Amendment_A005_Snoqualmie.pdf
PDF 1 MB Posted
- Solicitation number
- DTFH70-13-B-00015
About this file
Amendment A005
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A005 2/18/2014 N/A WA PFH 29-1(1)
MIDDLE FORK SNOQUALMIE
RIVER ROAD
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-13-B-00015
9B. DATED (SEE ITEM 11)
1/17/2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA PFH 29-(1), MIDDLE FORK SNOQUALMIE RIVER ROAD
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A004, dated 2-18-2014 WA PFH 29-1(1) Solicitation No. DTFH70-03-B-00015 Middle Fork Snoqualmie River Road
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE CLARIFICATION
Amendment A004 did not remove the following bid items:
• 5104-1000 Dynamic Pile Load Test (471+85 Bridge)
• 55104-1000 Dynamic Pile Load Test (588+50 Bridge)
Amendment A004 did revise the pay items so that they are no longer Contract Quantity pay items and they were removed from the Contract Quantity Pay Item list on page A-8.
SPECIAL CONTRACT REQUIREMENTS
Page E-9, 105.02(b)
• Adds contact info for a Weed Free inspection.
105.04 Storage and Handling Material.
• Adds at the end of the large paragraph, “, unless otherwise approved by the CO.”
Page F-71, 551.06 Test Piles – (b) Set up Period.
• Removes the last sentence of the second paragraph.
PLANS
Sheets G.7 Clarifies the embedment depth of the rebar into the pile.
Sheets G.19 Clarifies the embedment depth of the rebar into the pile.
ENCLOSURES
Pages: E-9 & F-71 Plans: G.7 & G.19
E-9
Special Contract Requirements Project: WA PFH 29-1(1), Middle Fork Snoqualmie River Road during use. This requirement may be waived if the source meets weed-free inspection requirements conducted by the Forest Service. Provide a written request to the CO and allow up to 30 days for the inspection to be conducted.
To arrange for a weed free inspection, contact Sarah Callagan, Forest Invasive Plant Specialist, at 425.785.6042 (phone), 425.783.0212 (fax) or to sacallaghan@fs.fed.us.
105.04 Storing and Handling Material. Delete the text of the second paragraph and substitute the following:
Use existing turnouts, parking areas, and portions of the right-of-way approved by the CO for staging or storing of materials such as culverts, geotextile fabric, temporary traffic control devices, and for equipment parking. The horse trailer parking area at the Middle Fork Trailhead is also available for staging and storing of materials. Coordinate with the CO at least two weeks prior to using the horse trailer parking area. Existing parking areas and turnouts, other than the Middle Fork Trailhead horse trailer parking area, must be available for public use during open road periods, unless otherwise approved by the CO.
Provide additional space as needed. Do not use private property for staging or storage without written permission of the owner or lessee. Furnish copies of all agreements. Comply with Subsection 105.02 with respect to any contractor-located staging or storage areas. Restore all Government-provided storage sites to their original condition.
Revised by Amendment A005
F-71
Special Contract Requirements Project: WA PFH 29-1(1), Middle Fork Snoqualmie River Road the Contractor's method of operation. Furnish test piles at least 30 feet longer than the estimated length of production piles shown in the plans. Furnish production pile at least 10 feet longer than the lengths determined by the test piles.
551.06 Test Piles. Test pile locations are shown on the plans. Install test piles no later than May 1, 2014 at the 588+50 bridge. Do not order production piling until the test pile program is complete.
Use the results of the test pile to establish order lengths and driving criteria for the remaining production piles in the same abutment.
Excavate the ground at the site of each test pile to the elevation of the bottom of the footing before the pile is driven. Drive test piles with the same equipment as the production piles.
(a) Initial drive. Drive test piles to the estimated tip elevation shown in the plans. Determine the driven pile capacity of test piles by dynamic load test with signal matching during initial drive. Provide a preliminary dynamic load test report to the CO within 24 hours after the pile is driven to the estimated tip elevation. Within 24 hours after receipt of the initial report the CO will either require driving the test pile deeper with additional dynamic load test or indicate that the set up period for the restrike test has begun.
(b) Set up period. Do not drive any piling at the same abutment during the set up period.
Allow test piles to set up for at least 21 days before restrike.
Do not proceed with the restrike test with the second test pile on the other abutment at the same bridge until the CO has approved the preliminary restrike results. The set up period of the test pile at the other abutment may be extended up to an additional 21 days if the first restrike indicates the pile has not obtained the required nominal bearing resistance.
(c) Restrike. Warm the hammer before restrike begins by applying at least 20 blows to another pile that is at least 20 feet from the test pile. Perform a dynamic load test with signal matching from the first foot of penetration during the restrike. Provide a preliminary dynamic load test report to the CO within 24 hours after the restrike.
If the required nominal bearing resistance is not attained on restrike, drive a portion or all of the remaining test pile length as directed by the CO, and repeat the set up and restrike procedure as directed. Splice and continue driving until the required nominal bearing resistance is obtained.
Test piles to be used in the completed structure shall conform to the requirements for production piles. Remove test piles not incorporated in the completed structure to at least 2 feet below finished grade.
551.07 Driven Pile Capacity. Determine the compressive nominal bearing resistance of the test piles during driving by performing dynamic load tests with signal matching. Use the results of the test pile to establish the driving criteria for the remaining production piles in the same abutment.
Use the results of the dynamic load tests to establish the set up factor for the remaining production piles in each abutment, where the set up factor is equal to the nominal resistance at restrike divided by the nominal resistance during the initial drive determined by the dynamic load test. Use the set up factor to establish the required compressive nominal bearing resistance of production piling during initial drive that will achieve the required compressive nominal bearing resistance after set
Revised by Amendment A005