Waste Water System Replacement

Awarded Award Notice Posted

Solicitation number
AG-63PX-S-16-0011
Agency
Forest Service Research Service Northern Research Station Forest Research Service, Department of Agriculture
Awarded
to Ciervo And Sons Renovations, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-63PX-C-16-0012 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Grey Towers National Historic Site 151 Grey Towers Drive Milford, Pennsylvania 18337, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Jul 28, 2016 3:47 pm

07/28/2016 Amendment 003:
A) Attached is a new section B which adds three lines.


014 Alternate Route & Hook Up Location


015 Removal of rock from trench (cost per ton)


016 Drilling through rock (cost per foot)


B) Estimate measurements for the alternate route
1) "New Trenched Line" is 175 foot long.
2) "New HDD trenchless Line" is 120 foot long.


 

Added: Jul 28, 2016 3:47 pm

07/28/2016 Amendment 003:
A) Attached is a new section B which adds three lines.


014 Alternate Route & Hook Up Location


015 Removal of rock from trench (cost per ton)


016 Drilling through rock (cost per foot)


B) Estimate measurements for the alternate route
1) "New Trenched Line" is 175 foot long.
2) "New HDD trenchless Line" is 120 foot long.


 

Update #5 ·

Added: Jul 17, 2016 9:46 am Modified: Jul 27, 2016 2:18 pmTrack Changes 07/17/2017 Amendment 002 Answers to quiestion add additional information for the manhole and septic tank installation.All bidders shall provide a separate unit price for removal and disposal of bedrock in $/ton with their bid.

Update #4 ·

Added: Jul 25, 2016 3:07 pm 07/25/2016 Completion date for the project is November 30, 2016 and is negotiable.

Update #3 ·

Added: Jul 17, 2016 9:46 am 07/17/2017 Amendment 002 Answers to quiestion add additional information for the manhole and septic tank installation.

Update #2 ·

Added: Jul 13, 2016 11:14 am 07/13/2016 Attached Site Visit Sign-In Sheet


Admenment 001 07/13/2016

Attached is the drawing for the alternate route and hookup for the waste water line.

Update #1 ·

Added: Jun 14, 2016 5:48 pm The USDA Forest Service, Northern Research Station intends to award a negotiated, Firm-Fixed Service Contract for the replacement of the waste water system at the Grey Towers National Historic Site.

A. The contractor shall provide all equipment, labor, materials, supervision, and incidentals to accomplish the following project. Project Summary Description: The project includes, but is not limited to, the following major items of Work:

1. Replace existing sewer lines and install new sewer lines using trenchless methods to avoid disturbing historic structures and elements. Existing clay tile sewer lines will be replaced by pipe bursting, new sewer lines will be installed by horizontal directional drilling. Portions of new sewer lines may be installed by conventional trenching where practical. Install new precast concrete manholes and sewer line cleanouts.


2. Install new septic tanks. Replace existing dosing tank and pump with a new larger dosing tank and pump.


3. Enlarge the existing sand mound disposal area. Add new supply line, distribution laterals, and cleanout/flushing ports.


4. Construct a stabilized access way with stone retaining wall.


5. Restore all disturbed areas. Abandon portions of the old wastewater system in place


B. The acquisition will be solicited using the procurement processes prescribed in Part 15, contracting by negotiation by Federal Acquisition Regulations. The period of performance shall be three and half months from Notice to Proceed (NTP)


C. This requirement is a total small business set aside.

D.The NAICS Code for this acquisition is 237110, with a small business size standard of $36.5 Million.

E. Contractors are required to be registered in the System for Award Management (SAM) per FAR 52.204-7, System for Award Management (www.sam.gov)

F. One contract will be awarded as a Best Value Tradeoff to the offeror whose technical and cost proposal is the most advantageous to the Government. Award may not necessarily be made to the offeror submitting the lowest price, or to the offeror with the highest technical score. The critical factor in making any cost/technical tradeoffs is not the technical spread, but rather what is the significance of that difference. See Section M for additional details.


G. Period of Performance: To start on or about August 24, 2016.


H. Bonding requirements: 20% bid bond with offer; 100% performance & payment bonds upon contract award.


I. All prospective offerors are encouraged to inspect the site prior to submitting an offer to assess the condition of the site and the scope of work proposed. Failure to do so does not relieve the offeror from accurately determining the scope of work required. A Pre-Proposal Conference is scheduled for Wednesday, June 29, 2016 at 2:00 PM (Eastern Time) at the USDA Forest Service, Grey Tower National Historic Site, 151 Grey Towers Drive. Milford PA 18337. Local contract person is John Lodulce - Phone: 570-296-6061, Email: jlodolce@fs.fed.us.


J. A post award pre-work meeting will be scheduled with the successful offeror/contractor. This meeting must take place within ten days of contract award.


 

Attachments

Files attached to this notice, newest first
File Type Posted
NEW_SECTION_B.docx DOCX document
Addendum002-Final.docx DOCX document
160629-Addendum001-GT_Septic_System.pdf PDF
Grey_Towers_Waste_Water.SigninSheet.pdf PDF
RFQ_Waste_Water_System.docx DOCX document
GT_septic_systemALL.pdf PDF
GTSeptic_Specifications-_Final.docx DOCX document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity