismic bracing must be removed to complete the work but will be at discretion of the contractor. Upon replacement of known leaking components to include the complete coil assembly and piping connections, contractor will then conduct thorough analysis of entire system to ensure there are no additional leaking components. At the completion of the repair and replacement of the refrigeration coil, the contractor shall clean all refrigeration piping with an approved product and dry with nitrogen to include the proper purging prior to re-charging the refrigeration circuits A and B with r-134a. All steps of clean, drying purging and charging of refrigeration circuits A and B shall be verified by the VA.. The period of performance is estimated to be approximately 120 calendar days after Notice to Proceed (NTP). The principal NAICS code for this acquisition is 236220, Commercial and Institutional Building Construction, and the FSC is Z2DA, Repair or Alteration of Hospitals and Infirmaries, Business size of $45 Million. The Solicitation will be posted on or about August 10, 2023.

Files

File Type Posted
36C25523R0122.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cooling Tower, Roofing, and Structural Construction District of Columbia 20024, United States · NAICS 236220 Bureau of Engraving and Printing Total Small Business
J041--Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832. NAICS 238220 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business
EROS Removal and replacement of chilled and conden NAICS 238220 Office of Acquisitions and Grants Total Small Business
Z2NZ--Turn Key Chiller Equipment (Purchase and Install) NAICS 238220 Veterans Integrated Service Network 16 No set-aside
Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929) Department of Veterans Affairs Wilmington Vamc Wilmington DE 19805 · NAICS 236220 Veterans Integrated Service Network 4 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity