UT FTNP Zion 13(1), Kolob Canyon

Award Notice Posted

Solicitation number
6982AF18B000004
Agency
Awarded
to Staker & Parson Companies
Set-aside
No set-aside

Opportunity facts

Contract number
6982AF18C000024 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Washington County Zion National Park, Utah 84767, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Amendment A001 added

Update #3 ·

This is an Invitation for Bid, final plans and specs are available.

Representatives from the Federal Highway Administration (FHWA) conducted a site visit and pre-bid meeting, on Wednesday November 29, 2017. Another site visit will not be conducted. All interested bidders are encouraged to view the area on their own.


PROJECT DETAILS: UT FTNP Zion 13(1), Kolob Canyon


The project is located in Zion National Park, Washington County, UT.


The proposed project includes road and pavement rehabilitation of 6.2 miles of Zion Canyon Scenic Drive. Kolob Canyon Road construction includes but is not limited to pulverizing of existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curbing, replacement of CMP culverts, and riprap placement. Zion Canyon Scenic Drive construction includes but is not limited to milling of the existing pavement, overlay with asphalt concrete paving, reconstruct one intersection with Portland cement concrete paving.


This project consists of:
Schedule A: Reconstruction of 5.3 miles of Kolob Canyon Road, by pulverizing and paving. Significant Items for Schedule A Include: 92,000 SY of existing pavement pulverization, 17,600 tons of hot asphalt concrete paving, 14,000 LF of concrete curb, and 1,400 LF of pipe culvert placement. Potential landslide mitigation may include excavation and stabilization work.


Option V - Kolob Canyons Road Comfort Stations (Restroom Facilities)


Option W: Zion Canyon Scenic Drive/Zion Lodge Intersection


Option X: Zion Canyon Scenic Drive


Option Y: Rehabilitation of 6.2 miles of Zion Canyon Scenic Drive by milling and overlaying the existing pavement. Significant Items for Option Y Include: 93,000 SY of milling existing asphalt pavement, 7,500 tons of hot asphalt concrete paving.


Option Z: Reconstruction of the Zion Canyon Scenic Drive and Zion Lodge entrance intersection with Portland cement concrete paving. Significant Items for Option Z Include: Removal of 950 CY of existing pavement and construction 1,400 SY of PCCP.


Solicitation will be full and open competition.


Estimated total cost is $5 million to $10 million.

Update #2 ·

This is not an Invitation for Bid, final plans and specs are not available.

Representatives from the Federal Highway Administration (FHWA) conducted a site visit and pre-bid meeting, on Wednesday November 29, 2017.  Another site visit will not be conducted. All interested bidders are encouraged to view the area on their own.

PROJECT DETAILS: UT FTNP Zion 13(1), Kolob Canyon

The project is located in Zion National Park, Washington County, UT.

The proposed project includes road and pavement rehabilitation of 6.2 miles of Zion Canyon Scenic Drive. Kolob Canyon Road construction includes but is not limited to pulverizing of existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curbing, replacement of CMP culverts, and riprap placement. Zion Canyon Scenic Drive construction includes but is not limited to milling of the existing pavement, overlay with asphalt concrete paving, reconstruct one intersection with Portland cement concrete paving.

This project consists of:

Schedule A: Reconstruction of 5.3 miles of Kolob Canyon Road, by pulverizing and paving.
Significant Items for Schedule A Include: 92,000 SY of existing pavement pulverization, 17,600 tons of hot asphalt concrete paving, 14,000 LF of concrete curb, and 1,400 LF of pipe culvert placement. Potential landslide mitigation may include excavation and stabilization work.

Option Y: Rehabilitation of 6.2 miles of Zion Canyon Scenic Drive by milling and overlaying the existing pavement.
Significant Items for Option Y Include: 93,000 SY of milling existing asphalt pavement, 7,500 tons of hot asphalt concrete paving.

Option Z: Reconstruction of the Zion Canyon Scenic Drive and Zion Lodge entrance intersection with Portland cement concrete paving.
Significant Items for Option Z Include: Removal of 950 CY of existing pavement and construction 1,400 SY of PCCP.

Solicitation will be full and open competition.

Estimated total cost is $5 million to $10 million.

Update #1 ·

This is not an Invitation for Bid, final plans and specs are not available.

This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will conduct a site visit on Wednesday November 29, from 9:30 a.m. Utah time to approximately 2 p.m. Utah time.


Interested parties will meet at the Zion National Park Kolob Canyon Visitor Center Parking Lot at 9:30 a.m. and depart for the project site after a brief presentation.


Each Offeror will provide their own transportation to review the project site. Notice: The project is at extremely high elevation and there is potential for winter weather. Bring vehicles capable of such conditions. Questions will be addressed after a brief presentation by the FHWA; a summary of those questions, the agenda, and any other information from the pre-bid meeting will be posted to www.fbo.gov shortly after.


Key maps of the project work areas will be provided. 100% plans will be available when the project is advertised.


If you would like to attend the pre-bid meeting, please contact cflcontracts@dot.gov by close of business Tuesday, November 28, 2017.


ATTENDANCE AT THE PROJECT PRE-BID MEETING IS NOT MANDATORY TO BID THE PROJECT.


PROJECT DETAILS: UT FTNP Zion 13(1), Kolob Canyon


The project is located in Zion National Park, Washington County, UT.
The proposed project includes road and pavement rehabilitation of 6.2 miles of Zion Canyon Scenic Drive. Kolob Canyon Road construction includes but is not limited to pulverizing of existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curbing, replacement of CMP culverts, and riprap placement. Zion Canyon Scenic Drive construction includes but is not limited to milling of the existing pavement, overlay with asphalt concrete paving, reconstruct one intersection with Portland cement concrete paving.
This project consists of:


Schedule A: Reconstruction of 5.3 miles of Kolob Canyon Road, by pulverizing and paving
Significant Items for Schedule A Include: 92,000 SY of existing pavement pulverization, 17,600 tons of hot asphalt concrete paving, 14,000 LF of concrete curb, and 1,400 LF of pipe culvert placement. Potential landslide mitigation may include excavation and stabilization work.


Option Y: Rehabilitation of 6.2 miles of Zion Canyon Scenic Drive by milling and overlaying the existing pavement.
Significant Items for Option Y Include: 93,000 SY of milling existing asphalt pavement, 7,500 tons of hot asphalt concrete paving.


Option Z: Reconstruction of the Zion Canyon Scenic Drive and Zion Lodge entrance intersection with Portland cement concrete paving.


Significant Items for Option Z Include: Removal of 950 CY of existing pavement and construction 1,400 SY of PCCP.


Estimated total cost is $5 million to $10 million.


It is anticipated that this will be a full and open competition.

Files

File Type Posted
BID_TABS_-_UT_FTNP_13(1).pdf PDF
Bid_Summary.pdf PDF
Q_and_A_UT_FTNP_ZION_13_4_Apr_18.pdf PDF
Q_and_A_UT_FTNP_ZION_13_2_Apr_18.pdf PDF
SF30_UT_FTNP_ZION_13(1)_30_Mar_18.pdf PDF
ADM_SCR_Final_UT_FTNP_13(1)_Kolob_Canyon_Rd_PSE_3-22-18.pdf PDF
Q_and_A_UT_FTNP_ZION_13.pdf PDF
p_(1).pdf PDF
s.pdf PDF
h_(2).pdf PDF
g_(3).pdf PDF
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity