Questions and Answers during Advertisement for UT FLAP 70131(1) Strawberry Sheep Creek

October 29, 2019

Questions Answers 1 Need to confirm the wording under Item 3 sheet G6 stating reinforcement geosynthetic, type II is required the same as the Reinforcement Geotextile, Type II as mentioned on the elevation view of the reinforced soil slope. The specification under table 714-6 is referring to geogrid.

In the calculations and geotechnical report, we had assumed use of geogrid due to the large maximum particle size that we are allowing in the RSS fill. The geotextile label on the RSS section is incorrect. Geosynthetic reinforcement is a broader term that includes both geotextiles and geogrids.