BID_TABS_-_UT_FTNP_13(1).pdf
PDF 60 KB Posted
- Attached to
- UT FTNP Zion 13(1), Kolob Canyon
- Solicitation number
- 6982AF18B000004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Summary.pdf | ||
| Q_and_A_UT_FTNP_ZION_13_4_Apr_18.pdf | ||
| Q_and_A_UT_FTNP_ZION_13_2_Apr_18.pdf | ||
| SF30_UT_FTNP_ZION_13(1)_30_Mar_18.pdf | ||
| ADM_SCR_Final_UT_FTNP_13(1)_Kolob_Canyon_Rd_PSE_3-22-18.pdf | ||
| Q_and_A_UT_FTNP_ZION_13.pdf | ||
| p_(1).pdf | ||
| g_(3).pdf | ||
| s.pdf | ||
| h_(2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S Schedule A Total of Bid Items: 8,156,760.00$ -6.0% 7,664,770.00$ 10.7% 9,031,204.36$ Project No: Utah UT FTNP ZION 13(1)
Project Name: Kolob Canyons Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 805,000.00$ 805,000.00$ 770,799.50$ 1,425,000.00$
15210-1000 Line A0040 5.330 MILE 3,500.00$ 18,655.00$ 14,924.00$ 8,112.26$
15214-2000 Line A0060 ALL LPSM 3,000.00$ 3,000.00$ 3,300.00$ 7,345.00$
15215-1000 Line A0080 2 EACH 850.00$ 1,700.00$ 1,400.00$ 8,100.00$
15215-3000 Line A0100 45 EACH 600.00$ 27,000.00$ 16,200.00$ 10,125.00$
15215-7000 Line A0120 4 EACH 1,500.00$ 6,000.00$ 17,800.00$ 7,344.00$
15216-2000 Line A0140 5.330 MILE 7,500.00$ 39,975.00$ 17,056.00$ 15,963.35$
15225-0000 Line A0160 0.500 MILE 5,000.00$ 2,500.00$ 1,600.00$ 1,520.00$
15301-0000 Line A0180 ALL LPSM 180,000.00$ 180,000.00$ 110,000.00$ 76,000.00$
15401-0000 Line A0200 ALL LPSM 180,000.00$ 180,000.00$ 44,000.00$ 88,650.00$
15501-0000 Line A0220 ALL LPSM 20,000.00$ 20,000.00$ 1,700.00$ 7,685.00$
15705-1400 Line A0240 32,500 LNFT 4.75$ 154,375.00$ 107,250.00$ 123,500.00$
15706-0200 Line A0260 340 EACH 200.00$ 68,000.00$ 24,480.00$ 120,700.00$
15706-1000 Line A0280 79 EACH 300.00$ 23,700.00$ 5,688.00$ 15,010.00$
15706-1600 Line A0300 1 EACH 3,500.00$ 3,500.00$ 2,200.00$ 3,986.00$
15802-0000 Line A0320 ALL LPSM 30,000.00$ 30,000.00$ 27,000.00$ 118,415.00$
20101-0000 Line A0340 1.0 ACRE 6,000.00$ 6,000.00$ 5,500.00$ 22,522.00$
20220-1000 Line A0360 5 EACH 400.00$ 2,000.00$ 3,250.00$ 2,565.00$
20301-1100 Line A0380 3 EACH 400.00$ 1,200.00$ 1,260.00$ 702.00$
Engineer's Estimate
420.00$ 234.00$
650.00$ 513.00$
5,500.00$ 22,522.00$
27,000.00$ 118,415.00$
2,200.00$ 3,986.00$
72.00$ 190.00$
72.00$ 355.00$
3.30$ 3.80$
1,700.00$ 7,685.00$
44,000.00$ 88,650.00$
110,000.00$ 76,000.00$
3,200.00$ 3,040.00$
3,200.00$ 2,995.00$
4,450.00$ 1,836.00$
360.00$ 225.00$
1,522.00$
3,300.00$ 7,345.00$
Parsons Companies dba Western Rock Sunroc Corporation
2,800.00$
770,799.50$ 1,425,000.00$
MOBILIZATION
CENTERLINE, STAKING
SURVEY AND STAKING, RETAINING WALL
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL, INDIVIDUAL TREE
SURVEY AND STAKING, GRADE FINISHING STAKES
SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
REMOVAL OF GATE
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, PARKING AREA
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
SURVEY AND STAKING, APPROACH ROAD
700.00$ 4,050.00$
4/6/2018 Page 1 of 6
Project No: Utah UT FTNP ZION 13(1)
Project Name: Kolob Canyons Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Parsons Companies dba Western Rock Sunroc Corporation
20301-1400 Line A0400 16 EACH 500.00$ 8,000.00$ 14,400.00$ 4,560.00$
20301-1900 Line A0420 28 EACH 1,000.00$ 28,000.00$ 34,300.00$ 18,984.00$
20301-2000 Line A0440 27 EACH 450.00$ 12,150.00$ 7,830.00$ 3,051.00$
20301-2400 Line A0460 103 EACH 25.00$ 2,575.00$ 10,815.00$ 7,519.00$
20302-0300 Line A0480 2,800 LNFT 4.00$ 11,200.00$ 12,600.00$ 11,200.00$
20302-0400 Line A0500 12,200 LNFT 1.25$ 15,250.00$ 15,860.00$ 21,350.00$
20302-0600 Line A0520 60 LNFT 60.00$ 3,600.00$ 3,300.00$ 456.00$
20302-1200 Line A0540 1,200 LNFT 10.00$ 12,000.00$ 5,100.00$ 5,520.00$
20303-1600 Line A0560 18,050 SQYD 3.00$ 54,150.00$ 102,885.00$ 79,420.00$
20303-2300 Line A0580 15 SQYD 65.00$ 975.00$ 250.50$ 330.00$
20303-3000 Line A0600 350 SQYD 5.00$ 1,750.00$ 2,345.00$ 2,607.50$
20303-3200 Line A0620 500 SQYD 5.00$ 2,500.00$ 3,550.00$ 5,000.00$
20402-0000 Line A0640 3,500 CUYD 24.00$ 84,000.00$ 129,500.00$ 161,000.00$
20425-1000 Line A0660 70 LNFT 30.00$ 2,100.00$ 770.00$ 3,675.00$
20435-1000 Line A0680 3,500 CUYD 40.00$ 140,000.00$ 147,875.00$ 119,000.00$
21201-0000 Line A0700 5.330 MILE 12,000.00$ 63,960.00$ 313,137.50$ 154,570.00$
25101-0200 Line A0720 35 CUYD 65.00$ 2,275.00$ 2,625.00$ 4,585.00$
25101-0300 Line A0740 520 CUYD 140.00$ 72,800.00$ 21,970.00$ 68,900.00$
25125-0000 Line A0760 200 EACH 250.00$ 50,000.00$ 56,000.00$ 136,800.00$ 280.00$ 684.00$
42.25$ 132.50$
75.00$ 131.00$
58,750.00$ 29,000.00$
42.25$ 34.00$
11.00$ 52.50$
37.00$ 46.00$
7.10$ 10.00$
6.70$ 7.45$
16.70$ 22.00$
5.70$ 4.40$
4.25$ 4.60$
55.00$ 7.60$
1.30$ 1.75$
4.50$ 4.00$
105.00$ 73.00$
290.00$ 113.00$
1,225.00$ 678.00$
900.00$ 285.00$
REMOVAL OF CURB, ASPHALT
REMOVAL OF CURB, STONE
REMOVAL OF GUARDRAIL
REMOVAL OF PAVEMENT, ASPHALT
REMOVAL OF PAVEMENT, CONCRETE
REMOVAL OF INLET
REMOVAL OF PIPE CULVERT
REMOVAL OF PIPE END SECTION
REMOVAL OF SIGN
REMOVAL OF CURB AND GUTTER, CONCRETE
REMOVAL OF SIDEWALK, ASPHALT
PLACED RIPRAP, METHOD A, CLASS 3
BOULDER
REMOVAL OF SIDEWALK, CONCRETE
SUBEXCAVATION
DITCH, EXCAVATION
BACKFILL, SELECT GRANULAR
LINEAR GRADING
PLACED RIPRAP, METHOD A, CLASS 2
4/6/2018 Page 2 of 6
Project No: Utah UT FTNP ZION 13(1)
Project Name: Kolob Canyons Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Parsons Companies dba Western Rock Sunroc Corporation
25305-1000 Line A0780 150 SQYD 480.00$ 72,000.00$ 154,500.00$ 129,750.00$
25501-1000 Line A0800 3,100 SQFT 50.00$ 155,000.00$ 139,500.00$ 412,300.00$
26101-0000 Line A0820 4,500 SQFT 35.00$ 157,500.00$ 94,500.00$ 540,000.00$
30202-2000 Line A0840 5,000 TON 25.00$ 125,000.00$ 100,000.00$ 107,500.00$
30402-1700 Line A0860 91,100 SQYD 7.25$ 660,475.00$ 364,400.00$ 296,075.00$
30402-1900 Line A0880 16,300 SQYD 10.00$ 163,000.00$ 67,645.00$ 60,310.00$
40101-5600 Line A0900 18,800 TON 95.00$ 1,786,000.00$ 1,936,400.00$ 1,381,800.00$
40105-3000 Line A0920 200 TON 300.00$ 60,000.00$ 200.00$ 63,400.00$
40601-0000 Line A0940 50 TON 500.00$ 25,000.00$ 26,000.00$ 27,800.00$
41101-1000 Line A0960 140 TON 450.00$ 63,000.00$ 94,500.00$ 119,000.00$
41201-0000 Line A0980 50 TON 600.00$ 30,000.00$ 30,000.00$ 27,800.00$
50101-0600 Line A1000 920 SQYD 80.00$ 73,600.00$ 115,000.00$ 112,240.00$
60101-0000 Line A1020 30 CUYD 600.00$ 18,000.00$ 31,500.00$ 59,520.00$
60103-0180 Line A1040 4 EACH 9,000.00$ 36,000.00$ 31,200.00$ 102,600.00$
60201-0400 Line A1060 120 LNFT 190.00$ 22,800.00$ 5,700.00$ 9,360.00$
60201-0600 Line A1080 40 LNFT 75.00$ 3,000.00$ 3,040.00$ 4,280.00$
60201-0800 Line A1100 650 LNFT 100.00$ 65,000.00$ 40,950.00$ 96,850.00$
60201-1000 Line A1120 1,450 LNFT 120.00$ 174,000.00$ 123,250.00$ 301,600.00$
60201-1200 Line A1140 150 LNFT 150.00$ 22,500.00$ 17,250.00$ 36,600.00$ 115.00$ 244.00$
85.00$ 208.00$
63.00$ 149.00$
76.00$ 107.00$
47.50$ 78.00$
7,800.00$ 25,650.00$
1,050.00$ 1,984.00$
125.00$ 122.00$
600.00$ 556.00$
675.00$ 850.00$
520.00$ 556.00$
1.00$ 317.00$
103.00$ 73.50$
4.15$ 3.70$
4.00$ 3.25$
20.00$ 21.50$
21.00$ 120.00$
45.00$ 133.00$
1,030.00$ 865.00$
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
TACK COAT
MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
CONCRETE(CONCRETE HEADWALL PIPE RUNDOWN)
CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT
12-INCH PIPE CULVERT
18-INCH PIPE CULVERT
FULL DEPTH RECLAMATION, METHOD 1, 10-INCH DEPTH
FULL DEPTH RECLAMATION, METHOD 1, 12-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
PRIME COAT, METHOD 1
REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED
MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
REINFORCED SOIL SLOPE
ROADWAY AGGREGATE, METHOD 2
4/6/2018 Page 3 of 6
Project No: Utah UT FTNP ZION 13(1)
Project Name: Kolob Canyons Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Parsons Companies dba Western Rock Sunroc Corporation
60210-0400 Line A1160 6 EACH 1,100.00$ 6,600.00$ 3,150.00$ 1,524.00$
60210-0600 Line A1180 1 EACH 1,900.00$ 1,900.00$ 580.00$ 320.00$
60210-0800 Line A1200 25 EACH 600.00$ 15,000.00$ 20,625.00$ 10,125.00$
60210-1000 Line A1220 26 EACH 750.00$ 19,500.00$ 35,100.00$ 28,600.00$
60210-1200 Line A1240 4 EACH 2,000.00$ 8,000.00$ 8,400.00$ 7,468.00$
60212-0800 Line A1260 2 EACH 650.00$ 1,300.00$ 2,300.00$ 1,000.00$
60403-0000 Line A1280 2 EACH 7,000.00$ 14,000.00$ 7,000.00$ 6,854.00$
60404-1000 Line A1300 33 EACH 3,600.00$ 118,800.00$ 108,900.00$ 105,600.00$
60408-0000 Line A1320 6 EACH 1,000.00$ 6,000.00$ 13,020.00$ 14,820.00$
60409-0100 Line A1340 14 EACH 1,800.00$ 25,200.00$ 18,900.00$ 32,200.00$
60409-0200 Line A1360 19 EACH 1,600.00$ 30,400.00$ 47,500.00$ 63,935.00$
60501-0000 Line A1380 3,450 LNFT 30.00$ 103,500.00$ 434,700.00$ 151,800.00$
60901-0000 Line A1400 950 LNFT 80.00$ 76,000.00$ 42,275.00$ 50,160.00$
60901-1700 Line A1420 33,500 LNFT 40.00$ 1,340,000.00$ 988,250.00$ 1,164,125.00$
60908-1000 Line A1440 900 SQYD 30.00$ 27,000.00$ 49,500.00$ 20,700.00$
60915-1000 Line A1460 19 EACH 200.00$ 3,800.00$ 5,700.00$ 6,612.00$
61501-0200 Line A1480 1,100 SQYD 30.00$ 33,000.00$ 93,500.00$ 95,535.00$
61504-1000 Line A1500 150 SQYD 60.00$ 9,000.00$ 26,100.00$ 25,650.00$
61701-1950 Line A1520 825 LNFT 50.00$ 41,250.00$ 24,337.50$ 58,905.00$
1,350.00$ 1,100.00$
825.00$ 405.00$
580.00$ 320.00$
525.00$ 254.00$
JUNCTION BOX
END SECTION FOR 12-INCH PIPE CULVERT
END SECTION FOR 18-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
WHEELSTOP, CONCRETE
SIDEWALK, COLORED CONCRETE
ACCESSIBILITY RAMP, CONCRETE(COLORED)
GUARDRAIL SYSTEM G4, TYPE 4, CLASS B STEEL POSTS
INLET TOP, METAL FRAME AND GRATE, FLH TYPE A
INLET TOP, METAL FRAME AND GRATE, FLH TYPE B
STANDARD UNDERDRAIN SYSTEM
CURB, CONCRETE(COLORED, DRAINAGE)
CURB, CONCRETE, 18-INCH DEPTH(COLORED)
PAVED DITCH, ASPHALT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
ELBOW, 24-INCH
INLET
CATCH BASIN, FLH TYPE 1
2,100.00$ 1,867.00$
3,500.00$ 3,427.00$
1,150.00$ 500.00$
2,170.00$ 2,470.00$
3,300.00$ 3,200.00$
2,500.00$ 3,365.00$
1,350.00$ 2,300.00$
44.50$ 52.80$
126.00$ 44.00$
55.00$ 23.00$
29.50$ 34.75$
85.00$ 86.85$
300.00$ 348.00$
29.50$ 71.40$
174.00$ 171.00$
4/6/2018 Page 4 of 6
Project No: Utah UT FTNP ZION 13(1)
Project Name: Kolob Canyons Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Parsons Companies dba Western Rock Sunroc Corporation
