WA PFH 29-1(1), middle fork snoqualmie river road

Award Notice Posted

Solicitation number
DTFH70-13-B-00015
Agency
Awarded
to Active Construction, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH7014C00009 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Project Is Located approximately approximately 5 Miles E of North Bend, WA ., United States

Notice details come from SAM.gov. Updated .

Notice text

PROJECT: WA PFH 29-1(1), MIDDLE FORK SNOQUALMIE RIVER ROAD, MT. BAKER-SNOQUALMIE NATIONAL FOREST, KING COUNTY, WASHINGTON.

LOCATION: This project is located approximately 5 Miles E of North Bend, WA
WORK: This project consists of Grading, drainage, base, asphalt concrete pavement, retaining walls, and bridges.


The project includes construction of a single span, 90-foot long 5 girder bridge with cast-in-place concrete abutments, wing walls and deck. Abutments are founded on Concrete filled steel pipe piles. The work includes demolition and removal of the existing bridge. This work also includes the Rehabilitation of a concrete deck on a 3 span 290ft long by 26ft wide bridge structure.. See "Description of Work" for additional details


LENGTH: 9.732 Miles
TENTATIVE COMPLETION DATE: Fall 2016
ESTIMATED PRICE RANGE: Between $15 million and $20 million


To view the INTERESTE VENDERS LIST you must register as an FBO user. Go to https://www.fbo.gov/. Scroll down to the "Venders/Citizens" box. Click on "Register Now" and follow the directions.


THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS


This project is being advertised with an Economic Price Adjustment specification.


PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. Registering at ADD TO WATCHLIST box insures notification when solicitation documents are posted. When solicitation documents are issued, the INVITATION FOR BIDS/REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.


This paragraph announces possible financing available to small businesses. The three types of businesses that are eligible to receive a loan through this program are: (1) Firms that have received DBE certification from a state or local transportation agency; (2) Eligible small business firms; and (3) Firms that have received a disability rating by the Veteran's Administration and have certified themselves as a SDVOSB. Start-up businesses are not eligible to receive a STLP line of credit and should contact the SBA for information about other possible forms of financial assistance. (NOTE - This paragraph does not reserve this solicitation for these types of business): The Department of Transportation's (DOT) Short-Term Lending Program (STLP) offers working capital financing in the form of lines of credit to finance accounts receivable for transportation related contracts. The Maximum line of credit is $750,000. The STLP loan has a variable rate, which is connected to the prime rate. For more information see: http://osdbuweb.dot.gov/financial/index.cfm.

Files

File Type Posted
Amendment_A005_Snoqualmie.pdf PDF
Amendment_A004_Snoqualmie.pdf PDF
Amendment_A003__Snoqualmie.pdf PDF
A003_Physical_Data_Lab_Trailer_Request_Form.pdf PDF
A002_Snoqualmie.pdf PDF
A001_Snoqualmie.pdf PDF
Solicitation_Snoqualmie.pdf PDF
Physical_Data_Lab_Trailer_Request_Form_for_Internet.pdf PDF
Plan_Request_for_Internet.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/middlefork/ —
WA_PFH_29-1(1)_Prelim_XS_Sheets_101-133.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_34-66.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_1-33.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_167-200.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_134-166.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_334-362_and_approaches.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_67-100.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_234-266.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_267-300.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_201-233.pdf PDF
WA_PFH_29-1(1)_Prelim_XS_Sheets_301-333.pdf PDF
PreliminaryPlans_2_of_3_WA_PFH_29-(1).pdf PDF
PROJECT_DESCRIPTION_MiddleFork_Snoqualmie.pdf PDF
PreliminaryPlans_3_of_3_WA_PFH_29-1(1).pdf PDF
Prelim_Letter_WA_PFH_29-1(1).pdf PDF
PreliminaryPlans_1_of_3_WA_PFH_29-(1).pdf PDF
Show all 26

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity