B-47
NTL DH-15
5 P
C
.7
P T
.9
P C
.7
P T
.5
P C
.0
P T
.0
D
R= 2,000.00'
T= 49.09'
L= 98.17' e= 0.028
D
R= 1,000.00'
T= 162.78'
L= 322.73' e= 0.042
D
R= 275.00'
T= 91.15'
L= 176.04' e= 0.060
N
CUYD
EXC.
CUYD
EMB.
420+00 415+00 410+00 405+00
890 890
895 895
900 900
905 905
910 910
915 915
920 920
925 925
D.24
STATE PROJECT
NUMBER
SHEET
WA
PFH 29-1(1)
M a y
A
M w f0 fq .d g n
U
S S u r
D
N
B E
L
C h e c k e d b y
B
T H
O M
P S
O e s ig n e d b y
CP
98080
CP
98081
CP
98082
CP
98083
P ip e C u lv e r t
Existing ground
Profile grade
See sheet K.2
Special rock embankment, type 2, LT & RT
See sheet K.2
Special rock embankment, type 2, RT
2 52 40 116 171
5,755
Line to be constructed
H W
.5 f t
Q c fs x
S
P P
A
E x te n d e x in le t
P ip e C u lv e r t
See sheet K.7
Rolled erosion control product, type 3.B, LT
See sheet K.7
Rolled erosion control product, type 3.B, LT & RT
.0
350' VC
K = 29
.2
7.
250' VC
K = 29
SSD = 251'
.5
-1.5000%
-4.7000%
200' VC
K = 63
SSD = 437'
.7
250' VC
K = 27
.5
+4.
-1.4211%
200' VC
K = 33
SSD = 276'
PRELIM
IN
ARY
Not For
Con str uc tio n
T L
D H
L
C U T
S
P C
.3
P T
.2
P C
.3
P T
.3
P C
.7
D
R= 450.00'
T= 95.84'
L= 188.86' e= 0.058
D
R= 400.00'
T= 96.86'
L= 190.06' e= 0.060
D
R= 4,500.00'
T= 80.68'
L= 161.34' e= NC
N
CUYD
EXC.
CUYD
EMB.
435+00 430+00 425+00 420+00
905 905
910 910
915 915
920 920
925 925
930 930
935 935
940 940
D.25
STATE PROJECT
M a y
A
M w f0 fr .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98084
CP
98085
CP
98086
CP
98087
C u lv e r t
P ip
C u lv e r t
P
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
Existing ground
Profile grade
Line to be constructed
141 (Includes 79 for approach road 432+89 LT)
3,845 (Includes 23 for approach road 432+89 LT)
A
See sheet E.3
Bessemer Rd
Approach 20+00
Mainline 432+89.38 =
.7
-1.4211%
+1.666 7%
200' VC
K = 65
.0
100' VC
K = 65
.0
+3.2
100' VC
K = 81
SSD = 928'
.2
+1.97 14%
200' VC
K = 58
SSD = 410'
PRELIM
IN
ARY
Not For
Con str uc
B-48
B-73
B-74
NTL CUT S-5
NTL CUT S-7
NTL DH-17
R= 275.00'
T= 131.17'
L= 244.79'
5 P
T
.0
P C
.1
P R
C
.5
P R
C
.7
9 4
P T
.5
P C
.3
P R
C
.7
P T
.3
P C
.6
D
R= 4,500.00'
T= 80.68'
L= 161.34' e= NC
D
R= 200.00'
T= 55.05'
L= 107.44' e= 0.040
D
R= 150.00'
T= 86.04'
L= 156.23' e= 0.040 e= 0.040
D
R= 200.00'
T= 62.07'
L= 120.37' e= 0.040
D
R= 300.00'
T= 55.44'
L= 109.65' e= 0.040 L= 219.89'
D
R= 4,500.00'
T= 109.97' e= NC
N
CUYD
EXC.
CUYD
EMB.
450+00 445+00 440+00 435+00
915 915
920 920
925 925
930 930
935 935
940 940
945 945
950 950
D.26
STATE PROJECT
M a y
P
M w f0 fs .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98088
CP
98089
CP
98090
Line to be constructed
See sheet K.4
Deep patch, RT
See sheet K.4
Deep patch, LT
See sheet K.4
Deep patch, LT
See sheet C.7
Subgrade stabilization, type 2
P ip e C u lv e r t
P ip e C u lv e r t
Profile grade
Existing ground
2 92
See sheet E.6
Parking Area 10
See sheet C.7
Subgrade stabilization, type 1
1,408
2,143
-1.5067%
.6
200' VC
K = 56
.7
150' VC
K = 32
SSD = 305'
.5
200' VC
K = 64
.7
+0.5000%
-1.2000%
100' VC
K = 59
SSD = 685'
+2.07 50% -2.6250%
PRELIM
IN
ARY
Not For
Con str uc
-49
-50
P R
C
.5
P T
.4
P C
.3
P T
.3
T= 109.97'
D
R= 4,500.00'
L= 219.89' e= NC
L= 271.93'
D
T= 136.01'
R= 4,500.00' e= NC
D
R= 800.00'
T= 209.09'
L= 409.03' e= 0.046
N
CUYD
EXC.
CUYD
EMB.
465+00 460+00 455+00 450+00
895 895
900 900
905 905
910 910
915 915
920 920
925 925
930 930
D.27
STATE PROJECT
M a y
P
M w f0 ft .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98091
CP
98092
See sheet C.7
Subgrade stabilization, type 2
P ip e C u lv e r t
C u lv e r t
P
Profile grade
Existing ground
2,998
Line to be constructed
1,818
Remove gate
.2
-1.2000%
-1.4848%
100' VC
K = 351
SSD = 3838'
.0
-1.6071%
100' VC
K = 818
SSD = 8873'
PRELIM
IN
ARY
Not For
Con str uc
N
H
N
CUYD
EXC.
CUYD
EMB.
480+00 475+00 470+00 465+00
880 880
885 885
890 890
895 895
900 900
905 905
910 910
915 915
D.28
STATE PROJECT
M a y
A
M w f0 fu .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98093
CP
98094
.7
.0
GR LT
GR RT
GR LT
GR RT
T ST ST T
T ST ST T
Profile grade
Existing ground
M id dl e
Fo rk S no qu al m ie R iv er
4,124 2,428
Line to be constructed sheets G.3-G.14.
construct new bridge. See
Remove existing bridge and
471+85 Bridge.
See sheets G.3-G.14.
construct new bridge.
Remove existing bridge and
471+85 Bridge.
-1.6071%
.2
-0.5143%
150' VC
K = 137
.7
+0.5000%
60' VC
K = 59
.2
-0.5630%
100' VC
K = 94
SSD = 1065'
PRELIM
IN
ARY
Not For
Con str uc
L
D H -19
L
C U T
S -8
P C
.7
P T
.9
P C
.3
P T
.8
P C
.4
P T
.3
D
R= 350.00'
T= 89.51'
L= 175.25' e= 0.060
D
R= 2,000.00'
T= 62.27'
L= 124.49' e= 0.028
D
R= 5,000.00'
T= 116.97'
L= 233.90' e= NC
N
CUYD
EXC.
CUYD
EMB.
495+00 490+00 485+00 480+00
885 885
890 890
895 895
900 900
905 905
910 910
915 915
920 920
D.29
STATE PROJECT
M a y
P
M w f0 fv .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98095
CP
98096 reviR eimlauqonS kroF eld diM
Profile grade
Existing ground
H W
.6 f t
Q c fs
P ip e C u lv e r t
H W
.1 f t
Q c fs
P ip e C u lv e r t
115 159
P ip e C u lv e r t
See sheet E.6
Parking Area 11
National Forest System Lands
National Forest System Lands
14 25
2,376
Line to be constructed
+1.555 6%
.5
-2.3571%
400' VC
K = 102
SSD = 476'
.2
-0.5000%
150' VC
K = 81
.0
100' VC
K = 100
.0
200' VC
K = 94
PRELIM
IN
ARY
Not For
Con str uc
DCP-25
P C
.8
P T
.4
P C
.0
D
R= 5,000.00'
T= 57.82'
L= 115.63' e= NC
L= 316.63'
D
R= 1,600.00'
T= 158.84' e= 0.032
N
CUYD
EXC.
CUYD
EMB.
510+00 505+00 500+00 495+00
885 885
890 890
895 895
900 900
905 905
910 910
915 915
920 920
D.30
STATE PROJECT
M a y
P
M w f0 fw .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98097
CP
98099
CP
98098
P ip e C u lv e r t
Profile grade
Existing ground
H W
.2 f t
Q c fs
P ip e C u lv e r t
2 42
2,289
Line to be constructed
See sheet K.2
Special rock embankment, type 2, RT
National Forest System Lands
National Forest System Lands
.5
+0.5000%
+1.447 4%
100' VC
K = 106
.0
K = 100
100' VC
PRELIM
IN
ARY
Not For
Con str uc
L
D H -2
P -2
,W
C -7
P T
.6
P C
.6
P T
.9
D
R= 1,600.00'
T= 158.84'
L= 316.63' e= 0.032
D
R= 5,000.00'
T= 81.66'
L= 163.31' e= NC
N
CUYD
EXC.
CUYD
EMB.
525+00 520+00 515+00 510+00
900 900
905 905
910 910
915 915
920 920
925 925
930 930
935 935
D.31
STATE PROJECT
M a y
P
M w f0 fx .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98101 CP
98102
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
Profile grade
Existing ground
Line to be constructed
H W
.8 f t
Q c fs
P ip e A r c h
See sheet E.6
Parking Area 12
National Forest System Lands
National Forest System Lands
2,984
CP
28100
.2
+1.447 4%
-0.6154%
300' VC
K = 145
SSD = 673'
.2
150' VC
K = 112
.2
+0.7273%
100' VC
K = 77
SSD = 881'
.2
-0.5714%
150' VC
K = 49
.2
+2.46 15%
150' VC
K = 77
SSD = 627'
PRELIM
IN
ARY
Not For
Con str uc
B-55
B-56
WC-6
WC-5
WC-4
P C
.3
P T
.9
P C
.0
P T
.9
P C
.3
D
R= 800.00'
T= 179.20'
L= 352.57' e= 0.046
D
R= 800.00'
T= 190.99'
L= 374.95' e= 0.046
N
CUYD
EXC.
CUYD
EMB.
540+00 535+00 530+00 525+00
910 910
915 915
920 920
925 925
930 930
935 935
940 940
945 945
D.32
STATE PROJECT
M a y
P
M w f0 fy .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98103
CP
98104
P ip e C u lv e r t
P ip e C u lv e r t
Existing ground
Profile grade
See sheet K.2
Special rock embankment, type 1, LT
See sheet K.2
Special rock embankment, type 1, RT
Line to be constructed
P ip e C u lv e r t
P ip e C u lv e r t
H W
.8 f t
Q c fs
P ip e C u lv e r t
H W
.0 f t
Q c fs
P ip e C u lv e r t
National Forest System Lands
National Forest System Lands
8,991
+0.5079%
PRELIM
IN
ARY
Not For
Con str uc
S I&
V W
P
B
S I&
V W
P
B 7 S I&
V W
P
B
P C
.3
P T
.6
P C
.9
P T
.1
P C
.0
PT 5
.0
D
R= 400.00'
T= 103.91'
L= 203.33' e= 0.060
D
R= 450.00'
T= 54.39'
L= 108.26' e= 0.058
D
R= 235.00'
T= 96.44'
L= 183.03' e= 0.060
N
CUYD
EXC.
CUYD
EMB.
555+00 550+00 545+00 540+00
925 945
930 950
935 955
940 960
945 965
950 970
955 975
960 980
D.33
STATE PROJECT
M a y
P
M w f0 fz .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
Line to be constructed
CP
98105
CP
98106
CP
98107
Middl e For k Sno qualm ie Riv er
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
Profile grade
Existing ground
Profile grade
Existing ground
C u lv e r t
P ip e
See sheet K.4
Deep patch, RT
See sheet C.7
Subgrade stabilization, type 1 5
See sheet E.6 Parking Area 13
See sheet E.6 Parking Area 14
National Forest System Lands
National Forest System Lands
See sheet K.7
Rolled erosion control product, type 3.B, LT
618 14 123 457
.2
+0.7333%
100' VC
K = 444
.0
+2.9
150' VC
K = 68
.0
-1.0000%
150' VC
K = 38
SSD = 349'
.7
350' VC
K = 32
.2
.0
200' VC
K = 17
SSD = 191'
PRELIM
IN
ARY
Not For
Con str uc
B-62
B-63
B-66
B-67
NTL CUT S-6
SI&VWP
B-65
SI&VWP
B-64
NTL DH-21
P T
.0
P C
.4
P T
.0
P C
.3
P T
.9
P C
.7
P T
.4
P C
.6
P T
.1
P C
.7
P T
.3
D
R= 150.00'
T= 29.14'
L= 57.57' e= 0.040
D
R= 150.00'
T= 107.58'
L= 186.65' e= 0.040
D
R= 235.00'
T= 77.49'
L= 149.70' e= 0.060
D
R= 800.00'
T= 141.18'
L= 279.48' e= 0.046
D
R= 1,000.00'
T= 65.40'
L= 130.62' e= 0.042
CUYD
EXC.
CUYD
EMB.
570+00 565+00 560+00 555+00
945 945
950 950
955 955
960 960
965 965
970 970
975 975
980 980
D.34
STATE PROJECT
M a y
P
M w f0 g a .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
CP
28406
Middle Fork Snoqualmie River
N
Line to be constructed
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
Profile grade
Existing ground
See sheet H.17
Low water crossing
D o N o t
D is tu r b
E x P ip e C u lv e r t
See sheet K.4
Deep patch, RT
See sheet C.7
Subgrade stabilization, type 1
See sheet K.4
Deep patch, RT
See sheet C.7
Subgrade stabilization, type 15
H W
.2 f t
Q c fs
T r e n c h D r a in f t s p a n x f t r is e
H W
.1 f t
Q c fs
T r e n c h D r a in f t s p a n x f t i n c h r is e
P ip e C u lv e r t
National Forest System Lands
National Forest System Lands
See sheet K.7
Rolled erosion control product, type 3.B, LT
238 13 1,676
1,282 444 1,289
28404
-1.8889%
SSD = 191'
.0
200' VC
K = 35
.5
+3.7
0%
-4.6667%200' VC
K = 24
SSD = 228'
.5
500' VC
K = 66
.5
+2.8
150' VC
K = 48
SSD = 418'
.0
-0.2857%
150' VC
K = 61
+2.18 18%
PRELIM
IN
ARY
Not For
Con str uc
B-76
WC-2
DCP-23,WC-3
DCP-22
DCP-21
DCP-20
P T
.3
5 P
C
.5
P T
.8
P C
.3
D
R= 10,000.00'
T= 44.62'
L= 89.23' e= NC
L= 199.55'
D
R= 400.00'
T= 101.90' e= 0.060
N
CUYD
EXC.
CUYD
EMB.
585+00 580+00 575+00 570+00
950 950
955 955
960 960
965 965
970 970
975 975
980 980
985 985
D.35
STATE PROJECT
M a y
P
M w f0 g b .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
Line to be constructed
CP
CP
98113
CP
98114
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
Existing ground
Profile grade
See sheet K.2
Special rock embankment, type 1, LT & RT
5,791
H W
.9 f t
Q c fs
P ip e C u lv e r t
H W
.6 f t
Q c fs
P ip e C u lv e r t
National Forest System Lands
National Forest System Lands
28407
+2.18 18%
.0
-1.1111%
200' VC
K = 61
SSD = 428'
.0
+1.1613
200' VC
K = 88
.0
+1.83 68%
100' VC
K = 148
PRELIM
IN
ARY
Not For
Con str uc
B-68
B-69
B-70
B-71
B-72
NTL DH-22
P T
.8
P C
.7
P T
.2
P C
.9
P T
.5
P C
.9
P T
.0
P C
.1
D
R= 400.00'
T= 101.90'
L= 199.55' e= 0.060
D
R= 300.00'
T= 142.17'
L= 265.53' e= 0.060
D
R= 340.00'
T= 52.21'
L= 103.61' e= 0.060
D
R= 340.00'
T= 129.83'
L= 248.03' e= 0.060
D
R= 1,600.00'
T= 152.48'
L= 304.04' e= 0.032
N
CUYD
EXC.
CUYD
EMB.
600+00 595+00 590+00 585+00
955 955
960 960
965 965
970 970
975 975
980 980
985 985
990 990
D.36
STATE PROJECT
M a y
A
M w f0 g c .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
Line to be constructed
CP
98115
CP
98116
CP
28408
Middle Fork Snoqualmie River
.8
T ST ST T
F ST ST T
GR LT
GR RT GR RT
GR LT
P ip e C u lv e r t
P ip e C u lv e r t
P ip e C u lv e r t
Existing ground
National Forest System Lands
National Forest System Lands
Rolled erosion control product, type 3.B, RT
Rolled erosion control product, type 3.B, LT
Rolled erosion control product, type 3.B, RT
Rolled erosion control product, type 3.B, LT
Profile grade
309 853
884 3,786
.4 sheets G.15-G.28.
construct new bridge. See
Remove existing bridge and
588+50 Bridge.
See sheets G.15-G.28.
and construct new bridge.
Remove existing bridge 588+50 Bridge.
.0
+0.5000% -0.6667%
100' VC
K = 86
SSD = 975'
.9
+1.83 68%
110' VC
K = 47
SSD = 517'
-0.5000%
-0.9496%
50' VC
K = 111
SSD = 2425'
.5
100' VC
K = 69
.0
PRELIM
IN
ARY
Not For
Con str uc
DCP-19
DCP-18
DCP-17
DCP-16
NTL DH-23
P T
.2
P C
.0
P T
.8
D
R= 550.00'
T= 191.67'
L= 368.85' e= 0.054
N
CUYD
EXC.
CUYD
EMB.
615+00 610+00 605+00 600+00
960 960
965 965
970 970
975 975
980 980
985 985
990 990
995 995
D.37
STATE PROJECT
M a y
P
M w f0 g d .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98119
M id d le Fork S n oq u alm ie R iver
Line to be constructed
P ip e C u lv e r t
Profile grade
Existing ground
104 6
7,959
See sheet E.6
Parking Area 15
National Forest System Lands
National Forest System Lands
.0
-0.6667%
+0.8529%
100' VC
K = 66
.2
200' VC
K = 104
.5
+2.7
+1.81 82%
100' VC
K = 104
SSD = 1174'
PRELIM
IN
ARY
Not For
Con str uc
P C
.9
P T
.2
5 P
C
.9
P T
.3
D
R= 10,000.00'
T= 104.13'
L= 208.25' e= NC
D
R= 10,000.00'
T= 141.20'
L= 282.38' e= NC
N
CUYD
EXC.
CUYD
EMB.
630+00 625+00 620+00 615+00
975 975
980 980
985 985
990 990
995 995
1000 1000
1005 1005
1010 1010
D.38
STATE PROJECT
M a y
P
M w f0 g e .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98121
P ip e C u lv e r t
P ip e C u lv e r t
Profile grade
Existing ground
P ip e C u lv e r t
H W
.1 f t
Q c fs
P ip e C u lv e r t
H W
.5 f t
Q c fs
P ip e C u lv e r t
6,000
National Forest System Lands
National Forest System Lands
Line to be constructed
CP
28409
.5
+1.81 82%
+0.7000%
500' VC
K = 447
SSD = 1215'
,0
.7
-0.5000%
100' VC
K = 83
SSD = 949'
.7
+1.0395%
100' VC
K = 65
PRELIM
IN
ARY
Not For
Con str uc
P -15
D C P -14
D C P -13
P C
.6
P T
.6
D
R= 10,000.00'
T= 46.50'
L= 93.00' e= NC
N
CUYD
EXC.
CUYD
EMB.
645+00 640+00 635+00 630+00
990 990
995 995
1000 1000
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
D.39
STATE PROJECT
M a y
P
M w f0 g f.
d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98122
Profile grade
Existing ground
5,958
Line to be constructed
H W
.6 f t
Q c fs
P ip e C u lv e r t
National Forest System Lands
National Forest System Lands
+1.0395%
PRELIM
IN
ARY
Not For
Con str uc
DCP-14
DCP-13
NTL DH-24
DCP-12
DCP-11
DCP-09
DCP-10
D
R= 475.00'
T= 138.41'
L= 269.37'
D
R= 275.00'
T= 92.80'
L= 178.99'
P C
.9
P T
.3
P C
.4
0P
T
.4 e= 0.058 e= 0.060
N
CUYD
EXC.
CUYD
EMB.
660+00 655+00 650+00 645+00
1005 1005
1010 1010
1015 1015
1020 1020
1025 1025
1030 1030
1035 1035
1040 1040
D.40
STATE PROJECT
M a y
A
M w f0 g g .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
Line to be constructed
CP
98123
CP
98124
CP
98125 reviR eimlauqonS kroF elddiM
Profile grade
Existing ground
H W
.3 f t
Q c fs
P ip e C u lv e r t
5,101
R/W
R/W
See sheet E.6
Parking Area 16
See sheet E.6
Parking Area 17
National Forest System Lands
National Forest System Lands
,0
.5
+0.5000%
100' VC
K = 185
SSD = 2050'
,0
.2
250' VC
K = 96
+3.0
+1.0395%
PRELIM
IN
ARY
Not For
Con str uc
P
D C P
D C P
D C P
0P
T
.4
P C
.9
P T
.9
D
R= 2,000.00'
T= 172.94'
L= 345.03' e= 0.028
N
CUYD
EXC.
CUYD
EMB.
675+00 670+00 665+00 660+00
1025 1025
1030 1030
1035 1035
1040 1040
1045 1045
1050 1050
1055 1055
1060 1060
D.41
STATE PROJECT
M a y
P
M w f0 g h .d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
98127
CP
98128
CP
98129
P ip e C u lv e r t
Profile grade
Existing ground
H W
.9 f t
Q c fs
P ip e C u lv e r t
Line to be constructed
D o N o t
D is tu r b
E x P ip e C u lv e r t
National Forest System Lands
National Forest System Lands alignment and profile.
for informational purposes only. Match existing
Note: Alignment and profile beyond 667+50.00
Area (Staging Area) Horse Trailer Parking Middle Fork Trailhead
A
,0
.7
+2.46 15%
100' VC
K = 159
SSD = 1764'
,0
.7
100' VC
K = 83
SSD = 941'
+1.2500
,0
.5
+1.2500
-1.2500%
150' VC
K = 60
SSD = 507'
,0
.2
PRELIM
IN
ARY
Not For
Con str uc
P
D C
P
D C
P
D C
P
5 P
O T
.7
N
CUYD
EXC.
CUYD
EMB.
685+00 680+00 675+00
1045 1045
1050 1050
1055 1055
1060 1060
1065 1065
1070 1070
1075 1075
1080 1080
D.42
STATE PROJECT
M a y
P
M w f0 g i.
d g n
U
S S u r
B E e c k e d b
T H
O M
P S s ig n e d b y
CP
28001
CP
28002
END PROJECT WA PFH 29-1(1)
685+50.00
RIVER ROAD
MIDDLE FORK SNOQUALMIE
No Scale
CONNECTION DETAIL
section
See typical
.0 surfacing aggregate
Existing
5%68
5+
Existing ground
Line to be constructed
E= 1384537.602
N= 811382.460
National Forest System Lands
National Forest System Lands
A
PRELIM
IN
ARY
Not For
Con str uc
M.P. 3.0
R= 55.00'
T= 38.39'
L= 67.04'
P C .7
P T
.7
P O
T
.0 e= NC
D
R= 10.00'
T= 6.28'
L= 11.22'
D
R= 50.00'
T= 6.34'
L= 12.61'
P C .9
P T
.1
P C
.5
P
T
.1
P O
T
.4 e= NC e= NC
GR RT
GR LT
CUYD
EXC.
CUYD
EMB.
11+00 10+00 31+00 30+00
782 776
784 778
786 780
788 782
790 784
792 786
794 788
E.2
STATE PROJECT
M a y
P
M w f0 r a .d g n
U
S ft
B E e c k e d b
T H
O M
P S s ig n e d b y
NOTE:
1. Adjust tie in to match existing field conditions
N
Line to be constructed
Approach 10+00
Mainline 202+92=
(MAINLINE 202+92 RT)
10+00 TO 11+15
GRANITE CREEK RD
Profile grade
Existing ground
NOTE:
1. Adjust tie in to match existing field conditions existing gate
Do not disturb
CP
98032
6 3
El.= 784.88
E= 1351417.765
N= 781281.673
11+15.00
END APPROACH ROAD
El.= 778.72
E= 1351316.308
N= 781263.315
MAINLINE 202+94.79
10+10.40
BEGIN APPROACH ROAD
N
CP
98030
El.= 785.78
E= 1350166.507
N= 780495.494
MAINLINE 188+70.00
30+10.00
BEGIN APPROACH ROAD
El.= 788.90
E= 1350153.377
N= 780450.720
30+70.50
END APPROACH ROAD
Approach 30+00
Mainline 188+70=
Profile grade
Existing ground
P E
P E
P E
P E
P/ E
P/ E
P/ E
P/ E
C/ E
C/ E
See sheet K.7
Rolled erosion control product, type 3.B, RT 1
Line to be constructed
(MAINLINE 188+70 RT)
30+00 TO 30+70.50
DNR PARKING ACCESS
.7
.3
.3
-2.0000%
.6
20' VC
K = 2
.9
.7
.8
-2.0000%
.2
.3
20' VC
K = 2
.8
.4
PRELIM
IN
ARY
Not For
Con str uc
PC
0+
.1
PO
T 20+
92.66
D
R= 10.00'
T= 6.75'
L= 11.88'
PT 20+
22.02 e= NC
CUYD
EXC.
CUYD
EMB.
21+00 20+00
E.3
STATE PROJECT
M a y
P
M w f0 r a .d g n
U
S ft
B E e c k e d b
T H
O M
P S s ig n e d b y
N
NOTE:
1. Adjust tie in to match existing field conditions
(MAINLINE 432+89 LT)
20+00 TO 20+85
BESSEMER RD
existing gate
Do not disturb
CP
98087
Existing ground Profile grade
Approach 20+00
Mainline 432+89.38=
El.= 933.59
E= 1365345.071
N= 797940.263
MAINLINE 432+89.38
20+10.00
BEGIN APPROACH ROAD
El.= 936.94
E= 1365377.848
N= 798005.030
20+85.00
END APPROACH ROAD
Line to be constructed
P /E
P /E
P /E
P /E
C/ E
C/ E
.3
-2.0000%
.5
.8
20' VC
K = 2
.2
.4
6.
20' VC
K = 13
SSD = 706'
.9
PRELIM
IN
ARY
Not For
Con str uc
BEGIN BRIDGE
END BRIDGE
80'-0"130'-0"80'-0"
REPAIR ITEMS:
Pier 1
Pier 2
Bridge
LC
LC
LC
13'-0"13'-0"2'-7" 2'-7"
" = 1'-0"2
1SCALE:
SCALE: 1" = 60'
EXISTING BRIDGE PLAN VIEW
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
AS SHOWN K. NGUYEN C. TUTTLE F. ISMAIL
NO. DATE BY REVISIONS
BRIDGE DRAWING
of
DATE DRAWING NO.
G.1
STATE PROJECT
M a y
P
M w f0 y a .d g n
U
S S u r ft
D
Existing bridge post rail not shown
BridgeLC
EXISTING BRIDGE TYPICAL SECTION
"/ft.8 1Slope "/ft.8
1Slope
" Existing concrete2 thickness
MIDDLE FORK SNOQUALMIE
KING COUNTY BRIDGE NO. 359B
BRIDGE 326+00.00
damage existing deck reinforcement.
deck overlay as shown with hatched area. Do not the top mat of reinforcement and replace with new
" of the existing concrete deck surface to 2 1Remove 1 damage concrete surface.
the exposed concrete surface as shown. Do not
Pressure wash and remove all moss and debris of
TO
B
E
CO
M
PLETEDPRELIM
IN
ARY
Not For
Con str uc
DATE
MIDDLE FORK SNOQUALMIE
DRAWING NO.
G.2
STATE PROJECT
M a y
P
M w f0 y b .d g n
U
S S u r ft
D
KING COUNTY BRIDGE NO. 359B
"2 19'-4" = 2
13 spac. @ 3'-1 slotted holes
"32 29" x 8
1(8) 1
2" 3"
2'-6"
3"3
G a
6'-0" long post (typ.) Connection Detail
See Transition
TERMINAL CONNECTOR
DETAIL
TRANSITION CONNECTION
Terminal connector, see detail
ELEVATION VIEW
Terminal Section
PLAN VIEW
STRUCTURE TRANSITION RAILING Top of curb
Roadway grade barrier and jam nuts thru 1" holes in concrete
" Ø A325 bolts with washers, nuts8
BRIDGE 326+00.00
with 6" x 8" timber blocks (typ.)
Transition posts will be steel
4" barrier
Existing concrete
"2
3'-8"
W-Beam rail
" Ø Guardrail bolt, typ.8 barrier
Existing concrete
10"
2-W-Beam type 4 (Weathering) - class B (10 guage)
PRELIM
IN
ARY
Not For
Con str uc
Q Vm WS EL.
upstream face of bridge.
Note: Water surface elevations are at
Q
Q
Q
Q
Abutment 2 Abutment 1
PROFILE GRADE DIAGRAM
ELEVATION
HYDRAULIC DATA
Bridge elevations are at profile grade @ layout line
MT. BAKER - SNOQUALMIE NATIONAL FOREST
KING COUNTY, WA
(King County Bridge No. 359D)
PLAN & ELEVATION
BRIDGE 471+85.00
BRIDGE DRAWING INDEX
DESCRIPTION
4.1
3.4
3.1
1.8
893.9
893.2
892.9
890.4
END BRIDGE
F lo w
BEGIN BRIDGE
Approach slab
NO.
DRAWING
+0.50% grade
LC
PLAN
El. 899.76
STA. 471+49.72
El. 900.21
STA. 472+40.06
60' VC
N
Approach slab
El. 899.52El. 899.48
El. 899.52El. 899.48
El. 900.01 El. 899.97
El. 899.97 El. 900.01
LC
Exp. Exp.
El. 892.77El. 892.34
Est. tip El. 826.00 Est. tip El. 826.00
2-tube steel rail
OHW = El. 890.4
Q = El. 893.2100
@ roadway
Existing ground existing channel
Do not disturb
El. 895.00
Finish ground
El. 894.50
Finish ground
El. 895.92
Bottom chord
+0.5000%
.2
SSD = 1065'
100' VC
K = 94
RG2932-K
RG2932-J
RG2932-I
RG2932-H
RG2932-G
RG2932-F
RG2932-E
RG2932-D
RG2932-C
RG2932-B-1
RG2932-B
RG2932-A
REBAR LIST
APPROACH RAILING DETAILS
BRIDGE RAILING AND CURB
APPROACH SLAB
GIRDER SECTIONS
DECK PLAN DETAILS
WING WALL DETAILS
END WALL DETAILS
ABUTMENT CAP
BORING LOCATION PLAN
GENERAL NOTES & FOUNDATION PLAN
PLAN & ELEVATION
NTS
railing (typ.)
Structure transition
El. 892.84 El. 893.27
(typ.)
to remain in place
Existing timber log
1.5
1.5
RG2932-A
M. Traffalis 1/8" = 1'-0" K. Nguyen C. Tuttle F. Ismail
DATE
DRAWING NO.
G.3
STATE PROJECT
P
M e c e m b e r
B .B a s e .U
S c m y fi le s p w p r o d u c ti o n d
W o r k d d .c e l
8'-0"90'-4" Bridge length8'-0"
Rdwy
Bridge @LC railing (typ.)
Structure transition
Bulb-Tee girders
Prestressed decked filled steel pipe pile (typ.)
" thick concrete2 116"Ø x
Rdwy surface
K = 59
.7
PRELIM
IN
ARY
Not For
Con str uc
GENERAL NOTES:
ESTIMATE
ITEM NO. DESCRIPTION UNITQUANTITY NOTES
ESTIMATE NOTES:
RG2932-B
M. Traffalis NTS K. Nguyen C. Tuttle F. Ismail
DATE DRAWING NO.
G.4
STATE PROJECT
w f0 s b .d g n
U
S S u r ft
D
MT. BAKER - SNOQUALMIE NATIONAL FOREST
KING COUNTY, WA
(King County Bridge No. 359D)
BRIDGE 471+85.00
PLAN
GENERAL NOTES & FOUNDATION
NOTES:
Design scour elevation = 879. Install all piles with tip elevations below 859.
Do not drive any other piling at the abutment during the test pile set-up period.
criteria and the pile tip elevations. See Special Contract Requirements.
21 day set-up period. Use the dynamic load test results to establish the pile driving abutment. Perform load tests on test pile during initial drive and during re-strike after
Perform dynamic load testing with signal matching on the first pile driven at each
The factored strength I limit state axial load per pile = 184 kips.
The required compressive nominal bearing resistance per pile during re-strike = 345 kips.
4.
3.
3.
2.
1.
FOUNDATION PLAN
N
F lo w
STA. 472+40.06
STA. 471+49.72
BEGIN BRIDGE
pile Bearing @LC
LC
Bearing @ pileLC LC
Abutment 1
Abutment 2
1'-5" 1'-5" p il e s p a ty p e q s p a
Bridge @ RdwyLC LC
B-53
B-54
B-51
B-52
(estimated quantity = 32 cuyds), furnishing and attaching pile tips.
(5) Includes cost of furnishing and installing filled pipe pile 16 inch x 0.5 inch. Includes cost of concrete class (A)
(4) Includes cost of furnishing and placing grout under rail post bearing plates.
for the manufacture or erection of the girders.
steel diaphragms, diaphragm anchor bolts, grout, support brackets for utility lines and any other materials required
(3) Includes cost of concrete, reinforcing steel (epoxy), prestressing steel, lifting devices, welded connections, steel guard angles, geocomposite sheet drain, (estimated quantity = 12 sqyd) and drain gates.
(2) Includes cost of furnishing and installing performed flexible cellular, joint filler, preformed expansion joint filler,
(1) Contract quantity.
90'-4" Bridge length
Test pile
Test pile
2'-9"84'-10"2'-9"
61707-0000
56401-1000
55901-0000
55601-0900
55401-2000
55302-3700
55201-0200
55104-1000
55101-0200
20803-0000
20801-0000
20304-1000
14,520
All required
LNFT
EACH
SQYD
LNFT
LB
LNFT
CUYD
EACH
LNFT
CUYD
CUYD
LPSM
(1)
(1)
(1)
(1) (4)
(1)
(1) (3)
(1) (2)
(1)
(5)
(1)
(1)
Summary of Subsurface Information on Sheet G.5.
For geotechnical information see Geotechnical Report No. 10-12, prepared by WFLHD. See
GEOTECHNICAL REPORT:
below estimated tip elevation without approval of the CO.
tip elevation shown is for estimating quantities only. Do not drive piles beyond one foot
60 degree conical point end closure conforming to ASTM A27 65/35. The minimum
Steel pipe piles shall conform to ASTM A 252, grade 3. All piles shall have inside-flanged
STEEL PIPE PILES:
to ASTM A307 galvanized.
tie connections shall be furnished in black iron finish. Diaphragm anchor bolts shall conform
ASTM A36. All structural metal shall be galvanized after fabrication except girder welded
All structural metal for welded connections, and structural steel shapes shall conform to
MISCELLANEOUS STRUCTURAL METAL:
manufacture and erection.
curb ties, joint filler, bearing devices, and any other details and material required for reinforcing steel (conventional and prestressed), concrete inserts, lifting devices, grouting, Standard Specifications. Detail the precast prestressed girder units, indicating on the plans and railing. Provide smooth finish on the top surface of the girders according to FP-03
Deflect forms to compensate for camber. Camber shall be "0" after placing wearing surface
LRFD Bridge Design Specifications, except limit tensile stresses to zero after losses.
Design precast prestressed concrete decked Bulb-Tee Units according to current AASHTO
PRESTRESSED CONCRETE DECKED BULB-TEE UNITS:
relaxation prestressing strand conforming to AASHTO M203 (ASTM A416).
Pretensioned, prestressing steel shall be Grade 270, 0.6-inch Ø, seven-wire, bright low
PRESTRESSING STEEL:
curbs, endwalls, pile cap, wing walls, approach slab, and sleeper beam).
unless shown otherwise on the plans. All reinforcing steel shall be epoxy coated (girders, Grade 60). The minimum concrete covering to the face of any bar shall be 2 inches, All reinforcing steel shall conform to AASHTO M31, Grade 60 deformed (ASTM, A615, REINFORCING STEEL:
expansion joint filler shall meet the requirements of AASHTO M213.
joint filler shall meet the requriements of ASTM D1056, type 2, Grade 2 or 3. Preformed
", unless shown otherwise on plans. Preformed flexible cellular 4 3edges of all concrete shall be made with type II cement. All cement shall be low alkali cement. Chamfer exposed minimum 28-day design compressive strength, f'c=3500 psi. All Class A(AE) concrete design compressive strength fc'=4000 psi. Use Class A concrete to fill steel pipe pile with
All cast-in-place concrete shall be structural concrete Class A(AE) with a minimum 28-day
CAST-IN-PLACE:
Vehicle load : HL93: Maximum dynamic load allowance (Impact), IM=33%
LIVE LOAD:
Active lateral earth pressure: Equivalent fluid unit weight of soil, 36 pcf.
Concrete wearing surface : 150 lb. per cubic foot.
Concrete in Prestressed concrete Units : 155 lb per cubic foot.
Cast-in-place concrete : 150 lb per cubic foot.
DEAD LOAD:
Construction of Roads and Bridges on Federal Highway Projects, FP-03 (U.S. Customary).
CONSTRUCTION: Federal Highway Administration Standard Specifications for
Edition 2010.
DESIGN: AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 5th
SPECIFICATIONS:
2'-10"
Structure transition railing, weathering steel
Bearing device, elastomeric
Membrane waterproofing
Bridge railing, weathering steel
Reinforcing steel, epoxy coated
Precast, prestressed concrete decked bulb tee girders
Structural concrete, class A(AE)
Dynamic pile load test
Concrete filled steel pipe piles, in place (16" Ø x 0.5")
Structure backfill
Structure excavation
Removal of structures and obstructions
PRELIM
IN
ARY
Not For
Con str uc
Q Vm WS EL.
12.2
11.1
10.7
7.7
971.5
970.6
970.3
968.4 upstream face of bridge.
Note: Water surface elevations are at
Q
Q
Q
Q
1.5
N
END BRIDGE
Abutment 2Abutment 1
Exp. Exp.
D
R= 300.00'
T= 142.17'
-0.501% grade
F lo w
LC
LC
e= 0.060
L= 265.53'
PROFILE GRADE DIAGRAM
PLAN
ELEVATION
HYDRAULIC DATA
8'-0"
12'-0" along layout line
E N
D B
R I D
G E
Bridge elevations are at profile grade @ layout line
B E
G I N B
R I D
G E
-0.501%
Existing ground
El. 971.07
Top of riprap
El. 970.70
Top of riprap at roadway surface.
NOTE: Elevations shown are
MT. BAKER - SNOQUALMIE NATIONAL FOREST
KING COUNTY, WA
(King County Bridge No. 359E)
PLAN & ELEVATION
BRIDGE 588+50.00
10°10°
El. 970.57 El. 970.20
BRIDGE DRAWING INDEX
DRAWING NO. DESCRIPTION
Est. tip El. 901.00Est. tip El. 901.00
OHW
RG2933-M
RG2933-L
RG2933-K
RG2933-J
RG2933-I
RG2933-H
RG2933-G
RG2933-F
RG2933-E
RG2933-D
RG2933-C
RG2933-B-1
RG2933-B
RG2933-A
REBAR LIST
APPROACH RAILING DETAILS
BRIDGE RAILING DETAILS
BRIDGE RAILING AND CURB
APPROACH SLAB
GIRDER SECTIONS
DECK PLAN DETAILS
UPSTREAM WING WALL DETAILS
DOWNSTREAM WING WALL DETAILS
END WALL DETAILS
ABUTMENT CAP
BORING LOCATION PLAN
GENERAL NOTES & FOUNDATION PLAN
PLAN & ELEVATION
1 1
1.5 1.5
NTS
.0
.9
E L .5
S T
A
.0
E L .1
S T
A
.2
El. 977.84
8'-0"
El. 978.96
R=315.17
Approach slab
El. 977.40 railing (typ.)
Structure transition
R=287.33
El. 977.44 chord line
Layout line @
El. 978.99
Approach slab
El. 977.87
R=287.33
R=315.17
El. 979.43 El. 979.39
Bridge
Rdwy
(measured along layout line)
79'-4" Bridge length
= El. 970.6Q
= El.968.4 for riprap details
See roadway plans
El. 973.96
Bottom chord filled steel pipe pile (typ.)
" thick concrete2 116"Ø x
Rdwy surface railing (typ.)
Structure transition
Bulb-Tee girders
Prestressed decked
2-tube steel rail
Elevation 959.00
EL. 978.13
STA. 588+92.43
BEGIN BRIDGE
EL. 978.53
STA. 588+12.86
RG2933-A
M. Traffalis 1/8"=1'-0" K. Nguyen C. Tuttle F. Ismail
DATE
DRAWING NO.
G.15
STATE PROJECT
P
M
M a r c h
U
S S u r ft c m y fi le s p w p r o d u c ti o n d w f0 z a .d g n
PRELIM
IN
ARY
Not For
Con str uc
GENERAL NOTES:
ESTIMATE
ITEM NO. DESCRIPTION UNITQUANTITY NOTES
ESTIMATE NOTES:
(estimated quantity = 33 cuyds), furnishing and attaching pile tips.
(5) Includes cost of furnishing and installing filled pipe pile 16 x 0.5 inch. Includes cost of concrete class (A)
(4) Includes cost of furnishing and placing grout under rail post bearing plates.
for the manufacture or erection of the girders.
diaphragm anchor bolts, grout, support brackets for utility lines and any other materials required
(3) Includes cost of concrete, reinforcing steel (epoxy), prestressing steel, lifting devices, welded connections, geocomposite sheet drain, (estimated quantity = 34 sqyd) and drain gates.
(2) Includes cost of furnishing and installing performed flexible cellular joint filler, preformed expansion joint filler,
(1) Contract quantity.
RG2933-B
M. Traffalis NTS K. Nguyen C. Tuttle F. Ismail
DATE DRAWING NO.
G.16
STATE PROJECT
w f0 z b .d g n
U
S S u r ft
D
MT. BAKER - SNOQUALMIE NATIONAL FOREST
KING COUNTY, WA
(King County Bridge No. 359E)
BRIDGE 588+50.00
PLAN
GENERAL NOTES & FOUNDATION
NOTES:
Design scour elevation = 944. Install all piles with tip elevations below 924.
Do not drive any other piling at the abutment during the test pile set-up period.
criteria and the pile tip elevations. See Special Contract Requirements.
21 day set-up period. Use the dynamic load test results to establish the pile driving abutment. Perform load tests on test pile during initial drive and during re-strike after
Perform dynamic load testing with signal matching on the first pile driven at each
The factored strength I limit state axial load per pile = 196 kips.
The required compressive nominal bearing resistance per pile during re-strike = 397 kips.
4.
3.
3.
2.
1.
pile Bearing @LC
LC
Layout line
Bridge
Roadway
LC
LC
BEGIN BRIDGE
Bearing @ pileLCLC
B-68
Abutment 1 Abutment 2
FOUNDATION PLAN
F lo w
STA. 588+92.43
STA. 588+12.86
B-69
N
(Measured along layout line)
79'-4" (Bridge length)
73'-10"2'-9" 2'-9"
2'-10"2'-10" p il e s p a c in g
S e e S h e e t
G .1 f o r
61707-0000
56401-1000
55901-0000
55601-0900
55401-2000
55302-3700
55201-0200
55104-1000
55101-0200
20803-0000
20801-0000
20304-1000
13,175
All required
LNFT
EACH
SQYD
LNFT
LB
LNFT
CUYD
EACH
LNFT
CUYD
CUYD
LPSM
(1)
(1)
(1)
(1) (4)
(1)
(1) (3)
(1) (2)
(1)
(5)
(1)
(1)
See Summary of Subsurface Information on Sheet G.17.
For geotechnical information see Geotechnical Memorandom GM20-12, prepared by WFLHD.
GEOTECHNICAL REPORT:
below estimated tip elevation without approval of the CO.
tip elevation shown is for estimating quantities only. Do not drive piles beyond one foot
60 degree conical point end closure conforming to ASTM A27 65/35. The minimum
Steel pipe piles shall conform to ASTM A 252, grade 3. All piles shall have inside-flanged
STEEL PIPE PILES:
to ASTM A307 galvanized.
tie connections shall be furnished in black iron finish. Diaphragm anchor bolts shall conform
ASTM A36. All structural metal shall be galvanized after fabrication except girder welded
All structural metal for welded connections, and structural steel shapes shall conform to
MISCELLANEOUS STRUCTURAL METAL:
manufacture and erection.
curb ties, joint filler, bearing devices, and any other details and material required for reinforcing steel (conventional and prestressed), concrete inserts, lifting devices, grouting, Standard Specifications. Detail the precast prestressed girder units, indicating on the plans and railing. Provide smooth finish on the top surface of the girders according to FP-03
Deflect forms to compensate for camber. Camber shall be "0" after placing wearing surface
LRFD Bridge Design Specifications, except limit tensile stresses to zero after losses.
Design precast prestressed concrete decked Bulb-Tee Units according to current AASHTO
PRESTRESSED CONCRETE DECKED BULB-TEE UNITS:
relaxation prestressing strand conforming to AASHTO M203 (ASTM A416).
Pretensioned, prestressing steel shall be Grade 270, 0.6-inch Ø, seven-wire, bright low
PRESTRESSING STEEL:
coated (girders, curbs, endwalls, pile cap, wing walls, approach slab, and sleeper beam).
unless shown otherwise on the plans. All superstructure reinforcing steel shall be epoxy
Grade 60). The minimum concrete covering to the face of any bar shall be 2 inches, All reinforcing steel shall conform to AASHTO M31, Grade 60 deformed (ASTM, A615, REINFORCING STEEL:
expansion joint filler shall meet the requirements of AASHTO M213.
joint filler shall meet the requriements of ASTM D1056, type 2, Grade 2 or 3. Preformed
", unless shown otherwise on plans. Preformed flexible cellular 4 3edges of all concrete be made with type II cement. All cement shall be low alkali cement. Chamfer exposed minimum 28-day design compressive strength, f'c=3500 psi. All Class A(AE) concrete shall design compressive strength fc'=4000 psi. Use Class A concrete to fill steel pipe pile with
All cast-in-place concrete shall be structural concrete Class A(AE) with a minimum 28-day
CAST-IN-PLACE:
Vehicle load : HL93: Maximum dynamic load allowance (Impact), IM=33%
LIVE LOAD:
Active lateral earth pressure: Equivalent fluid unit weight of soil, 36 pcf.
Concrete wearing surface : 150 lb. per cubic foot.
Concrete in Prestressed concrete Units : 155 lb per cubic foot.
Cast-in-place concrete : 150 lb per cubic foot.
DEAD LOAD:
Construction of Roads and Bridges on Federal Highway Projects, FP-03 (U.S. Customary).
CONSTRUCTION: Federal Highway Administration Standard Specifications for
Edition 2010.
DESIGN: AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 5th
SPECIFICATIONS:
Test pile Test pile
Structure transition railing, weathering steel
Bearing device, elastomeric
Membrane waterproofing
Bridge railing, weathering steel
Reinforciement steel, epoxy coated
Precast, prestressed concrete decked bulb tee girders
Structural concrete, class A(AE)
Dynamic pile load test
Concrete filled steel pipe piles, in place (16" Ø x 0.5")
Structure backfill
Structure excavation
Removal of structures and obstructions
PRELIM
IN
ARY
Not For
Con str uc