61702-1200 Line A1540 6 EACH 3,500.00$ 21,000.00$ 12,300.00$ 67,380.00$
61901-2400 Line A1560 130 LNFT 25.00$ 3,250.00$ 3,770.00$ 2,470.00$
61902-0000 Line A1580 3 EACH 5,000.00$ 15,000.00$ 9,600.00$ 1,332.00$
62201-0200 Line A1600 120 HOUR 110.00$ 13,200.00$ 13,200.00$ 10,680.00$
62201-2050 Line A1620 120 HOUR 140.00$ 16,800.00$ 13,200.00$ 14,520.00$
62201-2850 Line A1640 120 HOUR 160.00$ 19,200.00$ 19,200.00$ 22,440.00$
62201-3300 Line A1660 120 HOUR 190.00$ 22,800.00$ 19,200.00$ 19,680.00$
62301-0000 Line A1680 80 HOUR 50.00$ 4,000.00$ 3,200.00$ 3,812.00$
62302-0100 Line A1700 80 HOUR 275.00$ 22,000.00$ 3,600.00$ 34,960.00$
62302-1000 Line A1720 100 HOUR 200.00$ 20,000.00$ 14,000.00$ 15,800.00$
62302-1100 Line A1740 100 HOUR 225.00$ 22,500.00$ 15,000.00$ 12,600.00$
63301-0000 Line A1760 51 EACH 450.00$ 22,950.00$ 19,890.00$ 22,593.00$
63309-0100 Line A1780 226 EACH 50.00$ 11,300.00$ 23,730.00$ 27,120.00$
63316-1000 Line A1800 15 EACH 325.00$ 4,875.00$ 4,950.00$ 5,700.00$
63401-0300 Line A1820 126,400 LNFT 0.30$ 37,920.00$ 16,432.00$ 18,960.00$
63405-0050 Line A1840 41 EACH 75.00$ 3,075.00$ 3,649.00$ 33,825.00$
63502-0600 Line A1860 2 EACH 400.00$ 800.00$ 660.00$ 630.00$
63502-2000 Line A1880 1 EACH 9,500.00$ 9,500.00$ 10,000.00$ 5,700.00$
63504-1000 Line A1900 85 SQFT 35.00$ 2,975.00$ 1,666.00$ 667.25$
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SPECIAL LABOR, SLOPE SCALING
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SIGN SYSTEM
DELINEATOR, TYPE 1
REMOVE AND RESET SIGN
GATE
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
ROLLER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
TERMINAL SECTION, TYPE LST(G4-W LOW SPEED)
FENCE, SPLIT RAIL, 2 RAIL
29.00$ 19.00$
2,050.00$ 11,230.00$
110.00$ 89.00$
3,200.00$ 444.00$
160.00$ 187.00$
110.00$ 121.00$
40.00$ 47.65$
160.00$ 164.00$
140.00$ 158.00$
45.00$ 437.00$
390.00$ 443.00$
150.00$ 126.00$
330.00$ 380.00$
105.00$ 120.00$
89.00$ 825.00$
0.13$ 0.15$
10,000.00$ 5,700.00$
330.00$ 315.00$
19.60$ 7.85$
4/6/2018 Page 5 of 6
Project No: Utah UT FTNP ZION 13(1)
Project Name: Kolob Canyons Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Parsons Companies dba Western Rock Sunroc Corporation
63506-0500 Line A1920 360 HOUR 45.00$ 16,200.00$ 12,780.00$ 16,020.00$
63602-6020 Line A1940 2 EACH 9,000.00$ 18,000.00$ 40,000.00$ 45,600.00$
63610-1600 Line A1960 2,300 LNFT 50.00$ 115,000.00$ 35,650.00$ 40,825.00$
64620-0600 Line A1980 4 EACH 600.00$ 2,400.00$ 3,200.00$ 1,400.00$
TEMPORARY TRAFFIC CONTROL, FLAGGER
SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
CONDUIT, 2-INCH, PVC
REMOVE AND RESET TRASH RECEPTACLE
35.50$ 44.50$
15.50$ 17.75$
20,000.00$ 22,800.00$
800.00$ 350.00$
4/6/2018 Page 6 of 6
Option V Total of Bid Items: 550,650.00$ -22.3% 427,600.00$ 31.5% 723,970.00$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Kolob Canyons Comfort Stations CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line V0020 ALL LPSM 63,400.00$ 63,400.00$ 12,300.00$ 9,100.00$
15201-0000 Line V0040 ALL LPSM 10,000.00$ 10,000.00$ 6,700.00$ 2,300.00$
15301-0000 Line V0060 ALL LPSM 10,000.00$ 10,000.00$ 13,900.00$ 15,800.00$
20301-2100 Line V0080 1 EACH 20,000.00$ 20,000.00$ 12,400.00$ 6,670.00$
61501-0200 Line V0100 100 SQYD 30.00$ 3,000.00$ 9,500.00$ 8,800.00$
62302-1000 Line V0120 10 HOUR 200.00$ 2,000.00$ 1,400.00$ 1,580.00$
62302-1100 Line V0140 10 HOUR 225.00$ 2,250.00$ 1,400.00$ 1,260.00$
64601-1000 Line V0160 2 EACH 142,000.00$ 284,000.00$ 230,000.00$ 437,400.00$
64601-1000 Line V0180 1 EACH 156,000.00$ 156,000.00$ 140,000.00$ 241,060.00$
Engineer's Estimate
140,000.00$ 241,060.00$
115,000.00$ 218,700.00$
140.00$ 126.00$
140.00$ 158.00$
95.00$ 88.00$
2,300.00$
13,900.00$ 15,800.00$ ker & Parsons dba Western Rock Produ Sunroc Corporation
6,700.00$
12,300.00$ 9,100.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
SPECIAL LABOR, HIRED SURVEY SERVICES
BUILDING, RESTROOM FACILITY(DOUBLE)
BUILDING, RESTROOM FACILITY(TRIPLE)
SIDEWALK, COLORED CONCRETE(COLORED)
SPECIAL LABOR, HIRED TECHNICAL SERVICES
REMOVAL OF RESTROOM FACILITY
12,400.00$ 6,670.00$
4/6/2018 Page 1 of 1
Option W Total of Bid Items: 548,495.00$ -7.1% 509,802.00$ -5.5% 518,181.50$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Zion Lodge Entrance Intersection CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line W0020 ALL LPSM 62,000.00$ 62,000.00$ 44,000.00$ 23,500.00$
15201-0000 Line W0040 ALL LPSM 10,000.00$ 10,000.00$ 5,000.00$ 4,052.00$
15301-0000 Line W0060 ALL LPSM 16,000.00$ 16,000.00$ 16,700.00$ 18,995.00$
15401-0000 Line W0080 ALL LPSM 20,000.00$ 20,000.00$ 4,200.00$ 6,335.00$
15501-0000 Line W0100 ALL LPSM 3,000.00$ 3,000.00$ 550.00$ 1,536.00$
15802-0000 Line W0120 ALL LPSM 3,000.00$ 3,000.00$ 11,000.00$ 1,846.00$
20301-1100 Line W0140 2 EACH 400.00$ 800.00$ 2,200.00$ 470.00$
20301-2400 Line W0160 1 EACH 25.00$ 25.00$ 550.00$ 167.00$
20303-1600 Line W0180 1,950 SQYD 3.00$ 5,850.00$ 16,770.00$ 9,067.50$
25126-0000 Line W0200 12 EACH 400.00$ 4,800.00$ 3,960.00$ 2,760.00$
30202-2000 Line W0220 650 TON 25.00$ 16,250.00$ 23,855.00$ 23,725.00$
50101-0900 Line W0240 2,180 SQYD 140.00$ 305,200.00$ 318,280.00$ 300,840.00$
61902-0000 Line W0260 2 EACH 5,000.00$ 10,000.00$ 6,600.00$ 890.00$
62201-0200 Line W0280 10 HOUR 110.00$ 1,100.00$ 1,100.00$ 1,350.00$
62201-2850 Line W0300 10 HOUR 160.00$ 1,600.00$ 1,600.00$ 1,870.00$
62201-3300 Line W0320 10 HOUR 190.00$ 1,900.00$ 1,600.00$ 1,640.00$
62301-0000 Line W0340 20 HOUR 50.00$ 1,000.00$ 800.00$ 953.00$
62302-1000 Line W0360 10 HOUR 200.00$ 2,000.00$ 1,400.00$ 1,580.00$
62302-1100 Line W0380 10 HOUR 225.00$ 2,250.00$ 1,400.00$ 1,270.00$
Engineer's Estimate
140.00$ 127.00$
140.00$ 158.00$
40.00$ 47.65$
160.00$ 164.00$
160.00$ 187.00$
110.00$ 135.00$
3,300.00$ 445.00$
146.00$ 138.00$
36.70$ 36.50$
330.00$ 230.00$
8.60$ 4.65$
550.00$ 167.00$
1,100.00$ 235.00$
11,000.00$ 1,846.00$
550.00$ 1,536.00$
4,052.00$
16,700.00$ 18,995.00$ aker Parson dba Western Rock Produc Sunroc Corporation
5,000.00$
44,000.00$ 23,500.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
REMOVAL OF GATE
REMOVAL OF SIGN
REMOVAL OF PAVEMENT, ASPHALT
REMOVE AND RESET BOULDER
ROADWAY AGGREGATE, METHOD 2
MINOR CONCRETE PAVEMENT, REINFORCED, 9-INCH DEPTH
SPECIAL LABOR, HIRED SURVEY SERVICES
CONSTRUCTION SCHEDULE
WATERING FOR DUST CONTROL
GATE
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
CONTRACTOR TESTING
4,200.00$ 6,335.00$
4/6/2018 Page 1 of 2
Option W Total of Bid Items: 548,495.00$ -7.1% 509,802.00$ -5.5% 518,181.50$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Zion Lodge Entrance Intersection CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate aker Parson dba Western Rock Produc Sunroc Corporation
63301-0000 Line W0400 1 EACH 450.00$ 450.00$ 390.00$ 445.00$
63401-0300 Line W0420 900 LNFT 0.30$ 270.00$ 117.00$ 135.00$
63501-2000 Line W0440 ALL LPSM 25,000.00$ 25,000.00$ 5,000.00$ 24,800.00$
63502-1050 Line W0460 40 EACH 50.00$ 2,000.00$ 1,020.00$ 11,120.00$
63504-1000 Line W0480 100 SQFT 35.00$ 3,500.00$ 1,960.00$ 785.00$
63506-0500 Line W0500 900 HOUR 45.00$ 40,500.00$ 31,950.00$ 40,050.00$
65001-1000 Line W0520 ALL LPSM 10,000.00$ 10,000.00$ 7,800.00$ 38,000.00$ 7,800.00$ 38,000.00$
35.50$ 44.50$
19.60$ 7.85$
25.50$ 278.00$
5,000.00$ 24,800.00$
0.13$ 0.15$
390.00$ 445.00$
TEMPORARY TRAFFIC CONTROL, FLAGGER
CONSTRUCT AND MAINTAIN DIVERSION
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE B, SOLID
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
4/6/2018 Page 2 of 2
Option X Total of Bid Items: 1,420,800.00$ -15.1% 1,206,039.00$ -24.1% 1,078,884.50$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Zion Scenic Drive CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line X0020 ALL LPSM 159,400.00$ 159,400.00$ 21,850.00$ 59,400.00$
15210-3000 Line X0040 3.380 MILE 5,000.00$ 16,900.00$ 7,774.00$ 6,084.00$
15215-3000 Line X0060 1 EACH 600.00$ 600.00$ 450.00$ 2,700.00$
15215-7000 Line X0080 1 EACH 6,000.00$ 6,000.00$ 5,000.00$ 8,100.00$
15301-0000 Line X0100 ALL LPSM 30,000.00$ 30,000.00$ 28,900.00$ 33,000.00$
15401-0000 Line X0120 ALL LPSM 30,000.00$ 30,000.00$ 15,500.00$ 25,850.00$
15501-0000 Line X0140 ALL LPSM 5,000.00$ 5,000.00$ 550.00$ 3,850.00$
15802-0000 Line X0160 ALL LPSM 5,000.00$ 5,000.00$ 2,200.00$ 13,200.00$
20301-2400 Line X0180 12 EACH 150.00$ 1,800.00$ 1,260.00$ 1,500.00$
20302-0600 Line X0200 15 LNFT 80.00$ 1,200.00$ 1,650.00$ 315.00$
20303-1600 Line X0220 90 SQYD 20.00$ 1,800.00$ 5,220.00$ 585.00$
20402-0000 Line X0240 180 CUYD 30.00$ 5,400.00$ 8,100.00$ 11,340.00$
20435-1000 Line X0260 50 CUYD 60.00$ 3,000.00$ 2,500.00$ 2,925.00$
30202-2000 Line X0280 650 TON 25.00$ 16,250.00$ 26,000.00$ 23,400.00$
40101-0700 Line X0300 6,100 TON 135.00$ 823,500.00$ 780,800.00$ 634,400.00$
40105-3000 Line X0320 65 TON 300.00$ 19,500.00$ 65.00$ 20,605.00$
40601-0000 Line X0340 25 TON 500.00$ 12,500.00$ 13,250.00$ 12,225.00$
41201-0000 Line X0360 25 TON 600.00$ 15,000.00$ 15,000.00$ 12,225.00$
41301-0600 Line X0380 53,700 SQYD 2.50$ 134,250.00$ 174,525.00$ 101,493.00$
SURVEY AND STAKING, PARKING AREA
5,000.00$ 8,100.00$
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, DRAINAGE STRUCTURE
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
TACK COAT
CONSTRUCTION SCHEDULE
WATERING FOR DUST CONTROL
REMOVAL OF SIGN
REMOVAL OF CURB, STONE
REMOVAL OF PAVEMENT, ASPHALT
SUBEXCAVATION
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
BACKFILL, SELECT GRANULAR
ROADWAY AGGREGATE, METHOD 2
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 3 TO <30 MILLION ESAL(SMA MIX)
59,400.00$ ker & Parsons dba Western Rock Produ Sunroc Corporation
2,300.00$
21,850.00$
28,900.00$ 33,000.00$
1,800.00$
450.00$ 2,700.00$
2,200.00$ 13,200.00$
550.00$ 3,850.00$
15,500.00$ 25,850.00$
110.00$ 21.00$
105.00$ 125.00$
45.00$ 63.00$
58.00$ 6.50$
40.00$ 36.00$
50.00$ 58.50$
1.00$ 317.00$
128.00$ 104.00$
600.00$ 489.00$
530.00$ 489.00$
3.25$ 1.89$
Engineer's Estimate
Option X Total of Bid Items: 1,420,800.00$ -15.1% 1,206,039.00$ -24.1% 1,078,884.50$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Zion Scenic Drive CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount ker & Parsons dba Western Rock Produ Sunroc CorporationEngineer's Estimate
50101-0600 Line X0400 130 SQYD 120.00$ 15,600.00$ 16,250.00$ 15,860.00$
60915-1000 Line X0420 4 EACH 200.00$ 800.00$ 1,200.00$ 1,400.00$
61501-0200 Line X0440 60 SQYD 50.00$ 3,000.00$ 5,700.00$ 5,250.00$
61509-0000 Line X0460 8 SQYD 275.00$ 2,200.00$ 4,280.00$ 4,560.00$
62201-0200 Line X0480 10 HOUR 110.00$ 1,100.00$ 1,100.00$ 890.00$
62201-2850 Line X0500 10 HOUR 160.00$ 1,600.00$ 1,600.00$ 1,870.00$
62201-3300 Line X0520 10 HOUR 190.00$ 1,900.00$ 1,600.00$ 1,640.00$
62301-0000 Line X0540 40 HOUR 50.00$ 2,000.00$ 1,600.00$ 1,900.00$
62302-1000 Line X0560 10 HOUR 200.00$ 2,000.00$ 1,400.00$ 1,580.00$
62302-1100 Line X0580 10 HOUR 225.00$ 2,250.00$ 1,400.00$ 1,270.00$
63301-0000 Line X0600 2 EACH 450.00$ 900.00$ 1,540.00$ 890.00$
63401-0300 Line X0620 79,500 LNFT 0.30$ 23,850.00$ 10,335.00$ 11,925.00$
63405-0050 Line X0640 2 EACH 75.00$ 150.00$ 180.00$ 202.00$
63501-2000 Line X0660 ALL LPSM 25,000.00$ 25,000.00$ 5,000.00$ 5,330.00$
63503-0700 Line X0680 36,000 LNFT 0.30$ 10,800.00$ 9,720.00$ 10,800.00$
63504-1000 Line X0700 130 SQFT 35.00$ 4,550.00$ 2,600.00$ 1,020.50$
63506-0500 Line X0720 600 HOUR 45.00$ 27,000.00$ 21,300.00$ 26,700.00$
63506-0700 Line X0740 120 HOUR 75.00$ 9,000.00$ 8,640.00$ 12,600.00$
SIGN SYSTEM
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
WHEELSTOP, CONCRETE
SIDEWALK, COLORED CONCRETE
DETECTABLE WARNING PANELS
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
125.00$ 122.00$
95.00$ 87.50$
300.00$ 350.00$
110.00$ 89.00$
535.00$ 570.00$
160.00$ 164.00$
160.00$ 187.00$
140.00$ 158.00$
40.00$ 47.50$
770.00$ 445.00$
140.00$ 127.00$
90.00$ 101.00$
0.13$ 0.15$
0.27$ 0.30$
5,000.00$ 5,330.00$
35.50$ 44.50$
20.00$ 7.85$
72.00$ 105.00$
Option Y Total of Bid Items: 1,128,708.60$ -15.3% 955,973.00$ -23.2% 867,026.50$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Zion Scenic Drive CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line Y0020 ALL LPSM 128,988.60$ 128,988.60$ 24,000.00$ 70,865.00$
15210-3000 Line Y0040 2.750 MILE 5,000.00$ 13,750.00$ 6,325.00$ 4,565.00$
15301-0000 Line Y0060 ALL LPSM 30,000.00$ 30,000.00$ 29,000.00$ 33,000.00$
15401-0000 Line Y0080 ALL LPSM 30,000.00$ 30,000.00$ 12,500.00$ 23,720.00$
15501-0000 Line Y0100 ALL LPSM 5,000.00$ 5,000.00$ 550.00$ 7,685.00$
30202-2000 Line Y0120 500 TON 25.00$ 12,500.00$ 20,000.00$ 17,500.00$
40101-0700 Line Y0140 4,800 TON 135.00$ 648,000.00$ 628,800.00$ 499,200.00$
40105-3000 Line Y0160 55 TON 300.00$ 16,500.00$ 55.00$ 17,380.00$
40601-0000 Line Y0180 20 TON 500.00$ 10,000.00$ 10,600.00$ 9,300.00$
41201-0000 Line Y0200 20 TON 600.00$ 12,000.00$ 12,000.00$ 9,300.00$
41301-0600 Line Y0220 43,000 SQYD 2.50$ 107,500.00$ 139,750.00$ 81,270.00$
62201-0200 Line Y0240 10 HOUR 110.00$ 1,100.00$ 1,100.00$ 890.00$
62201-2850 Line Y0260 10 HOUR 160.00$ 1,600.00$ 1,600.00$ 1,870.00$
62201-3300 Line Y0280 10 HOUR 190.00$ 1,900.00$ 1,600.00$ 1,650.00$
62301-0000 Line Y0300 40 HOUR 50.00$ 2,000.00$ 1,600.00$ 1,906.00$
62302-1000 Line Y0320 10 HOUR 200.00$ 2,000.00$ 1,400.00$ 1,580.00$
62302-1100 Line Y0340 10 HOUR 225.00$ 2,250.00$ 1,400.00$ 1,270.00$
63401-0300 Line Y0360 60,700 LNFT 0.30$ 18,210.00$ 7,891.00$ 9,105.00$
63501-2000 Line Y0380 ALL LPSM 25,000.00$ 25,000.00$ 5,000.00$ 2,850.00$
Engineer's Estimate
5,000.00$ 2,850.00$
0.13$ 0.15$
140.00$ 127.00$
140.00$ 158.00$
40.00$ 47.65$
160.00$ 165.00$
160.00$ 187.00$
110.00$ 89.00$
3.25$ 1.89$
600.00$ 465.00$
