Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7520

Fax 360-619-7932 August 2013

NOTICE TO PROSPECTIVE BIDDERS

RE: WA PFH 29-1(1)

Middle Fork Snoqualmie River Road Solicitation No: DTFH70-13-B-00015

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After December 6, 2013 access will be weather dependent.

For current road conditions, contact Santino Pascual at spascua02@fs.fed.us or 425.888.8784 (phone) at the US Forest Service Snoqualmie Ranger District, North Bend Office.

No Federal Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - All project work is located just east of the city of North Bend, Washington in King County along the Lake Dorothy/Middle Fork Snoqualmie River Road.

• Middle Fork Snoqualmie River Road o Segment 1 [SE Middle Fork Road Milepost 0.00 to 2.2 (also called SE Lake Dorothy Road MP 1.3)] Work on this Segment is potential mitigation for haul road damage to the start of the project reconstruction. Work includes grading, base, and paving.

o Segment 2 (SE Middle Fork Road MP 2.2 to MP 12.4) Tunnel 1 (Located near M.P. 6.9) - Work includes patching and sealing of concrete lining.

Tunnel 2 (Located near M.P. 8.6) – Work includes rock scaling and concrete sealing.

• State Route 123 – Panther Creek Bridge, located near M.P. 5.2 approximately 2.2 miles north of Stevens Canyon Road junction. Work includes cleaning and sealing concrete surfaces, and expansion joint replacement.

Technical Questions – All technical questions must be sent by email to plans_spec@dot.gov (plans_spec@dot.gov).

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

mailto:spascua02@fs.fed.us mailto:plans_spec@dot.gov mailto:wfl.contracts@dot.gov

Preliminary Plans WA PFH 29-1(1) Middle Fork Snoqualmie River Road

Solicitation documents - Documents will be available during the Fall of 2013 or the winter of 2013/2014. Please monitor the FedBizOpps (FBO) site or our Western Federal Lands webpage http://www.wfl.fhwa.dot.gov/contracting/construction/ for the actual date of solicitation release. To receive automatic notification through FBO, select the “Watch this opportunity” feature and follow the steps as indicated.

Thank you for your interest in this project.