GT_septic_systemALL.pdf
PDF 4 MB Posted
- Attached to
- Waste Water System Replacement Federal contract opportunity
- Solicitation number
- AG-63PX-S-16-0011
About this file
Drawings of the septic system
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NEW_SECTION_B.docx | DOCX document | |
| Addendum002-Final.docx | DOCX document | |
| 160629-Addendum001-GT_Septic_System.pdf | ||
| Grey_Towers_Waste_Water.SigninSheet.pdf | ||
| RFQ_Waste_Water_System.docx | DOCX document | |
| GTSeptic_Specifications-_Final.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EASTERN REGION
VICINITY MAP:
US Department of Agriculture Forest Service
GREY TOWERS NATIONAL HISTORIC SITE
Milford Township, Pike County, Pennsylvania
INDEX OF SHEETS
SHEET SHEET TITLE
Grey Towers National Historic Site is located on Old Owego Road, off of US Rt 6, near Milford, Pike County, Pennsylvania.
PROJECT
LOCATION
C-0 TITLE SHEET
C-1 SITE PLAN
WASTEWATER SYSTEM REPLACEMENT
PROJECT
LOCATION
MANSION AREA SITE PLANC-2
APPROVED:
SCOPE OF WORK:
Construct a new soil absorption wastewater treatment and disposal system to serve the Grey Towers Mansion and other facilities. Work includes: Enlarge the existing sand mound disposal area, construct new sewer lines by trenchless construction, install new septic tanks and dosing pump station.
SAND MOUND AREA SITE PLANC-3
C-0
SEWER LINE PROFILESC-4
SEPTIC SYSTEM DETAILSCD-1
SAND MOUND DETAILSCD-2
Pennsylvania One Call System, Inc.
Call 3 Business Days Before You Dig!
1-800-242-1776 or 8-1-1
COLUMBIA GAS TRANS PORT JERVIS
MILFORD BORO MUNI AUTH/MILFORD BORO
MOON VALLEY FALLS HOMEOWNER ASSOCIATION
PEG BANDWIDTH PA LLC
PENCOR SERVICES/BLUE RIDGE COMMUNICATION
PIKE COUNTY LIGHT & POWER COMPANY
PPL ELECTRIC UTILITIES CORPORATION
TENNESSEE GAS PIPELINE
TERRADEX INC
UGI PENN NATURAL GAS
VERIZON NORTH
ONE CALL FACILITY OWNERS LIST
FOR PIKE COUNTY, MILFORD TOWNSHIP
SEE MANSION AREA DETAIL - SHEET C-2
INSTALL MANHOLE #2
SEE SAND MOUND AREA DETAIL
SHEET C-3
ABANDON SEPTIC TANK
ABANDON CLEANOUT
ABANDON SEWER LINE
ABANDON SEPTIC TANKS
ABANDON SEWER LINE
INSTALL SEWER LINE "E" 4" X 315'
FROM MANHOLE #2 TO SEPTIC TANK
BY TRENCHLESS CONSTRUCTION
OR CONVENTIONAL TRENCHING
USE TRENCHLESS CONSTRUCTION WITHIN 20 FEET
OF WALKWAY. AVOID ANY DISTURBANCE
OF WALKWAY. PROVIDE A TEMPORARY RAMP
FOR HEAVY EQUIPMENT TO CROSS WALKWAY.
INSTALL CLEANOUTS
AT APPROX. 100' SPACING
SEE DETAIL
INSTALL CLEANOUT
AT CHANGE IN GRADE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
SEPTIC SYSTEM SITE PLAN
GREY TOWERS
NATIONAL HISTORIC SITE
GREG PORTER PE
R9 TST ENGINEERING
Grey Towers National Historic Site
SPF
C-1
1" = 60'
G. PORTER
4/2016
CONTOUR LINES ARE APPROXIMATE
AND MAY NOT REPRESENT THE
EXISTING GROUND ACCURATELY.
THERE ARE MANY BURIED UTILITIES
WITHIN THE PROJECT AREA. THIS
DRAWING INDICATES OWNER'S
KNOWLEDGE OF BURIED UTILITIES.
MANY UTILITIES ARE OWNED BY GREY
TOWERS AND ARE NOT UNDER THE PA
ONE CALL SYSTEM. CONTRACTOR
SHALL USE ALL APPROPRIATE
METHODS TO LOCATE AND AVOID ALL
BURIED UTILITIES.
FINAL MANHOLE LOCATIONS WILL BE
STAKED BY THE COR.
ALL GROUND DISTURBING ACTIVITIES
SHALL BE CAREFULLY CONTROLLED
AND KEPT TO A MINIMUM.
CONTRACTOR SHALL ACCESS THE
SITE USING THE HARDENED ACCESS
WAY, AND LIMIT EQUIPMENT AND
OPERATIONS TO THE AREA ALONG
THE PIPELINES AND AREAS BEING
CONSTRUCTED. DRILLING SLURRIES
SHALL BE CONTAINED WITHIN LINED
PITS OR TANKS, DRILL CUTTINGS
SHALL BE STOCKPILED ON TARPS AND
PROMPTLY REMOVED FROM THE SITE.
COORDINATE WITH THE COR TO KEEP
DISRUPTION OR NECESSARY
CLOSURE OF THE WASTEWATER
PRODUCING AND TREATMENT
FACILITIES TO A MINIMUM.
INSTALL NEW SEWER LINE "B", 4" X 145 FT.
IN EXISTING SEWER LINE
BY PIPEBURSTING
INSTALL NEW SEWER LINE "C", 4" X 56 FT.
IN EXISTING SEWER LINE
BY PIPEBURSTING
REMOVE EXISTING MANHOLE
INSTALL NEW MANHOLE #1
ABANDON EXISTING SEWER
INSTALL NEW SEWER LINE "A", 4" X 265 FT.
FROM MANSION BASEMENT TO MANHOLE #2
BY TRENCHLESS CONSTRUCTION.
PIPE SHALL BE OF SIGNIFICANT DEPTH
TO AVIOD DISTURBANCE OF SURFACE FEATURES
CONNECT NEW 4" SEWER LINE
TO EXISTING BUILDING SEWER
IN BASEMENT. INSTALL CLEANOUT.
CONTRACTOR TO COORDINATE
EXACT LOCATION FOR NEW
SEWER LINE TO EMERGE.
SEE DETAIL SHEET CD-1
INSTALL NEW SEWER LINE "D", 4" X 195 FT.
FROM MANHOLE #1 TO MANHOLE #2
BY TRENCHLESS CONSTRUCTION
AND/OR CONVENTIONAL TRENCHING
ABANDON EXISTING SEWER
CONNECT NEW 4" SEWER LINE
TO EXISTING BUILDING SEWERS
FROM MANSION AND ICE HOUSE.
INSTALL CLEANOUTS TO PROVIDE
ACCESS TO ALL DIRECTIONS
CONNECT TO EXISTING LINE
APPROX 3' OUT FROM EXTERIOR WALL
EXISTING SEWER LINE WAS DUG
IN 2015 TO REMOVE BLOCKAGE
CAST IRON PIPE WAS SITTING
ON BEDROCK IN THIS LOCATION
ADDITIVE ITEM #1
SEWER LINE "F", 4" X 27 FT.
REPLACE SEWER LINE TO
WITHIN 3' OF ICE HOUSE
EXTERIOR WALL
INSTALL CLEANOUT
AT CHANGE IN GRADE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
SEPTIC SYSTEM SITE PLAN
MANSION AREA
GREY TOWERS
NATIONAL HISTORIC SITE
GREG PORTER PE
R9 TST ENGINEERING
Grey Towers National Historic Site
SPF
C-2
NTS
G. PORTER
4/2016
CONTOUR LINES ARE APPROXIMATE
AND MAY NOT REPRESENT THE
EXISTING GROUND ACCURATELY.
THERE ARE MANY BURIED UTILITIES
WITHIN THE PROJECT AREA. THIS
DRAWING INDICATES OWNER'S
KNOWLEDGE OF BURIED UTILITIES.
MANY UTILITIES ARE OWNED BY GREY
TOWERS AND ARE NOT UNDER THE PA
ONE CALL SYSTEM. CONTRACTOR
SHALL USE ALL APPROPRIATE
METHODS TO LOCATE AND AVOID ALL
BURIED UTILITIES.
FINAL MANHOLE LOCATIONS WILL BE
STAKED BY THE COR.
ALL GROUND DISTURBING ACTIVITIES
SHALL BE CAREFULLY CONTROLLED
AND KEPT TO A MINIMUM.
CONTRACTOR SHALL ACCESS THE
SITE USING THE HARDENED ACCESS
WAY, AND LIMIT EQUIPMENT AND
OPERATIONS TO THE AREA ALONG
THE PIPELINES AND AREAS BEING
CONSTRUCTED. DRILLING SLURRIES
SHALL BE CONTAINED WITHIN LINED
PITS OR TANKS, DRILL CUTTINGS
SHALL BE STOCKPILED ON TARPS AND
PROMPTLY REMOVED FROM THE SITE.
COORDINATE WITH THE COR TO KEEP
DISRUPTION OR NECESSARY
CLOSURE OF THE WASTEWATER
E X
IS
T
IN
G
S E
P T
IC
S
A N
D M
O U
N D3
' X
' A
B S
O R
P T
IO
N
A R
E A
C O
N S
T R
U C
T E
X P
A N
D E
D S
A N
D M
O U
N D
' X
' A
B S
O R
P T
IO
N
A R
E A
REPLACE EXISTING DOSING TANK
WITH LARGER PUMP AND TANK
SEE DETAIL ON SHEET CD-1
INSTALL 2 -2000 GAL
SEPTIC TANKS
SEE DETAIL ON SHEET CD-1
C
O
N
S
T
R
U
C
T
N
W
H
A
R
D
E
N
D
W
I
A
C
E
S
W
Y
S
T
A
I L
O
H
E
CONSTRUCT ASHLAR COURSED BLUESTONE
RETAINING WALL AS NEEDED
TO PROVIDE A LEVEL ACCESS WAY
10'
5'
APPROX EDGE OF NEW FILL
S E
E D
E T
A
IL
S O
N S
H E
E T
C D
-2
DEMOLISH AND REMOVE EXISTING DOSING TANK
CONNECT SEWERLINE FROM PAVILION
TO NEW DOSING TANK
EXTEND & CONNECT ELECTRIC CIRCUITS
FROM EXISTING PUMP
TO NEW PUMP CONTROLS
N
W
R
REMOVE 1 TREE THAT IS CLOSE TO
SAND MOUND EXPANSION AREA
GRUB STUMP AND RESTORE GROUND
CONCRETE CURB TO REMAIN
CONSTRUCT TEMPORARY RAMP OVER CURB
FOR CONSTRUCTION ACCES
REMOVE AND REINSTALL SIGN
PROVIDE TEMPORARY FENCE - BARRICADE
DURING CONSTRUCTION
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
SEPTIC SYSTEM SITE PLAN
SAND MOUND AREA
GREY TOWERS
NATIONAL HISTORIC SITE
GREG PORTER PE
R9 TST ENGINEERING
Grey Towers National Historic Site
SPF
C-3
NTS
G. PORTER
4/2016
CONTOUR LINES ARE APPROXIMATE
AND MAY NOT REPRESENT THE
EXISTING GROUND ACCURATELY.
THERE ARE MANY BURIED UTILITIES
WITHIN THE PROJECT AREA. THIS
DRAWING INDICATES OWNER'S
KNOWLEDGE OF BURIED UTILITIES.
MANY UTILITIES ARE OWNED BY GREY
TOWERS AND ARE NOT UNDER THE PA
ONE CALL SYSTEM. CONTRACTOR
SHALL USE ALL APPROPRIATE
METHODS TO LOCATE AND AVOID ALL
BURIED UTILITIES.
FINAL MANHOLE LOCATIONS WILL BE
STAKED BY THE COR.
ALL GROUND DISTURBING ACTIVITIES
SHALL BE CAREFULLY CONTROLLED
AND KEPT TO A MINIMUM.
CONTRACTOR SHALL ACCESS THE
SITE USING THE HARDENED ACCESS
WAY, AND LIMIT EQUIPMENT AND
OPERATIONS TO THE AREA ALONG
THE PIPELINES AND AREAS BEING
CONSTRUCTED. DRILLING SLURRIES
SHALL BE CONTAINED WITHIN LINED
PITS OR TANKS, DRILL CUTTINGS
SHALL BE STOCKPILED ON TARPS AND
PROMPTLY REMOVED FROM THE SITE.
COORDINATE WITH THE COR TO KEEP
DISRUPTION OR NECESSARY
CLOSURE OF THE WASTEWATER
MANHOLE #2
MANHOLE #1
MANHOLE #1
MANHOLE #2
MANHOLE #2
SEPTIC TANK
BUILDING
SEWER
CONNECTION
AT KITCHEN &
ICEHOUSE
BUILDING SEWER
CONNECTION
AT MANSION BASEMENT
A P
P R
O X
.2
S
L O
P E
IN
S
T A
L L N
E W
" S
E W
E R
L
IN
E B
Y T
R E
N C
H L E
S S
M E
T H
O D
S
I N
S
T
A
S
E
W
B
Y
P
P
E
B
U
R
S
T
I N
G
P
R
O
X
E
X
I S
T
I
Y
L
V
R
T
I C
I G
N
M
E
F
X
I S
T
I
U
K
O
W
N
IN
S
T A
L L N
E W
S
E W
E R
L
IN
E B
Y P
IP
E
B U
R S
T
IN
G
A
P P
R O
X
E
X
IS
T
IN
G P
IP
E
I S
C L A
Y T
IL
E
V
E R
T
IC
A L A
L
IG
N M
E N
T O
F E
X
IS
T
IN
G P
IP
E
I S
U N
K O
W
N
I N
S
T
A
S
E
W
O
P
E
INSTALL NEW 4" SEWER LINE 76' @ 2.0% SLOPE
INSTALL CLEANOUT AT CHANGE IN GRADE
IN
S
T A
L L N
E W
" S
E W
E R
L
IN
E
.0
S L O
P E
IN
S
T A
L L N
E W
S
E W
E R
L
IN
E
.7
S L O
P E
I N
S
T
A
L L
N
S
E
W
O
P
E
INSTALL CLEANOUT AT CHANGE IN GRADE
INSTALL CLEANOUT AT CHANGE IN GRADE
BUILDING SEWER
CONNECTION AT
LETTER BOX
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
SEWER PROFILES
GREY TOWERS
NATIONAL HISTORIC SITE
GREG PORTER PE
R9 TST ENGINEERING
Grey Towers National Historic Site
SPF
C-4
NTS
G. PORTER
4/2016
PROFILE GRID LINES ARE DRAWN AT
1' VERTICAL,10' HORIZONTAL SPACING.
MAINTAIN MINIMUM 2% SLOPE ON ALL
SEWER LINES.
INLET
DOSING PUMP:
DESIGN DISCHARGE = 115 GPM AT 19' TDH
HYDROMATIC S3W, 1.5 HP, 1750 RPM, 6" IMPELLER
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
SEPTIC DETAILS
GREY TOWERS
NATIONAL HISTORIC SITE
GREG PORTER PE
R9 TST ENGINEERING
Grey Towers National Historic Site
SPF
CD-1
NTS
G. PORTER
4/2016 x
SCARIFY EXISTING GROUND
MINIMUM 12" SAND
8" DISTRIBUTION GRAVEL
REMOVE CLEANOUT PORT, EXTEND DISTRIBUTION LATERALS
PROVIDE NEW CLEANOUT AT END OF EXTENDED LATERAL
NEW CLEANOUT PORT, SEE DETAIL
12" TOPSOIL COVER
CUT AND CAP OLD DELIVERY PIPE AT END OF DISTRIBUTION HEADER
PROVIDE NEW 3" DELIVERY PIPE AND CONNECT TO EXISTING
2" HEADER AT HEADER MIDPOINT
BOTTOM EDGE OF DISTRIBUTION GRAVEL
EXPANDED MOUND
A
A
BOTTOM EDGE OF DISTRIBUTION GRAVEL
EXISTING MOUND
EXTEND 1-1/4" DISTRIBUTION LATERALS
WITH 1/4" HOLES ON BOTTOM @6' SPACING
PROVIDE CLEANOUT PORTS AT ENDS OF LATERALS
SEE DETAIL ON SHEET CD-1
EXTEND 2" HEADER.
CONNECT TO END
OF EXISTING HEADER
INSTALL NEW/EXTEDED 1-1/4" DISTRIBUTION LATERALS
WITH 1/4" HOLES @6' SPACING
SYSTEM DESIGN PARAMETERS:
DESIGN FLOW = 2340 GALLONS PER DAY
ABSORPTION AREA = 1.5 SQ FT PER GPD
AREA REQUIRED = 3510 SQ FT
AREA PROVIDED = 78' X 47' = 3666 SQ FT
13 LATERALS WITH 8 - 1/4" HOLES EACH
EXISTING MOUND
SCARIFY EXISTING GROUND
SAND AS NEEDED FOR WIDENING
EXTEND 2" DISTRIBUTION HEADER
AND 1-1/2" DISTRIBUTION LATERALS
REMOVE TOPSOIL TO EXPOSE CLEAN SAND
EXISTING MOUND
12" TOPSOIL COVER
8" DISTRIBUTION GRAVEL
O
P
E
B B
O
P
E
H
A
L
L
O
W
E
R
LATERAL FLUSHING/CLEANOUT PORTS
SEE DETAIL ON SHEET CD-1
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
No.
Revision/Issue Date
NOTES
SAND MOUND
DISPOSAL FIELD
GREY TOWERS
NATIONAL HISTORIC SITE
GREG PORTER PE
R9 TST ENGINEERING
Grey Towers National Historic Site
SPF
CD-2
NTS
G. PORTER
4/2016
File details come from the government source that posted it. Updated .