530.00$ 465.00$
1.00$ 316.00$
131.00$ 104.00$
40.00$ 35.00$
550.00$ 7,685.00$
1,660.00$
29,000.00$ 33,000.00$ ker & Parsons dba Western Rock Produ Sunroc Corporation
2,300.00$
24,000.00$ 70,865.00$
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
CONTRACTOR QUALITY CONTROL
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PAVEMENT MARKINGS, TYPE B, SOLID
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 3 TO <30 MILLION ESAL(SMA MIX)
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL
TACK COAT
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
CONSTRUCTION SCHEDULE
ROADWAY AGGREGATE, METHOD 2
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
CONTRACTOR TESTING
12,500.00$ 23,720.00$
Option Y Total of Bid Items: 1,128,708.60$ -15.3% 955,973.00$ -23.2% 867,026.50$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Zion Scenic Drive CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate ker & Parsons dba Western Rock Produ Sunroc Corporation
63503-0700 Line Y0400 29,200 LNFT 0.30$ 8,760.00$ 7,884.00$ 8,760.00$
63504-1000 Line Y0420 130 SQFT 35.00$ 4,550.00$ 2,548.00$ 1,020.50$
63506-0500 Line Y0440 480 HOUR 45.00$ 21,600.00$ 17,040.00$ 21,360.00$
63506-0600 Line Y0460 240 HOUR 75.00$ 18,000.00$ 16,080.00$ 30,480.00$
63506-0700 Line Y0480 100 HOUR 75.00$ 7,500.00$ 7,250.00$ 10,500.00$ 72.50$ 105.00$
67.00$ 127.00$
35.50$ 44.50$
19.60$ 7.85$
0.27$ 0.30$
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Option Z Total of Bid Items: 96,060.00$ -10.1% 86,316.00$ -22.1% 74,828.50$
Project No: Utah UT FTNP ZION 13(1)
Project Name: Zion Lodge Parking CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line Z0020 ALL LPSM 1,000.00$ 1,000.00$ 4,600.00$ 4,750.00$
15201-0000 Line Z0040 ALL LPSM 3,000.00$ 3,000.00$ 5,000.00$ 3,550.00$
15301-0000 Line Z0060 ALL LPSM 2,000.00$ 2,000.00$ 5,550.00$ 6,330.00$
15401-0000 Line Z0080 ALL LPSM 1,000.00$ 1,000.00$ 2,200.00$ 2,530.00$
40105-3000 Line Z0100 5 TON 350.00$ 1,750.00$ 5.00$ 1,585.00$
40301-0000 Line Z0120 420 TON 160.00$ 67,200.00$ 46,830.00$ 36,960.00$
40601-0000 Line Z0140 3 TON 190.00$ 570.00$ 1,590.00$ 1,599.00$
41201-0000 Line Z0160 2 TON 600.00$ 1,200.00$ 1,200.00$ 1,066.00$
41301-0600 Line Z0180 3,700 SQYD 2.50$ 9,250.00$ 12,025.00$ 9,139.00$
62301-0000 Line Z0200 10 HOUR 50.00$ 500.00$ 400.00$ 476.50$
62302-1000 Line Z0220 10 HOUR 200.00$ 2,000.00$ 1,400.00$ 1,580.00$
62302-1100 Line Z0240 10 HOUR 225.00$ 2,250.00$ 1,400.00$ 1,270.00$
63401-0300 Line Z0260 2,200 LNFT 0.10$ 220.00$ 1,342.00$ 1,540.00$
63405-0050 Line Z0280 2 EACH 110.00$ 220.00$ 178.00$ 202.00$
63504-1000 Line Z0300 60 SQFT 35.00$ 2,100.00$ 1,176.00$ 471.00$
63506-0500 Line Z0320 40 HOUR 45.00$ 1,800.00$ 1,420.00$ 1,780.00$
Engineer's Estimate
35.50$ 44.50$
19.60$ 7.85$
89.00$ 101.00$
0.61$ 0.70$
140.00$ 127.00$
140.00$ 158.00$
40.00$ 47.65$
3.25$ 2.47$
600.00$ 533.00$
530.00$ 533.00$
111.50$ 88.00$
1.00$ 317.00$
3,550.00$
5,550.00$ 6,330.00$ ker & Parsons dba Western Rock Produ Sunroc Corporation
5,000.00$
4,600.00$ 4,750.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
TEMPORARY TRAFFIC CONTROL, FLAGGER
FOG SEAL
TACK COAT
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
ANTISTRIP ADDITIVE, TYPE 3
ASPHALT CONCRETE PAVEMENT
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, SYMBOLS
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
CONTRACTOR TESTING
2,200.00$ 2,530.00$
4/6/2018 Page 1 of 1