NEW_SECTION_B.docx
DOCX document 14 KB Posted
- Attached to
- Waste Water System Replacement Federal contract opportunity
- Solicitation number
- AG-63PX-S-16-0011
About this file
New Section B with three additional line items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum002-Final.docx | DOCX document | |
| 160629-Addendum001-GT_Septic_System.pdf | ||
| Grey_Towers_Waste_Water.SigninSheet.pdf | ||
| RFQ_Waste_Water_System.docx | DOCX document | |
| GT_septic_systemALL.pdf | ||
| GTSeptic_Specifications-_Final.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B - SCHEDULE OF ITEMS
WASTEWATER SYSTEM REPLACEMENT
| ITEM NO. |
| DESCRIPTION |
| PAY UNIT |
| PAY |
QUANTITY
BID
| 01 |
| Mobilization |
| Lump Sum |
| 1 |
| 02 |
| Sewer Line “A” |
| Lump Sum |
| 1 |
| 03 |
| Sewer Line “B” |
| Lump Sum |
| 1 |
| 04 |
| Sewer Line “C” |
| Lump Sum |
| 1 |
| 05 |
| Sewer Line “D” |
| Lump Sum |
| 1 |
| 06 |
| Sewer Line “E” |
| Lump Sum |
| 1 |
| 07 |
| Manhole #1 |
| Lump Sum |
| 1 |
| 08 |
| Manhole #2 |
| Lump Sum |
| 1 |
| 09 |
| Septic Tanks |
| Lump Sum |
| 1 |
| 10 |
| Dosing Tank |
| Lump Sum |
| 1 |
| 11 |
| Dosing Pump and Controls |
| Lump Sum |
| 1 |
| 12 |
| Sand Mound Expansion |
| Lump Sum |
| 1 |
| 13 |
| Access Ramp & Retaining Wall |
| Lump Sum |
| 1 |
| 14 |
| Alternate Route & Hook Up Location |
| Lump Sum |
| 1 |
| 15 |
| Remove of rock (trench) |
| Per Ton |
| 1 |
| 16 |
| Drilling Through Bedrock |
| Linear Foot |
| 1 |
OPTIONAL ITEMS:
| A |
| Sewer Line “F”- Courtyard |
| Lump Sum |
| 1 |
Contractor:
Signature:
File details come from the government source that posted it. Updated .